FLOOD DAMAGE

Dealing with flood and stormdamaged buildings In a natural disaster, Civil Defence conducts rapid building assessments and issues stickers to identify buildings that have been damaged and those that present a severe safety risk. The sticker's colour indicates what access you can have to the building. Red Sticker

Follow-up assessment

A red sticker means no one is allowed to enter the building because of the high level of risk. This risk might be the building itself, but it DO NOT REMOVE THIS NOTICE might also be from nearby buildings or unstable land. A builder who wants to assess the site for remedial action will need special clearance from the local council.

Initial assessments carried out by Civil Defence are rapid – taking about 20 minutes – and can sometimes be completed by inspectors from outside the building without needing to enter.

Yellow Sticker

Insurance companies often have "preferred suppliers" and may direct the homeowner to use tradespeople, designers and geo-tech engineers on their "preferred" list.

ENTRY PROHIBITED (THIS IS NOT A DEMOLITION ORDER)

There has been a quick visual inspection of this building:

 

This building is at risk from an external hazard This building has been seriously damaged

Building Name and Address: _______________________________ ____________________________________________________ ____________________________________________________ This building has been subject to a rapid assessment:

Description of hazard observed: ____________________________

 Exterior Only  Exterior and Interior

____________________________________________________ ____________________________________________________

Extent of barricades required: _____________________________ ____________________________________________________ ____________________________________________________ ____________________________________________________

 Diagram attached showing restricted areas

Access is not permitted without written authorisation from the Civil Defence Emergency Management Controller or other Responsible Person.

Assessor ID: _________________________________________

Date: __________________________Time: ________________

This placard has been placed on behalf of the CDEM Controller or other Responsible Person under the authority of s133BT of the Building Act 2004 or the Civil Defence Emergency Management Act 2002 (cross out as applicable). For further information: •

https://www.building.govt.nz/managing-buildings/managing-buildings-inan-emergency/

For enquires about this building: ____________________

Version three published 2019

____________________________________________________

A yellow sticker means that entry to the building is restricted, except under supervision for a limited time or on DO NOT REMOVE THIS NOTICE essential business. This could be for assessment purposes, which means a builder could inspect the property and evaluate what remedial work is required.

RESTRICTED ACCESS  TO PART(S) OF THE BUILDING ONLY  SHORT TERM ENTRY ONLY  Access to be supervised by a person authorised by the issuing authority

There has been a quick visual inspection of this building:

Building Name and Address: _______________________________

This building has been damaged and its structural safety is questionable

____________________________________________________

Enter only at own risk

____________________________________________________

Future events may cause more damage that may change this assessment

This building has been subject to a rapid assessment:

 Exterior Only  Exterior and Interior

Description of hazard observed: _______________________________

________________________________________________________ Restricted areas are: ________________________________________

Date: __________________________Time: ________________

Removal of essential documents/valuables only Removal of property Other: ______________________________________

This placard has been placed on behalf of the CDEM Controller or other Responsible Person under the authority of s133BT of the Building Act 2004 or the Civil Defence Emergency Management Act 2002 (cross out as applicable). For further information:

____________________________________________

 Diagram attached showing restricted areas

https://www.building.govt.nz/managing-buildings/managing-buildings-inan-emergency/

For enquires about this building: ____________________

Version three published 2019

  

Put your safety first

Assessor ID: _________________________________________

________________________________________________________ Restrictions on use:

After the rapid assessment process, Civil Defence emergency management and council officials can direct the owner of a building to obtain a detailed assessment of the building. These assessments are the responsibility of a building owner and will usually involve input from the owner's insurance company.

You will need to coordinate any visit with the owners, the council and the insurance company, which will require a detailed quote for any remedial work required.

If you are assessing a damaged building or plan to do remedial work, you must take all possible measures to safeguard yourself and your team. While SiteSafe has rules and guidelines for work site safety, there are some additional steps you should take when dealing with flood and storm-damaged buildings. For more information go to: www.chasnz.org/ articles/auckland-flood-remediation-how-to-keephealthy-and-safe-while-working-on-flood-damagedproperty

White Sticker

NO RESTRICTIONS ON ACCESS

Building Name and Address: _______________________________

No obvious structural problems were observed, but;

____________________________________________________

This does not mean that the building is completely safe

____________________________________________________

This does not mean that the building is not damaged

Future events may cause more damage that may change this assessment

This building has been subject to a rapid assessment:

 Exterior Only  Exterior and Interior

The following items have generally not been inspected: • •

Utilities (electrical, gas, water, sanitary facilities, etc)

Assessor ID: _________________________________________

Secondary elements (ceilings, windows, fittings, etc)

Date: __________________________Time: ________________

Building owners and tenants have an important role in regard to the future safety of occupants and the public: •

The owner should organise for someone to look at the building more thoroughly

Tell the issuing authority if you find anything that could be dangerous

This placard has been placed on behalf of the CDEM Controller or other Responsible Person under the authority of s133BT of the Building Act 2004 or the Civil Defence Emergency Management Act 2002 (cross out as applicable). For further information: •

https://www.building.govt.nz/managing-buildings/managing-buildings-inan-emergency/

For enquires about this building: ___________________

Version three published 2019

There has been a quick visual inspection of this building:

What can be salvaged and re-used?

You can read the story here: www.itm.co.nz/demolition

Demolition or Weighing up deconstruction? the cost

With landfill costs going through the inflation in recent roof and signific years, astute ant building builders are rebuilds and material starting to review major renova tion projects. how they approa ch

The tradition al approach of demolish structures and ing existing carting the waste to the doesn’t stack dump up like it used to. In many deconstruction cases, is a much better option whereby valuable materials and fittings can be salvaged be re-used, re-purposed to or on-sold.

A new approac h While there is no doubt that deconstr better option uction is a environmentally, there has always been debate about the economi c benefits, with demolition generally considered the cheapest option. But that’s changing . In 2020, Kāinga Ora carried out a public deconstruction housing project at a Mount Albert development in Auckland known as Martin Leone. As part of a pilot program me, 8 of the houses were 10 existing removed using deconstruction, two homes and were lifted offsite for resale—t resulted in an he project 85% diversion from landfill. Crucially, the analysis showed the cost and of the deconstr duration uction were similar to conventi demolition. onal

High-value

components

As the land value in establish ed residenti increases, it al areas often makes sense to demolish existing house the on the site and build a new where regulatio one, or ns allow, build two or more homes.

Nowadays, a better choice is to relocate or deconstruct the house it to recover valuable compone that cannot easily be sourced. nts Some example include native s timber framing, joists, trusses, weatherboards, flooring, multi-pa ned windows doors, architect , ural mouldin gs, unique plumbin and electrical fixtures. g

Kitchens and

bathrooms

With kitchen or bathroom renovations, principle applies. Cabinetry, applianc the same and light fittings es, plumbin g can all be re-used. start a project, Before you talk to your customer about benefits of deconstr the uction and make together. a plan There will be charity groups within your that will be community happy to help. Another option local recycling is your centre; sell usable househo most centres have shops that ld items and building materials .

Other options include Trade Me, Faceboo Marketplace, k or exchanging materials through sites such as Freecycle (nz.freec ycle.org), Waste Exchange (nothrow .co.nz) or by using the Civilshare app (civilshar e.co.nz). Building A guide for

To find out more about managing your construction waste, visit the construction waste section at makethem ostofwaste.co.nz Find out more: phone or visit makethemostofwaste.co.nz 09 301 0101

Out Waste

developers

and building

contractors

11

ITY

Flood-damaged homes are particularly challenging when deciding what can be salvaged and re-used. Building Business recently published a story evaluating the pros and cons of demolishing a home versus deconstructing it.

SUSTAINABIL

A white sticker means the building "may be damaged" but is safe to occupy. You can access these sites by arrangement with DO NOT REMOVE THIS NOTICE owners to assess any damage and estimate the cost of remedial work. Many white stickered properties may have sustained minimal water damage in the garage or minor surface flooding.

CAN BE USED