CESA Aon Awards publication 2021

Page 11

Projects with a value between R250 million and R1 billion

Mareesburg Tailings Storage Facility (Phase 2) by SRK Consulting for Anglo American Platinum, Limpopo

PROJECT TEAM

Client: Anglo American Platinum Design & Construction Management: SRK Consulting Contractor: Stefanutti Stocks

S

erving the Mototolo Concentrator near Steelpoort in Limpopo, the Mareesburg Tailings Storage Facility (TSF)

is Anglo American Platinum’s first TSF to be built on a high-density polyethylene (HDPE) liner. The locally manufactured dual-textured HDPE liner was used in place of previously imported liners, requiring detailed analysis before acceptance. SRK Consulting (appointed to do the design and construction of the TSF) had to embark upon an extensive research and

testing process, while engaging with regulatory bodies. While it enhanced the environmental performance of the TSL, the inclusion of the HDPE liner also introduced a number of technical challenges that SRK was required to resolve in its design. Among the challenges was the lack of economically accessible clay material to create the layers beneath the HDPE liner, as normally required by environmental regulations. Testing revealed that the permeability characteristics of tailings from the plant were similar in important To ensure stability on this hillside facility,

of natural material. No commercial

rigorous testing was conducted on the

sources for such aggregate were locally

TSF site is generally steep, extending

liner strength, by a specialised laboratory

available. Therefore, the design included

from the base of a hill at an elevation

abroad. In response to a lack of suitable

the on-site manufacture of the requisite

of 1 077 metres above mean sea level

locally sourced and commercially available

sized aggregate from the mine’s waste

(mamsl) up the hill to a final proposed

material, the project created an alternative

rock facility. These drains were selected

elevation of 1 190 mamsl. This variability

granular material from mine waste rock.

as a safety risk mitigation, in place of

respects to clay, and this was used instead. Furthermore, the topography of the

of the geology affected the founding

The client required an alternative to

more common plastic drainage systems,

conditions for the structures and sourcing

plastic pipes in the drainage system,

due to the concern of their long-term

of construction materials.

leading SRK to design drains and filters

deformation and failure.

C E S A A o n E n g i n e e r i n g E x c e l l e n c e Aw a r d s 2 0 2 1

9


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
CESA Aon Awards publication 2021 by 3S Media - Issuu