Skip to main content

Resilient Main Street CZM Report- Wareham, MA

Page 30

MAXIMIZE REDEVELOPMENT ALTERNATIVE DESCRIPTION  The goal of this alternative is to redevelop and adapt Merchant’s Way to enhance resiliency and

maintain commercial space.

 Voluntary buy-out of buildings that cannot be floodproofed in the proposed “sponge park” area.  Redevelop “red” buildings to reduce flood risk to the Base Flood Elevation (maximum of 10 feet

above street level) using a combination of raised buildings and dry floodproofing.

 Create a 3- to 4-foot high elevated feature, such as a vegetated berm terraced hardscaped

feature, or planters along the MBTA Right of Way.  Maintain one-way vehicular access to the extent practical on Merchant’s Way.  Provide a gateway treatment delineation/raised surface to enhance pedestrian connectivity

between Besse Park and future Sponge Park.


Turn static files into dynamic content formats.

Create a flipbook
Resilient Main Street CZM Report- Wareham, MA by Fuss & O'Neill - Issuu