Size: Two phases: Phase 1: 90m2 Phase 2: 120m2 Total: 210m2 Timeline: Design Mar - Aug 2017 (6 Months) Build 2.5months Cost: R1.3million Location: Rosebank, Johannesburg
P R O J E C T
T W O
THE KEYES ART MILE THE FUTURE OF URBAN LIVING
Size: Two phases: Phase 1: 90m2 Phase 2: 120m2 Total: 210m2 Timeline: Design Mar - Aug 2017 (6 Months) Build 2.5months Cost: R1.3million Location: Rosebank, Johannesburg
P R O J E C T
T W O
THE KEYES ART MILE THE FUTURE OF URBAN LIVING