Skip to main content

December 2022 Component Manufacturing Advertiser Magazine

Page 144

A

Th e

Component Manufacturing dverti$ dverti $ er

Don’t Forget! You Saw it in the

Adverti$$er

December 2022 #14281 Page #144

The Last Word on Automated Material Handling Joe Kannapell, P.E.

W

ith automated saws and auto-jigging tables, what remains is automated material handling, and that’s what we find at Builders FirstSource’s (BFS) Austin plant. House of Design’s (HoD) robotic roof line there extends the floor truss pre-plating methodology found at their Atlanta plant (see The Last Word on the Promise of Robotics from August 2022) to the varied geometry of roof trusses. Beginning last April, Area Manager John Hansen and GM Jay Schroder worked with HoD technicians installing robotics on a new double-sided gantry line and they continue to improve uptime and output. These BFS initiatives continue their quest to gain a competitive advantage with automation, which is how they entered the truss business 30 years ago by buying leading-edge computerized saws and laser setups. The HoD roof system again borrows from Professor Tuomo Poutanen’s patent (see The Last Word on Pre-Plating from November 2022), though it is not yet integrated with a saw. Currently Austin’s cutting is processed through an ALS and is staged manually in the sequence directed by the HoD software. Special attention is required to properly orient the end-cuts of each piece “up or down” and “leading or trailing” to match the display at the infeed to the table. While the picking process adds manual labor, this extra cost is somewhat offset by the reduction in lumber waste from optimization at the ALS. From the cutting staging area, each part is manually fed into a trough-like track and is conveyed to a station at which the bottom side of chords and the top side of the webs are pre-plated hydraulically by a robot. Plates are located very accurately and fully embedded prior to assembly in the impressive four step process shown in the images. This increased accuracy enables a reduction in fabrication tolerance during truss design. Per ANSI/TPI 1–2014 Commentary, the “most commonly used fabrication tolerance has been 20 percent.” With HoD pre-plating, this tolerance may be reduced to 10%, effectively reducing plate sizes by 10% and decreasing truss cost accordingly. (Note that the fabrication tolerance still needs to account for the incidence of flattened or ineffective teeth due to lumber defects.)

Continued next page

PHONE: 800-289-5627

Read/Subscribe online at www.componentadvertiser.com

FAX: 800-524-4982


Turn static files into dynamic content formats.

Create a flipbook
December 2022 Component Manufacturing Advertiser Magazine by Component Manufacturing Advertiser - Issuu