
1 minute read
Prosperous Communities
Working together to protect and enhance our natural environment for the future.
Planned Projects 2021-22 Comments
Advertisement
Investigate options for improved innovative waste management Naracoorte Lucindale Council are working with the Limestone Coast Local Government Association Waste Steering Committee
Implementation of the Naracoorte Creek & Creek Walk Plan – includes a hydrological assessment and construction of a weir at the Park Terrace bridge, interpretive signage at 55 Ormerod Street and along the creek walk, resealing of the north parklands path from the cemetery to the swimming lake, heritage signage in the rail lands and permanent signage for the Parkrun. • Sealed path North Parklands • Interpretive Signage 55 Ormerod Street • Hydrological Assessment commenced (weir construction included in 21-22 budget). Additional flood monitoring has been undertaken for Landscape SA assessment
Completed
Ongoing
Yes Yes No
Fire Mitigation
Undertook a fuel reduction burn for the North Parklands Stage 1 and maintained fire breaks. Issued 105f Notices where required throughout the district. Gares Swamp Restoration Annual maintenance and pest plant removal undertaken Yes
Yes
Improved stormwater management for Foster Street, Naracoorte Installation of new stormwater system Yes
Priorities 2022-23
Naracoorte Creek Weir construction Naracoorte Creek Walk signage Frances Masterplan walking trail North Parklands fuel reduction burn Stage 2 Lucindale town entrance statements
