Skip to main content

Foresight 2026 - 7th Edition

Page 24

Central Ohio Revitalization: Creating New Workspaces Revitalization across Central Ohio has shifted from isolated projects to a coordinated, region-wide effort reshaping how residents live, work and commute. Public and private investments are redefining office location strategies by emphasizing walkability, safety and amenity-rich environments. While many of these projects do not directly add office space, they influence where office demand is most competitive.

Downtown Columbus: Developing Infrastructure as Economic Development Downtown Columbus is undergoing a transformation driven by large-scale infrastructure investment and public placemaking initiatives aimed at improving connectivity, safety and street-level activation. The Capital Line, a planned two-mile pedestrian loop connecting the Scioto Peninsula, Scioto Mile, Capitol Square, Gay Street and Columbus Commons, represents a significant step toward improving downtown walkability. Construction is expected to begin in mid-2026, with completion targeted for 2027. A central component of the project is the redesign of Gay Street into a pedestrian-oriented retail corridor, featuring curbless sidewalks, flexible public space and active storefronts. These improvements are intended to increase foot traffic, support small businesses, and enhance overall employee experience, addressing challenges that have constrained downtown office demand. Downtown’s redevelopment momentum is further reinforced by Ramp Up Columbus, a $1.4 billion reconstruction of the I-70/71 corridor through the urban core. The multiphase project will improve safety and traffic flow, reduce lane changes, eliminate free-flow ramps at downtown intersections and replace aging bridges with pedestrianfriendly structures that reconnect neighborhoods historically divided by highway infrastructure. Together, the Capital Line and Ramp Up Columbus signal a fundamental shift in how downtown is positioned as a more connected and livable neighborhood. Through adaptive reuse, property reinvestment and activation of street-level space, Downtown Columbus continues to strengthen its long-term competitiveness as an office location.


Turn static files into dynamic content formats.

Create a flipbook
Foresight 2026 - 7th Edition by Colliers | Columbus - Issuu