Chelsea Mordialloc Mentone News 24 February 2021

Page 4

Chelsea • Mordialloc • Mentone

NEWS DESK Picture: Gary Sissons

Proudly published by Mornington Peninsula News Group Pty. Ltd

PHONE: 03 5974 9000 Published weekly

Circulation: 16,880

Audit period: Oct 2013 - Mar 2014

Source: AMAA; CAB Total Distribution Audit for further information visit www.auditedmedia.org.au

Editor: Brodie Cowburn 0401 864 460 Journalists: Brodie Cowburn, Stephen Taylor 5974 9000 Photographers: Gary Sissons, Yanni Advertising Sales: Anton Hoffman 0411 119 379 Real Estate Account Manager: Jason Richardson 0421 190 318 Production and graphic design: Dannielle Espagne, Marcus Pettifer Group Editor: Keith Platt Publisher: Cameron McCullough REGULAR CONTRIBUTORS: Peter McCullough, Stuart McCullough, Andrew Hurst, Ben Triandafillou ADDRESS: Mornington Peninsula News Group PO Box 588 Hastings 3915 Email: team@baysidenews.com.au Web: baysidenews.com.au DEADLINE FOR NEXT ISSUE: 5PM ON MON 29 FEBRUARY 2021 NEXT ISSUE PUBLICATION: WEDNESDAY 3 MARCH 2021

An independent voice for the community

We are the only locally owned and operated community newspaper. We are dedicated to the belief that a strong community newspaper is essential to a strong community. We exist to serve residents, community groups and businesses and ask for their support in return.

PAGE 4

Chelsea Mordialloc Mentone News

24 February 2021

Solar farm adds to power mix MOTORISTS on EastLink may have seen Melbourne Water’s sign, pictured, advertising a proposed solar farm at the Eastern Treatment Plant, Bangholme. The farm is one of the many ways the authority says it is adapting its operations to “prepare for a changing climate, reducing our own carbon emissions and generating more renewable energy”. The Eastern Treatment Plant, opened in 1975, treats about 330 million litres of sewage a day – about

40 per cent of Melbourne’s total. It already makes biogas that provides about 30 per cent of the energy needed to run the plant each year; the proposed solar farm will produce a further 10 per cent. Solar, along with hydropower and bioelectricity, will take the plant a step closer towards halving its emissions by 2025 and, hopefully, reducing them to net zero by 2030. Works to prepare for the solar farm on Melbourne Water land south of Thompson Road and east of the

Mornington Peninsula Freeway began last year and a contract was awarded to Beon Energy Solutions. Construction is expected to begin in coming months. A potential second solar farm will be built at the Winneke Water Treatment Plant, Christmas Hills. Both solar farm projects are still in the design and planning stages, however the Eastern Treatment Plant farm has been approved and is further developed in its design.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.