HIGHLINE notes October 2025
Building the workforce of the future, right here at home, pg. 4 FAQ: Powering data, pg. 6
Scan for fun! Discover all the events CCEC is hosting, sponsoring, and joining in your community. October 2025 | Highline Notes 1 CassCountyElectric.com
editorial
Paul Matthys, president/CEO, Cass County Electric Cooperative physical goods. The output of an AI factory is intelligence, enabling businesses to develop AIpowered applications and gain a competitive advantage.” – Google AI Overview. AI factories use high-performance GPUs and powerful servers, which generate a lot of heat. North Dakota’s cold climate is suitable for large data centers, as it significantly reduces cooling costs. When conditions are right, they use economizers for “free cooling” by pulling in outside cooler air to reduce the need for mechanical refrigeration.
Since the announcement of Applied Digital’s AI factory on Aug. 18, I have been visiting and engaging with members who have questions and concerns about the cooperative serving a large, energy-consuming load.
Serving Applied Digital’s AI factory will not raise your electricity rates. We have the energy and capacity secured to serve this load. Additional resources might need to be built in the future, but Applied Digital will pay for them as needed. We can leverage this load and other large energy consumers to help pay for fixed costs, which will Data centers, specifically AI As you may already have heard, reduce the upward pressure that factories, have been the latest Cass County Electric plans to we are already facing on electric hot topic in the energy industry. serve a large AI factory being built rates. Until recently, I didn’t know and run by Applied Digital near exactly what an AI factory was or Harwood, North Dakota. Who is There are a few questions about why anyone would want to put Applied Digital? Applied Digital whether this AI factory will cause one on our system, let alone in (Nasdaq: APLD), named Best Data rolling blackouts or brownouts, North Dakota. So, I typed in “what Center in the Americas 2025 by and whether it is using up all the is an AI factory” in the Google Datacloud, is a next-generation grid capacity. The answer is no. search box and got this for an AI digital infrastructure company Applied Digital will have backup overview. that designs, develops, and generation for redundancy for the operates high-performance data entire facility. If there is a strain “An AI factory is a specialized centers and colocation solutions on the grid or a power shortage, computing infrastructure for artificial intelligence, cloud, they will be forced to transfer that handles the entire AI networking, and blockchain from utility power to their backup development lifecycle, from data industries. Founded in 2021 and generators. ingestion and model training headquartered in Dallas, Texas, to deployment and inference the company blends hyperscale Cass County Electric and our at scale. It integrates advanced development expertise with board of directors will continue hardware, such as GPUs and high- proprietary waterless cooling to ensure that we prioritize the speed networks, with software technology and sustainable needs of our members and and workflows to automate engineering practices to deliver provide affordable and reliable the creation of actionable AI secure, scalable computing electricity. We will continue to models and intelligent solutions capacity at unprecedented speed look for ways to grow, promote from raw data, similar to how and efficiency. economic growth, and give back a traditional factory produces to the communities we serve. 2 Highline Notes | October 2025
CassCountyElectric.com
l
this month’s content lineup
10 11 12 13 14 15 news
safety
save
recipes
impact
ads
BOARD MEETING HIGHLIGHTS - AUGUST The Cass County Electric Cooperative board of directors met Monday, Aug. 25, and discussed the following: • Moved to approve the August 2025 consent agenda of the regular board meeting, consisting of minutes, monthly department reports, director expense report, and the July Purchased Power Adjustment (PPA). • Received the Chairman’s Report. • President/CEO Paul Matthys gace the president’s report, providing updates from meetings and conferences attended. • Received the July 2025 financial report. • Received a report on the upcoming RUS loan. • Moved to approve the next RUS loan.
• Received a report on the Innovate28 initiative. • Received a report from Federated Insurance. • Received a report from the Operations and Administration Committee. • Received a report from the Rate, Audit, and Finance Committee. • Received a report from the Board Retreat. • Received a report from the Minnkota Power Cooperative board meeting. • Moved to approve the August 2025 capital credit estate payments. • Reviewed upcoming meetings and events. The next board meeting is scheduled for Tuesday, Oct. 28, 2025.
CCEC members in Districts 4, 5, 6, and AtLarge interested in becoming a director should contact our executive assistant at 701-356-4405 or srhea@kwh.com for a director election petition packet. Interested members must return all required paperwork to the cooperative by Jan. 14, 2026. Members will vote for new board members at the cooperative’s April 14, 2026, annual meeting.
Scan here for more info! Candidates interested in running for three-year terms for positions in Districts 4, 5, 6 and At-Large must be bona fide residents of the district in which they are seeking directorship. Below are the current directors of these districts. District 4: Stacey Ackerman (I) District 5: Tom Seymour (I) District 6: Terry Kraft (I) District At-Large: Glenn Mitzel (I) Scan the QR code to learn how to run for the board or to view the district map in more detail.
CassCountyElectric.com
Volume 83, Number 10
Communications: Morgan Bachelor Sara Hand Jocelyn Lura Hovland Printer: Forum Communications Printing Board of Directors: Paul White, Secretary Douglas Anderson Vanessa Kummer Stacey Ackerman Tom Seymour Glenn Mitzel, Board Chair Wendy Loucks Kalvin Hoff, Treasurer Terry Kraft, Vice Chair Executive Staff: Paul Matthys, President/CEO Jodi Bullinger, VP of Engineering & Operations Chad Brousseau, VP of Member & Energy Services Andy Weiss, VP of Corporate Services & CFO Mitchell Lyter, VP of Information Technology & CIO Highline Notes (USPS 244-740) is published monthly by Cass County Electric Cooperative Inc., 3312 42nd St. S., Suite 200, Fargo, ND 58104. Periodicals postage paid at Fargo, North Dakota 58104, and at additional mailing offices.
2026 Director Elections Cass County Electric Cooperative’s directors serve as liaisons between fellow members and the cooperative executive staff, providing guidance and oversight on cooperative finance and operations. Directors provide the vital service of voicing the membership’s needs and upholding the cooperative value of democratic member control.
Highline Notes
Postmaster: Send address changes to Highline Notes 3312 42nd St. S., Suite 200 Fargo, ND 58104 © Copyright Cass County Electric Cooperative 2025. All rights reserved. Questions: 701-356-4400 800-248-3292 info@kwh.com Call Before You Dig: 800-795-0555 or 811 Cass County Electric Cooperative is an equal opportunity provider and employer. Information about the cooperative, articles of incorporation, bylaws and more can be found at CassCountyElectric.com. October 2025 | Highline Notes 3
Building the workforce of the future, right here at home Powering possibilities: NDSCS Career Innovation Center opens in Fargo On a bright August morning, community leaders, educators, and industry partners gathered in south Fargo to cut a ribbon. In truth, they were opening doors. Doors to opportunity, innovation, and a stronger workforce for our region. The ribbon-cutting for the new Career Innovation Center (CIC) marked more than just the completion of a building. It marked the beginning of a new era in career and technical education, where high schoolers, college students, and lifelong learners alike will gain the hands-on skills North Dakota’s economy needs most. For Cass County Electric Cooperative (CCEC), the story is clear: This is about powering the next generation of workforce and ensuring opportunity stays rooted in our communities. From vision to reality The CIC has been in the making a long time. More than a decade ago, then-NDSCS president John
Richmond dreamed of a place where students of all ages—from first graders to adults seeking new skills—could come together to learn and imagine. That dream took root in a cornfield in 2021 when ground was broken on the south Fargo site. By August 2025, the dream stood tall as an 87,000-square-foot facility designed to serve 2,500 students annually. Nearly $35 million in funding, including $12 million in federal support, made the center possible. The project represents a true community effort, uniting NDSCS, Fargo, West Fargo, Northern Cass, and Central Cass schools, along with legislators, local governments, donors, and industry partners. “This is more than just a ceremonial act,” said NDSCS President Dr. Rockey Flanagan. “This is a promise to all of the students who will enter this building, that we will provide them the tools they need to be successful.” Building a workforce pipeline The CIC is not simply a school. It is
4 Highline Notes | October 2025
CassCountyElectric.com
a workforce pipeline, designed to meet the critical employment needs of North Dakota by connecting students directly with career opportunities. Students will explore fields such as: • Allied Health: nursing, EMS, pharmacy tech • Agriculture and Precision Technology • Construction and Building Trades: plumbing, HVAC, electrical, construction • Manufacturing: robotics, automation, machining, 3D printing • Business, Marketing, and Management • Computer Science: cybersecurity, AI • General Education: English, math, and science courses for dual credit Phase I includes classrooms and labs for nursing, pharmacy, agriculture, and business, along with flexible collaboration spaces. Future expansions will add advanced robotics, manufacturing, and
across Cass County, including those from smaller districts who may not otherwise have these opportunities. It also strengthens dual-credit pathways, allowing high school students to earn college credit in trades and technical programs while preparing for high-demand jobs. Why it matters to CCEC For CCEC, the opening of the CIC reflects more than a milestone in education. It represents the values we live every day: community, accountability, safety, innovation, and integrity.
engineering. The design emphasizes hands-on, experiential learning with lab work, technical training, job shadowing, and internships that prepare students for real-world careers. “These are great careers, and it’s an affordable education that’s right on target,” said U.S. Senator John Hoeven at the opening. Voices of educators While the ribbon cutting showcased community pride, the true excitement lies with the educators who will bring the building to life. They see firsthand how the CIC will change the classroom experience and open new doors for students. “The CIC is a shining example of the power of public and private partnerships,” said Dr. Cory Steiner, Fargo Public Schools Superintendent. “For more than a decade, conversations about what could be have now become reality. The CIC represents an incredible opportunity for our region—not only to address workforce needs, but also to give students the chance to pursue their passions. It will quickly become a hub for solving challenges in our community by investing in our greatest resource: our people.” Educators emphasize that the CIC provides access for students
Many of the careers taught at the CIC—electrical trades, engineers, IT—are the very fields CCEC depends on to deliver reliable, affordable power to our members. By investing in technical education, the region is also investing in the people who will keep our lights on, maintain critical infrastructure, and build the communities we call home. “At Cass County Electric, we know our future depends on a strong local workforce. Facilities like the CIC ensure tomorrow’s skilled professionals are trained right here at home,” said Chad Brousseau, VP of member and energy services at CCEC. Looking ahead The ribbon may already be cut, but the real work is just beginning. As students and educators settle into the space, the CIC will evolve, grow, and expand, shaping the workforce of tomorrow and offering new opportunities for generations to come. It is, as President Flanagan said, more than a building. It is a promise. A promise that young people in our communities will have the chance to learn, grow, and thrive in the very careers that keep North Dakota moving forward. For CCEC, it’s a reminder of what we believe: When we invest in people, we invest in the future. Together, we power possibility. CassCountyElectric.com
October 2025 | Highline Notes 5
FAQ: Powering data Cass County Electric Cooperative is committed to keeping members informed and addressing questions as new developments arise. A major data center project is planned within our service territory—bringing significant investment to both our community and our electric system. Applied Digital is building a data center near Harwood, North Dakota. Power for the facility will be provided by Minnkota Power Cooperative and Cass County Electric Cooperative. Applied Digital will also cover the cost of all necessary infrastructure improvements. To help members and the public better understand this development, we’ve compiled answers to frequently asked questions about the project’s purpose, operations, and community impact. What is Applied Digital? Applied Digital is a digital infrastructure company that designs, builds, and operates high-performance data centers and colocation solutions for artificial intelligence, cloud, networking, and blockchain industries. Founded in 2021 and headquartered in Dallas, Texas, the company combines largescale development expertise with proprietary waterless cooling systems and sustainable engineering practices. The result is secure, scalable computing capacity delivered with speed and efficiency. What is an AI factory and why is it coming to Harwood, North Dakota? An AI factory is a specialized data center that hosts specialized Graphic Processing Units (GPUs) and other computer equipment to support artificial intelligence. These facilities drive breakthroughs across many fields, including advancing healthcare and education to improving infrastructure and public safety. They power innovations that improve lives, boost the economy and support national security. North Dakota is an ideal location for a data center because it offers:
• Affordable, reliable power infrastructure • A supportive and growing business environment • Available land with low risk of natural disasters • A cold climate that naturally reduces cooling costs for equipment • A skilled workforce focused on technology How big will this data center be? The Harwood data center will feature two purpose-built facilities totaling more than 1.8 million square feet. The new site will represent one of the region’s most influential digital infrastructure initiatives to date, with investments projected to exceed $3 billion from Applied Digital plus additional significant investment from Applied Digital’s customer(s). Will the data center stress the power grid or affect reliability? Minnkota and Cass County Electric Cooperative have planned carefully for growth in the Fargo area. The necessary energy capacity and infrastructure are in place to integrate the data center while maintaining a strong, stable and resilient grid. Data centers help maximize the use of existing electric infrastructure that might
6 Highline Notes | October 2025
CassCountyElectric.com
otherwise be underused during certain times. This improves system efficiency and benefits all cooperative members. Will this data center increase retail electric bills? No. In fact, large electricity users can help keep costs more stable for everyone. Electric utilities must maintain and operate essential infrastructure – transmission lines, substations, and other equipment – whether electricity demand is high or low. These are fixed costs that are incurred from month to month. When a large consumer like a data center joins the system, they contribute significantly to those fixed costs through the rates they pay. This spreads those expenses over more users, which can help offset other rising costs that put upward pressure on rates. In other words, instead of increasing costs for members, large electricity users can actually help relieve some of that pressure. Is the data center paying for the infrastructure it needs? Yes. Like other large electricity consumers, the data center pays for the infrastructure it uses. Will this facility divert resources away from residential or small business consumers? No. Minnkota and Cass County
Electric Cooperative have served this region on a not-for-profit basis for more than 85 years and remain committed to reliable, safe and affordable electricity for all member-consumers. Careful planning ensures new large loads don’t compromise service or investments elsewhere. In fact, data centers can help fund future infrastructure improvements that benefit everyone. How long will construction take and what impacts can we expect? The data center is expected to begin construction in September 2025 and be partially operational by the end of 2026 and fully operational in early 2027. Work is coordinated with local governments to minimize disruption, with a priority on hiring local contractors and labor. Will the facility be noisy? How is the noise being controlled? The project includes sound barriers and strategic setbacks to keep noise low. Computer equipment is housed inside precast concrete, sealed buildings, heat exchangers emit minimal noise, and backup generators are used only in emergencies or under maintenance at controlled times and are strictly regulated.
center use? Is this a concern? Applied Digital uses an innovative, closed-loop water system that eliminates the need for water consumption for cooling the equipment. This system ensures the data center operates sustainably without putting pressure on local water resources. Water consumed at the facility is expected to be less than one single family home per building and is used for bathrooms, kitchens, hand washing and some equipment cleaning. What benefits will this project bring to our members and community? Economic impact: Hundreds of construction jobs and dozens of long-term technical positions. Local businesses will also benefit from increased activity in the region. Tax base growth: Data centers are major contributors to local and state tax revenues, helping to fund schools, infrastructure, and services. Grid strength: A steady, predictable load like this helps utilities plan more effectively, improving system efficiency and reliability. Innovation: Projects like these position North Dakota as a hub for technology and energy innovation.
How much water will the data
Questions? We know this project may raise questions, and we are committed to transparency every step of the way. If you’d like more details or have specific concerns, please reach out to our team at 701-356-4400 or info@kwh.com. You can also find updates at casscountyelectric.com/data-center.
Scan for more info
CassCountyElectric.com
Know the difference: Data Center: • A facility full of servers and networking equipment that stores, processes, and manages digital information. • The “backbone of the internet” — supporting things like cloud storage, online banking, healthcare systems, streaming services, and business operations. • Their main focus is reliability and security so that services are available 24/7. • Uses a steady, predictable load of electricity. Utilities can plan for this, which often strengthens grid reliability. Cryptocurrency Mining Operation: • A mining facility runs powerful computers specifically designed to solve complex mathematical problems. • These problems validate cryptocurrency transactions (like Bitcoin), and the miners earn digital coins as a reward. • Unlike data centers, mining facilities don’t provide broader public services — their purpose is primarily profit-driven currency generation. • Extremely high and less predictable power use, with sudden surges. This can stress the grid and affect electricity availability and costs for others.
October 2025 | Highline Notes 7
Co-ops navigate shifts in federal energy policy Electric cooperative advocacy delivers results in fast-changing legislative environment In a legislative environment where many energy incentives were rolled back or eliminated, Cass County Electric Cooperative (CCEC) and cooperatives across the nation stood strong and saw results. Thanks to consistent and collective advocacy, the One Big Beautiful Bill Act (OBBBA), signed into law on July 4, preserved key provisions that ensure coops remain on equal footing with investor-owned utilities in the nation’s evolving energy landscape.
To qualify for the credits, projects must now be placed in service by Dec. 31, 2027 or begin construction within 12 months of the bill’s passage.
Among the notable victories, electric cooperatives successfully retained access to elective-pay energy tax credits and the ability to transfer those credits – two vital provisions that level the playing field between not-for-profit coops and investor-owned utilities. These tools, first introduced in recent years, allow co-ops to benefit directly from federal energy incentives without needing a tax liability, making it possible to pursue projects that were previously out of reach.
The legislation also imposes stricter domestic content requirements and penalties for using materials linked to foreign entities of concern, which creates some complexity in project planning and supply chains.
While the bill did accelerate the phaseout of wind and solar tax credits and eliminated federal incentives for electric vehicles, cooperative advocacy helped preserve core opportunities and helped avoid major challenges.
Maintaining carbon capture as an option Where OBBBA reduces support for renewables, it expands some incentives for carbon capture, utilization and storage (CCUS). Minnkota, CCEC’s wholesale power provider, is a national leader in CCUS through Project Tundra, which proposes to retrofit the coal-based Milton R. Young Station with carbon capture technology.
Wind and solar tax credit phaseout One of the most impactful changes under the new law is the accelerated phaseout of tax credits for wind and solar projects.
Just days after the bill’s signing, the White House issued an executive order directing the Treasury Department to tighten the definition of “start of construction,” signaling that only projects with a substantial portion already built may qualify for credits.
While wind and solar face compressed timelines and stricter conditions, other energy technologies fared better. Battery storage, geothermal and nuclear projects retain full tax credit eligibility into the 2030s.
Under the updated 45Q tax
88 Highline Highline Notes Notes || October October 2025 2025
CassCountyElectric.com CassCountyElectric.com
credit, the law now offers equal incentives for both enhanced oil recovery (EOR) and geologic sequestration. This bolsters financial support options for CCUS, which can help ensure reliable baseload power plants can operate in a carbon-managed future. EV incentives eliminated One of the most visible changes for consumers under OBBBA is the elimination of federal electric vehicle (EV) tax credits. The move marks a significant policy shift away from government-supported EV adoption and places more emphasis on market-driven growth. Industry analysts expect the change to slow the pace of EV adoption, particularly among firsttime buyers and in regions where upfront cost remains a primary barrier. Looking ahead Federal energy policy continues to swing dramatically with each administration, creating challenges for utilities planning infrastructure and investments with 30- to 50-year horizons. CCEC emphasizes that stable, bipartisan energy policy is essential to providing the certainty needed for long-term resource planning. Through continued advocacy work, electric cooperatives are engaging with federal leaders to ensure their priorities are reflected in all future decisions.
WATCH THE WIRES. The idea seems easy enough. But when you’re rushing to plant or get the harvest out of the ground, you might forget about those power lines on the field’s edge. Take a moment to talk to your team about how to avoid equipment contact with power lines and poles – and what to do if contact occurs. The reminder could save a life. Learn more and request a free safety kit from CCEC at WatchTheWires.com. Watch the Wires is a safety campaign developed by Minnkota Power Cooperative and its member cooperatives in eastern North Dakota and northwestern Minnesota.
- Statement of Ownership, Highline Notes -
CassCountyElectric.com
October 2025 | Highline Notes 9
THE CCEC APP: POWER IN YOUR POCKET Download the Cass County Electric app to: Go paperless and cut the clutter
Manage your account anytime, anywhere Report outages or delivery issues in seconds
Switch to paperless billing to be entered for a chance to win $500!
news
Howdy, neighbor! Your electric co-op is local and run by people in your community. Did you know that the people who keep Cass County Electric Cooperative (CCEC) running, including its employees and board of directors, are folks from your area? In fact, some of them may be your friends and neighbors! That’s something that makes electric cooperatives different from investorowned utilities (IOUs), whose bosses and board members are often hours away in big cities.
voice the needs of your district. That’s not possible with a board for an IOU, which speaks for shareholders instead of the electric consumers in their community.
Your co-op is homegrown! CCEC is headquartered in Fargo, and most of the people working here live in town or the surrounding communities. They care about keeping service reliable and affordable for members, because they’re members, too.
However you prefer to be involved with your cooperative, remember – your co-op is run with democratic member control, and your voice (and the voices of your friends and neighbors) is important!
The same can be said of our board of directors, whose members live in the different districts of our service territory. Each director is elected by fellow members who live in their district, so chances are high that you personally know your board representation! All big decisions made by the staff of the co-op also go through the board of directors, who are there to
10 Highline Notes | October 2025 CassCountyElectric.com
In fact, board directors are elected every three years in each co-op district, so if you want to be a part of guiding your local co-op, you could run for a seat – if you meet the eligibility criteria, that is.
Recognize anyone on this list? They’re the neighbors on your board of directors! District 1: Paul White, Secretary District 2: Douglas Anderson District 3: Vanessa Kummer District 4: Stacey Ackerman District 5: Tom Seymour District 6: Terry Kraft, Vice Chair District 7: Wendy Loucks District 8: Kalvin Hoff, Treasurer District At-large: Glenn Mitzel, Board Chair
safety Sharing the road this fall
As combines, tractors and grain trucks hit the road this fall, North Dakota drivers will once again be sharing highways and rural roads with large farm machinery. Harvest is one of the busiest times of year in the Midwest, and it brings added risks for both farmers and motorists. Agriculture is one of the nation’s most hazardous industries. The U.S. Bureau of Labor Statistics reported 453 agriculture-related deaths in 2021, equal to 9.5 fatalities per 100,000 workers. Transportation incidents, including tractor overturns, were the leading cause of death. By working together and using caution, we can help make this season safer for everyone.
Safety reminders for equipment operators
• Check that all lights and flashers are working properly before heading out. • Stay to the right side of the road on curves when safe to do so.
Scan here for more safety tips!
• Pull over occasionally to let traffic pass if vehicles are stacking up behind you. • Use extra care at railroad crossings. • Limit travel during high-traffic times when possible. • Know the height and width of your machinery, and watch for overhead power lines, narrow bridges and other obstacles. • Get enough rest and avoid driving when you are overly tired. • Keep a stocked first-aid kit on hand.
Safety reminders for drivers
• Give yourself extra travel time when driving on rural routes during harvest. • Allow plenty of space when following farm equipment. If the road is too narrow, wait in a driveway or approach until it is safe to pass. • Only pass in designated passing zones with clear visibility, and always watch for oncoming traffic.
CassCountyElectric.com
• Slow down. Farm machinery moves at much lower speeds and can turn suddenly into fields or farmyards. • Do not expect operators to move over in tight areas; it may not be possible. • Avoid tailgating, as operators may not see you behind their equipment. • Never cut back in front of farm machinery or trucks loaded with grain. They need more distance to stop. • Give equipment space to make wide turns. • Taking a few extra precautions this fall can help protect lives and keep the season safe and productive. For more tips on electrical and farm safety, visit CassCountyElectric.com.
October 2025 | Highline Notes 11
save
Prepare your heating system for demand response season
It may only be October, but the cold months of winter are sneaking up faster than any of us would like. To make sure you’re not caught off guard, you’ll want to confirm your home heating system is online and working properly. And if you’re a volunteer member of Cass County Electric’s (CCEC) demand response program (often called off-peak), we have some pre-winter projections and advice to ensure you’re set for the season. According to outlooks from the National Oceanic and Atmospheric Administration (NOAA), both North Dakota and Minnesota expect to see a fairly normal winter, with near-average snowfall and temperatures. However, as lifelong Midwesterners know,
the only thing predictable about our weather is its unpredictability, so CCEC will be preparing for 200 hours of estimated demand response through the winter. For perspective, 127 hours of demand response were deployed last winter. When electricity demand spikes, such as during extended cold spells when many homes rely on electric heat, our power provider, Minnkota Power Cooperative, activates the demand response program across the region. During these times, enrolled homes are automatically switched from electric heat to an alternative backup heat source, such as fuel oil, propane or natural gas. This switch helps reduce stress
on the power grid and avoids costly electricity purchases from the market, ultimately helping keep rates low for all members. Plus, program volunteers receive a nearly 50% reduction in their electric heating rate. Minnkota will be conducting a demand response test in early to mid-December, so now is the ideal time to make sure everything is in order. If you have any concerns, reach out to your co-op before winter weather arrives in full force! If you want to learn more about CCEC’s demand response options, give us a call at 701-356-4400 or visit CassCountyElectric.com/ energy-management.
Check your backup heat If you’re part of the demand response program, it’s critical to check your backup heating system now. This includes: • Ensuring fuel tanks (propane, fuel oil, etc.) are filled • Verifying that the backup system is working properly
12 Highline Notes | October 2025 CassCountyElectric.com
Check out our Pinterest page for more recipes!
recipes This October, treat your crew to festive flavors with popcorn balls, Oreo-marshmallow bars, and a bubbling witches’ brew topped with icy “hands.” Fun, spooky, and perfect for sharing!
Popcorn Balls
Witches’ Brew
Ingredients: 5 Tablespoons unsalted butter 4 cups marshmallows 1/2 teaspoon vanilla extract 16 cups unflavored popped popcorn M&Ms, candy corn, salted pretzels, or other candy, optional Preparation: In a large saucepan, melt butter. Add marshmallows and stir constantly until marshmallows have melted. Remove from heat and stir in vanilla. Add popcorn and fold into the marshmallow mixture. If you’re adding candy, now is the time to mix it in. When the mixture is cool enough to handle, lightly spray your hands with nonstick cooking spray. Scoop about 1 cup of the popcorn mixture and smoosh it into a ball. Place them on a sheet of waxed paper to cool. Grandma used to put these into resealable bags for us to take home when we stopped by trick or treating.
Ingredients: 1 package (6 ounces) cherry Jello 1 ¼ cup sugar 3 ½ cups boiling water 12-ounce frozen lemonade, thawed 46-ounce can pineapple juice 6 cups cold water 1 quart ginger ale Preparation: Dissolve Jello, sugar in boiling water. Add lemonade, pineapple juice, and cold water. Freeze in a two-gallon ice cream container for at least 3 hours. Break up and place into a large punch bowl. Just before serving, slowly pour in the chilled ginger ale. This will create a refreshing, bubbly punch. Stir the mixture gently to combine the ingredients while preserving the carbonation. Serve. Ladle the punch into glasses and enjoy immediately.
Mallow Treats
Spooky Hands Ice Cubes
Ingredients: 3 Tablespoons butter 1 pkg. (10 oz.) marshmallows 30 Double Stuf Oreo cookies, crushed Preparation: Microwave butter in a large microwaveable bowl for 45 seconds. Add marshmallows; toss to coat evenly. Microwave for 45 seconds, stir, and microwave for an additional 45 seconds. Stir in cookie crumbs. Press onto the bottom of a 9-inch square pan sprayed with cooking spray. Cool completely before cutting into bars.
Ingredients: Food-safe gloves Rubber bands Water Preparation: Fill your food-safe gloves with water and tie them off with a rubber band. Lay them flat in the freezer overnight. Remove the gloves from the freezer. Remove the rubber bands and use scissors to remove the gloves from the ice. Drop the ice cubes in the punch bowl and serve.
CassCountyElectric.com
October 2025 | Highline Notes 13
impact Operation Round Up Cass County Electric Cooperative Foundation
Members are helping members. For less than $1 per month, you can make a difference in your community. Participation is simple: Your monthly electric bill is rounded up to the nearest dollar, an estimated average of $6 per year. You can see your current contribution on your electric bill. A volunteer board meets quarterly to distribute the funds used primarily within Cass County Electric Cooperative’s service area for charitable, educational, environmental, and emergency assistance purposes. The funds are never used for political purposes or utility bills.
September 2025
Applications reviewed Organization 19 Individual 2 Emergency 0 Applications approved Organization 18 Individual 2 Emergency 0 Applications denied 0 Applications tabled 1
$59,570 $2,500
2025 year-to-date summary Per member average contribution $3.72 Average member participation 75.6% Total income $169,018.44 (Includes contributions, interest earned, and donations/memorials.)
Total contributions (1993-present)
Featured recipient: Heroes Compass Heroes Compass started with a simple idea — create a space where those who serve our communities can feel supported and connected. Based in Horace, North Dakota, the nonprofit brings veterans, first responders, police, and firefighters together through wellness events, resources, and volunteer opportunities. It’s about more than programs, it’s about building friendships, finding purpose, and reminding our heroes that they’re never alone. 14 Highline Notes | October 2025 CassCountyElectric.com
$4,604,957
ads Member Market
All ads must be 40 words or fewer and will be abbreviated following our guidelines. No real estate or commercial ads will be accepted. Ads are published for members at no charge as space permits on a first-received, first-printed basis. Ads are due by the 10th of the month prior to publication. Members may submit only one ad per issue. Editor reserves the right to edit or reject any ad. Email ads to: ccec@kwh.com.
For sale 2001 Chevrolet 1/2-ton extended cab 4wd Silverado. Z71 package, receiver hitch, box liner, clean interior, 186,000 mi, body rust but runs & drives well, pics avail., $3,950. 701-799-1735 B3200 Kubota tractor w/ 72” midmount mower. 495 hours on tractor, 3 range hydro. trans., front wheel assist, rops, $15,000. 701-840-0571 Handheld tachometer, new, 200-1800 rpm. $40. 701-412-3562 74” Bobcat rock bucket $2,500. 4-wheel Massey Harris w/ hoist running gear, $500. IH Swather 24’ Model 75, $500. ‘58 Ford grain truck, $300. 701-678-2908 2000 Mercury Mountaineer, 4x4, 173,000 mi., runs good, $1,500/OBO. 701-403-0704 New Adult Sun Tricycle (Violet Pearl) Mod: Traditional24, 1 speed, hi-tensile steel frame, 14G stainless steel spokes, 250 lb., rider & cargo combo weight limit. Retail (Scheels): $800. Selling for: $600. Text 701-729-7070 8x10’ contractor’s trailer w/ dual axle, rear walk-in door, bins built in, $2,000. Rain Bird misc. sprinkler parts. Water suction pumps w/ hoses 2” in diameter, $200/ea. New Ariens shield for walk-behind snowblower, $175. 701793-4642 or 701-371-3474 Four-hole portable fish house. Jiffy ice auger. Tool Shop drill press. FourBridgestone Tires 245/60R-18. Telestop ladder. LnL+G air conditioner w/ vent & remote. Older Tonka toys. Baby crib. 701-566-7165 Hewitt electric lift 18-19’ boat, was in the water 2 summers, Carlson’s north
of Alexandria, MN, $1,000. Rod & reels, Fargo, ND. 701-781-7625 NIB Federal 12 Gauge 3” & 3 1/2” shells. Multiple boxes of 2-shot, BB, BBB, & T shot, all stored in an environmentally controlled room, $15/box. 701-269-7369 Dog kennel, 14’ x 4’ x 6’ high, w/ lid & 3’ gate, galvanized chain link (Dakota Fence), $500 cash. Call b4 8 p.m. 701446-6670 2017 Forest River Destination Camper, 38’, 2 slide outs, beautiful cond., fullsize refrigerator, full-size bath, king bed, two recliner couch, table, chairs, central vacuum, electric awning, located at Lake Ashtabula, can be moved, $24,900/OBO offer. 701-7402382 1962 Case 730 gas tractor, adj. wide front axle, power steering, dual range, 2 hydraulic remotes, Eagle hitch, good tires, runs great, $3,250. One pair of 12.4-36 tractor tires, $250. 701-2007606 Toolboxes & full set of hand tools. MAC, Snap-on, Matco, Milwaukee, DeWalt, John Deere. AC gauges & leak detector, electrical diagnostic & repair, air & cordless ratchets, wrenches & drills, 2 large tap & die sets, 3/4” socket set. Many more items. 701-361-6873 Solar panels, liquid 3’ x 8’ x4” thick, great for heating garage, shop, heated slab floor, etc. 9 units available. $195/ ea, or $1,000 for all nine units. 701-2388382 2008 Chevy Duramax ¾ ton 4 dr. pickup. 170,000 mi. newer injectors & glow plugs, $14K. Older Sears band saw, $100. Older Sears drill press, $100. 701-318-2446 CassCountyElectric.com
2021 Ford Transit Van Class Pleasureway Ontour-2.0 Motorhome. Like new, no smoke, no pets, showroom cond., Freedom Warranty, 200 watts solar, 2.8 Onan generator, great MPG, must see, see video at Pleasure-way.com, ONTOUR 2.0 41-K miles, $87,500/OBO. 701-367-0115 Hard tonneau pick-up box cover, for covering truck bed, the brand is Osobak, made of FRP panels, 84 x 67, never used, $500. 612-296-0879 1993 Westwood Campbell Soup Company Occupation Soup Mugs, set of four, $40. 701-388-1107 Small square bales of grass hay, wheat straw, & soybean straw, good quality, stored inside. 701-238-2933 1977 Oldsmobile Cutlass Supreme, 2-door Coupe, 350 engine, AC, good tires, red interior, white exterior, 102,918 actual mileage, garaged and maintained, running cond., some rust on rear quarter panels, have pics. 701373-2369 2017 Polaris Ranger 750, red, w/ detachable plow, less than 500 actual miles, $8,500. 701-715-0329 Large collection of Coca-Cola memorabilia & some Dale Earnhardt collectables. 701-282-5542 Trek 7250 hybrid bike, black, 22.5 inches, $250 OBO. Vintage Sango Japan Platina fine China set of 12, $300 OBO. Multiple tools in toolbox, wrenches, etc, free. 701-793-1065 Wanted Small used pull-behind car trailer, approx. 5’ x 7’. 701-730-4425
October 2025 | Highline Notes 15
800-248-3292 | CassCountyElectric.com 4100 32nd Ave. S., Fargo, ND 58104
Scan here to unsubscribe
2025 MEMBER MEETING Wednesday, October 15 Hilton Garden Inn 4351 17th Ave S., Fargo 5:00 Registration | 5:30 Meal & Meeting Special Guest Speaker: Tony Clark, National Association of Regulatory Commissioners The National Energy Perspective 16 Highline Notes | October 2025 CassCountyElectric.com