APPENDIX B - DESIGN REVIEW SUBMITTAL CHECK LIST

APPENDIX B - DESIGN REVIEW SUBMITTAL CHECK LIST

1. PRE-DESIGN CONFERENCE (Must occur prior to commencement of design)

REVIEW ITEM - IN COMPLIANCE Y/N & DATE COMMENTS Confirm conditions depicted in the Lot Features Map Has reviewed Design Guidelines, Recordation Plat, CC&Rs and Summit County codes and ordinances Ask and answer questions related to the design and approval of residenc- es at Wohali

2. PRELIMINARY DESIGN SUBMITTAL Provided site plan with surveyed topography Provided preliminary floor plans Provided preliminary exterior elevations and building colors

Provided preliminary grading plan Provided preliminary landscape plan Provided preliminary lighting plan Provided any supplemental drawings, materials and studies requested during the Pre-Design Conference Paid review fee and filled out application

3. FINAL DESIGN SUBMITTAL Provided final site plan Provided final floor plans Provided roof plan Provided final exterior elevations Provided exterior materials sample board Provided final landscape plan Provided revegetation plan Provided final lighting plan Provided construction site plan Provided complete set of construction documents Provided structural certifications Provided construction time schedule Paid and signed Performance Deposit

4. OBTAIN COUNTY BUILDING PERMIT Upon DRB Final Approval, a letter will be provided to applicant to be submitted with the Building Permit Application

5. CONSTRUCTION COMMENCEMENT Within 12 months of final DRB approval

6. CERTIFICATE OF FINAL CONSTRUCTION APPROVAL Issued by the DRB upon completion of construction and all required inspections