11.21 Wall build-up – Finishing coat: lime – Undercoat: earth – Straw bales – Earth render, three layers
Wall build-up – Finishing coat: lime – Straw bales – Undercoat: earth – Earth render, three layers
Wall build-up – Finishing coat: lime – Undercoat: earth – Straw bales between timber posts – Earth render, three layers
Base protection – Used tyres, lean concrete
Base protection – Base plate with fine gravel filling
Base protection – Bubble wrap
Rebate to floor slab: approx. 4/10 cm
Floor build-up – OSB board – Vapour barrier – Two layers of pallets with insulation filling – Moisture barrier
11.22
Floor build-up – OSB board – Levelling course – Vapour barrier – Straw bales – Pallets – Moisture barrier
11.23 Wall build-up – Ventilated weatherboarding – Bituminous fibreboard – Straw bales between double posts – OSB board – Plasterboard
11.24
Wall build-up – Lime render – Soft fibreboard – Vertical straw bales between composite timber H-sections – OSB board – Installation void – Plasterboard
Base protection – Plaster base – Waterproof cement render
Floor build-up – Flooring – OSB board – Vapour barrier – Insulation, substructure – Moisture barrier – Floor slab
11.25
Floor build-up – Flooring – Screed – Sliding and separating course with vapour barrier – Crushed foam glass