Skip to main content

Straw Bale Construction Manual

Page 19

Kindlehill Highschool Wentworth Falls, NSW, Australia

Design: Sunlab Architecture with six b design, Simon Hearn and Jamie Brennan Engineer: Ian Hayes Wall system: Timber post-and-beam structure with straw bale infill Completion: 2010 Floor area: approx. 450 m²

1 Clean fill with plantings and landscaping, shown hatched.

New external pathways.Indicative 50' location only. Refer to Landscape Plan

Formblock retaining walls with integrated planter boxes

8000

5063

The form of this Rudolf Steiner school in the Blue Mountains was derived from the nautilus shell and the building has the shape of an unfolding spiral. Sustainability was a priority and components such as doors and windows were reused from other sites; pine trees that had been cleared from the school grounds were used for the main timber frame structure, which was filled with straw bales. The earth for render and cob for the walls was drawn from an excavation site at the nearby grammar school. A conscious decision was made to use non-toxic and sustainable products only. Traditional timber framing of mortise and tenon joints was used along with straw bales and cob for the walls. This provided increased insulation against the cold as well as effective acoustics. Many volunteers visiting from other countries, found through a help exchange network, brought their hands-on enthusiasm to the building project, as did volunteers from the school and local community.

+ 54.25

J

+ 52.45

+ 53.30

4307

g min ll 5 de faVERANDAH RL 55..00 s) (varie

H

27

RL 55.00

+ 52.30

min

1923

Fuel heater

2600 loft(optional well stairs)

9953 over Juliette loft ows wind RL 55.15 balcony over

00 39KINDY

2651

- EXISTING SCHOOL BUILDING -

ttre

985

ma

skylight

1053

Stores

WC 1

1348

WC 2 F

ROOF C

D

Stormwater provisions, including ground level drainage swales, to detail 21260

Built examples in detail

sink

Craft

1473

2

G

48 81 MULTI-PURPOSE ROOM Stabilised earth

Craft

Existing established vegetation to remain, unless noted

Fuel heater

ss

ROOF

70 0

Stabilised earth

33 84

1510

fall (pitch varies)

wind ows over

Steel frame roof cap with metal cladding or render, integrate with earth roof adjacent

46 56

ng @ Pitchi

deg. fall 9

fa no ll 18 m. d eg

deg

5 14

B

fall 5

3707

Quiet 10

ng @ Pitchi

2650

+ 51.30

Colorbond Custom Orb roof cladding throughout, unless noted. 5 degree minimum pitch.

148

VESTIBULE 06

Bench

New external steps and landscaping by others

+ 55.00

1781

+ 51.75

ng Pitchi

10 @ 21

I

A

DARY

Ferro cement/ stabilised earth formed roof

Rainwater tank located under verandah

Water tank located under deck. Connect to downpipes as specified. Overflows to on-site provisions, to Sydney Catchment Authority requirements

SITE BOUN

fall (pitch

varies)

E

Gutterless roofing to lower floor roofs. Note; Vary pitch as directed on site to acheive hyperbolic roof forms 6425


Turn static files into dynamic content formats.

Create a flipbook
Straw Bale Construction Manual by Deutscher Kunstverlag - Issuu