ABA
Arizona Builders Alliance member projects The Arizona Builders Alliance is a partnership between Arizona chapters of the Associated Builders & Contractors (ABC) and the Associated General Contractors (AGC). It represents more than 300 contractors, suppliers and professional service firms in the commercial construction industry. Here are spotlight projects submitted by ABA's members. 7TH STREET MIXED-USE DEVELOPMENT DEVELOPER: The Opus Group General Contractor: Sundt Construction Architect: Opus AE Group Location: 110 E. University Dr., Tempe Size: 806,081 SF Brokerage Firm: Cushman & Wakefield Value: $116M Start/Complete: December 2016 to July 2018 Subcontractors: Aero Automatic; E&K
Companies; Encore Steel; Kovach Building Enclosures; Mirage Plastering; Southland Mechanical; Walters & Wolf; Wilson Electric
ARIZONA STATE UNIVERSITY STUDENT PAVILION Developer: Arizona Board of Regents; Arizona State University General Contractor: JE Dunn Construction Architect: Weddle Gilmore Black Rock Studio; HGA Architects & Engineers Location: 400 E. Orange St., Tempe Size: 74,653 SF Value: $39.9M Start/Complete: March 2016 to August 2017
Subcontractors: Bell Steel; E&K Companies; Kovach Building Enclosures; Rosendin Electric; TDIndustries
BANNER UNIVERSITY MEDICAL CENTER TUCSON (BUMCT) - NORTH CAMPUS OUTPATIENT CENTER Developer: Banner Health General Contractor: Hensel Phelps Architect: SmithGroupJJR Location: 3838 N. Campbell Ave., Tucson Size: 207,000 SF Value: $64M
Start/Complete: August 2016 to early 2018 Subcontractors: Bel-Aire Mechanical; Charles Court; Coreslab Structures; Delta Diversified; Desert View Painting; DH Pace; Diversified Interiors; El Dorado Metals; Flooring Systems of AZ; Gale Insulation; Glass Unlimited; Harris Rebar; JB Steel; Kazal Fire Protection; Kovach Building Enclosures; Magnum Paving; Partitions
88 | July-August 2017
The mixed-use development will feature a 20-story and 12-story tower with 407 market-rate apartments built on a five-level podium. The project will also include approximately 30,000 SF of retail and restaurant space on the ground floor.
As a leader in Climate Net Neutrality and sustainable building, ASU’s goal for the Student Pavilion is to be a Net Zero Energy building, making it the first facility on any ASU campus to solely operate on energy produced on-site.
& Accessories; Progressive Roofing; Schindler Elevator; Stone Finish; Sun Valley Masonry; Sunland Asphalt; TP Acoustics; Universal Wallboard; Western Millwork The expansion consists of a multispecialty health center to house outpatient specialty clinics. The project will also include a 3-story, 962-stall parking garage.