News
Fibre reinforced screed speeds renovation contracts Suitable for overlaying existing surfaces such as tiles or flooring grade mastic asphalt, TREMCO SX100 Renovation Screed has been developed specifically to speed the installation of new floorcoverings, including carpets, vinyl and timber systems in refurbishment applications.
S
upplied in 25kg plastic lined sacks, the grey powder incorporates special fibres to reinforce the screed and provide excellent crack resistance. Meanwhile, the fast application, self-levelling characteristics help minimise downtime, while the option to apply by pump means areas of up to 2,000m2 can be laid during a single day. SX100 should be used in conjunction with a DPM while tremco illbruck Technical Services can be contacted to carry out a moisture test to ensure the RH of the substrate is below 75%. Steel and metal decks should be prepared and primed with TREMCO CS100 Epoxy Primer for Non-porous surfaces, while concrete or sand/ cement screeds require priming with TREMCO CS150 Acrylic Primer.
SX100 offers an open time of 30 minutes and provides an average coverage of 4 m2 per mix at a thickness of 4mm. It can be walked on in two to four hours and achieves a 28 day compressive strength of 30 N/mm2. Installation of final floor finishes can take place as soon as the relative humidity falls below 75%. SX100 is available through the manufacturer’s network of local and national stockists or direct from tremco illbruck. For further information, please call 01942 251400 or visit www.tremco-illbruck.com.
The Lampsafe Service For a safe, professional and fully auditable Lamp Recycling solution
F
or a visibly professional solution in terms of storage and recycling of fluorescent tubes look no further than the Lampsafe Service from Mercury Recycling. Fabricated from lightweight Correx and with aluminium reinforcements the containers are of a sturdy construction and have carrying handles to ensure ease of movement across or from sites. Velcro fastenings are used to secure the lid. Mercury Recycling offer a mainland UK wide coverage from our Head Office in Manchester and can offer next day delivery for the more urgent requirements if necessary. We operate a PPC permitted treatment facility in Trafford Park where fluorescent tubes, lamps, batteries and WEEE are sorted and treated. We provide a complete audit trail for all your electrical and mercury bearing hazardous wastes. Electronic copies of collection and www.twitter.com/BFM_Magazine
treatment paperwork are subsequently provided to ensure both you and your clients have a proficient recycling service from start to finish backed up with the relevant documentation. Alternative size containers for larger sites are available along with units for
the safe storage and transportation of odd shaped lamps/bulbs, Batteries and WEEE; please give Graham or Alex a call on 0161 888 1562 for helpful advice or perhaps view via our website www.mercuryrecycling.co.uk News
5