Redmond CentRal ConneCtoR masteR Plan | the desIgn evolutIon
oPen sPaCe 2025 highlights The elimination of surface parking and redevelopment of the adjacent “triangle site� and new buildings to the north of Cleveland Street further reinforces the unique qualities of the open space block.
6 5
cLeveLand st.
3 4 1
2 sound tRansit Light RaiL
h av
t 166
e ne
h av
e ne
t 164
2025
ne 76th st.
e ne
e ne
h av
h av
t 166
t 164
2012
cLeveLand st.
72
2
4
1 ne 76th st.
3