WATERFRONT SEATTLE

SCHEMATIC DESIGN POOL BARGE JANUARY 2014



WATERFRONT SEATTLE

SCHEMATIC DESIGN POOL BARGE JANUARY 2014

Prepared for: Central Waterfront Committee, The Seattle Department of Transportation, Department of Planning and Development, and Department of Parks and Recreation

Prepared by: Berger Partnership James Corner Field Operations CH2MHill, Shiels Obletz Johnsen, Inc. Schemata Workshop, Dark Light Design, EnviroIssues, Parsons Brinkerhoff, Elliott Bay Design Group, Aquatic Design Group, Rushing


ACKNOWLEDGEMENTS The Waterfront Seattle Schematic Design reflect the culmination of a year and a half of design work, and public process to establish the community’s vision for the future waterfront. Central Waterfront Committee Charley Royer, co-chair Maggie Walker, co-chair Tom Bancroft Carol Binder Mahlon Clements Toby Crittenden Bob Davidson Bob Donegan Rollin Fatland Erin Fletcher (Slayton) Ben Franz-Knight David Freiboth Gary Glant Patrick Gordon Craig Hanway Gerry Johnson Greg Johnson Bob Klein Alex Kochan Ed Medeiros Dave Meinert Nate Miles Cary Moon John Nesholm Vlad Oustimovitch Mark Reddington Catherine Stanford Brian Steinburg Tony To Ron Turner Todd Vogel

4

Maiko Winkler-Chin Martha Wyckoff Rebecca Barnes, Advisor Maud Daudon, Advisor Liz Dunn, Advisor John Finke, Advisor Matt Griffin, Advisor Jeff Hou, Advisor Kate Joncas, Advisor William Justen, Advisor Derek Mason, Advisor Chris Rogers, Advisor Julie Bassuk, Design Commission Diana Kincaid, Board of Park Commissioners David Cutler Perry Howard Diana Kincaid Tom Nelson Ex-Officio Peter Hahn, SDOT Joe McWilliams, Port of Seattle David Moseley, WSF Diane Sugimura, DPD Christopher Wiliams, Parks

City of Seattle Ed Murray, Mayor Tim Burgess, City Council President Sally Bagshaw, City Council Sally Clark, City Council Jean Godden, City Council Bruce Harrell, City Council Nick Licata, City Council Mike O’Brien, City Council Tom Rasmussen, City Council Kshama Sawant, City Council Seattle Department of Transportation Goran Sparrman, Interim Director Bob Chandler, Assistant Director for Strategic Projects Jon Layzer, Major Projects Director Angela Brady, Waterfront Program Manager Hannah McIntosh, Waterfront Program Coordinator Steve Pearce, Waterfront Seattle Project Manager Mike Johnson, Waterfront Seattle Technical Lead Seattle Department of Planning and Development Diane Sugimura, Director Marshall Foster, City Planning Director Seattle Department of Parks and Recreation Christopher Williams, Acting Superintendent Michael Shiosaki, Planning & Development Division Director Mayor’s Office of Arts + Cultural Affairs Randy Engstrom, Director Ruri Yampolsky, Public Art Director Eric Fredericksen, Waterfront Program Art Manager

Stakeholders Group Pike Place Market Washington State Ferries Port of Seattle Downtown Seattle Association Seattle Convention and Visitors Bureau Greater Seattle Chamber of Commerce Public Facilities District Waterfront property owners and tenants Seattle Parks Foundation Seattle Aquarium Individuals representing the following interests: Freight Environmental issues Labor Urban design Parks and open space Public art Cycling Pedestrian mobility Historic preservation Representatives from the following neighborhoods: Pioneer Square Belltown Waterfront West Edge Queen Anne West Seattle Ballard Magnolia


Schematic Design

SCHEMATIC DESIGN

CONTENTS BOOK 3B: POOL BARGE SCHEMATIC DESIGN

BOOK 1

1.1

Waterfront Seattle

6 12

BOOK 2

1.2 THE POOL BARGE EXPERIENCE 1.3 LOCATION & SIZE

14

POOL BARGE SCHEMATIC DESIGN 2.1 Site Context 2.2 Access, Arrival & Grading 2.3 Aquatic Program 2.4 Architecture 2.5 Materials & Furnishings 2.6 Lighting

16 18 20 22 26 28

APPENDIX 3.1 Additional Program Opportunities 3.2 Precedents

30 32

RAILROAD WAY SCHEMATIC DESIGN

MAIN CORRIDOR SCHEMATIC DESIGN

BOOK 3A

PUBLIC PIERS SCHEMATIC DESIGN

BOOK 3B

POOL bARGE SCHEMATIC DESIGN

BOOK 4

UNION STREET SCHEMATIC DESIGN

BOOK 5

OVERLOOK WALK SCHEMATIC DESIGN

BOOK 6

EAST/WEST STREETS SCHEMATIC DESIGN

5


1.1 WATERFRONT SEATTLE Over the past few years, the City of Seattle has been actively re-imagining the future of its Central Waterfront. The imminent replacement of the Elliott Bay Seawall and removal of the Alaskan Way Viaduct now present a tremendous opportunity to turn visions into reality and create a vibrant public realm that will reconnect the city and its people to their waterfront. With a new surface street, improved east-west connections and enhanced access to the waterfront, the vision for Seattle’s Central Waterfront will extend into the heart of the city and claim a new and authentic front porch on Elliott Bay. This Schematic Design document draws on the vision outlined for Waterfront Seattle in the July 2012 Planning and Design Document and specifically on the concepts described in Book 3: Concept Design, which focuses on the initial “core project” area of Waterfront Seattle. This is not a legal or binding document, but a summary of the Schematic Design work put forth during the Schematic Design phase of the Central Waterfront Project.

6


Schematic Design

GUIDING PRINCIPLES The following guiding principles were created by a group of citizens working with the city and

5. Improve access and mobility.

adopted by the City Council (Resolution #31264) to capture the key civic goals and objectives

The waterfront is and remains a crossroads. The future waterfront should accommodate safe,

that should shape the creation of new public spaces on the Central Waterfront project. They

comfortable and efficient travel by pedestrians, bicyclists, vehicles and freight.

expand on established principles from existing city policies and civic efforts. 6. Create a bold vision that is adaptable over time. 1. Create a waterfront for all.

The vision for the waterfront should clearly define how the waterfront will take shape and the

The waterfront should engage the entire city. It should be a place for locals and visitors alike

essential character of key elements. At the same time, the vision must be flexible to adapt over

—a place where everything comes together and co-mingles effortlessly.

time.

2. Put the shoreline and innovative, sustainable design at the forefront.

7. Develop consistent leadership—from concept to construction to operations.

The waterfront will bring people to the water’s edge to experience the water and ecology

It is necessary to have strong leadership tasked with realizing the waterfront vision. This

of Elliott Bay. It will improve shoreline ecology while preserving and enhancing maritime

leadership needs to ensure design excellence and root the process in a broad and transparent

activities, and will reflect Seattle’s commitment to sustainability and innovation.

civic engagement.

3. Reconnect the city to its waterfront. The waterfront should provide a front porch to the downtown neighborhoods and the city. It will build a network of public spaces that connect the waterfront to important destinations, nearby neighborhoods, the city and region. 4. Embrace and celebrate Seattle’s past, present and future. The waterfront is a lens through which to understand Seattle—from its natural history and early Native American settlements, to the rich variety of maritime, industrial, commercial and recreational activities today. The waterfront should tell these stories in ways that are authentic and bring them to life.

7


The core project

Port of Seattle

Railroad Way

Stadium Plaza

El l

iot

tB

elliott bay ay

Tr a

il

Pier 48 Century Link Field

alaskan

Colman Dock Ferry Terminal way

occidental ave .s .

Washington St. Boat Landing Seawall Beach

Tideline Promenade

occidental

.s

alaskan way

.

S. Main St. Improvements

Marion St. Pedestrian Bridge

ST . N

S. Washington St. Improvements

SO

ave .s .

Seneca St. Walk

Columbia St. Improvements

western ave.

Occidental Park

8

1st ave. seneca st.

spring st.

madison st.

marion st.

columbia st.

cherry st.

james st.

way yesler

S.

King Street Station

washington

ST .

S.

main

ST .

S.

JA

CK

S.

KI

NG

ST .

ave

Argosy Tours

Tideline Promenade

Transit Hub

1st

Pier 55

Pier 54


Schematic Design

Bell Harbor Roof Bell St. Bridge

Bell Harbor

way alaskan ad i l ro F Ra S N B

wall st.

Pool Barge ELLI

Seattle Great Wheel

Pier 56

Tideline Promenade

way

Pier 62/63

Aquarium Expansion Area

Blanchard Overlook

alaskan

AVE

Bell St. Park Extension

Lenora St. Bridge

Seattle Aquarium

Pier 57

OTT

ave. western

Union St. Pier

Aquarium Plaza

elliott

Belltown Interim Improvements

way

Blanchard Square

Overlook Walk . 1st ave

western

pine st.

pike st.

union st.

st.

st.

university st.

.

Core Projects 2nd ave

st.

seneca st.

2nd ave

st.

lenora

virginia

stewart

Seattle Art Museum

. 1 ave st

st.

Union St. Stairs + Elevator

blanchard

Pike Place Market

st.

Pike St. Hillclimb

ave.

bell

Union St. Stairs + Elevator

Victor Steinbrueck Park

battery

PC-1 Market Expansion

.

Existing Destinations Core Project Area

Benaroya Hall 0.25 MILE

9


CORE PROJECT AREAS Port of Seattle Bell Harbor Pier 48 Pool Barge Seattle Aquarium

alaskan way s. MA IN ST

ST INIA VIRG

T ST WAR STE

PINE ST

PIKE ST

SAM

UNION ST

UNIVERSITY ST

SENECA ST

SPRING ST

MADISON ST

MARION ST

COLUMBIA ST

YE SL ER WA Y

WA SH IN GT ON ST

Pike Place Market first

first ave.

ave.

Victor western Steinbrueck Park

Pike St. Hillclimb

western ave.

Occidental Park

WAY

ave.

LEGEND Book 1: Railroad Way Book 2: Main Corridor Book 3A: Public Piers Book 3B: pool barge Book 4: Union Street Book 5: Overlook Walk Book 6: East-West Streets 500 ft.

10

Y ST TER BAT

elliott

L ST BEL

Pier 57 Union Street Pier

JA CK SO N

ave .s .

Pier 56

T RD S CHA N A BL

ave .s .

ST

occidental

Argosy Tours

Bell St. Bridge

Pier 62/63

ST ORA LEN

Colman Dock Ferry Terminal Pier 54

first

KIN GS T

Century Link Field

Bell Harbor Roof


Schematic Design

Schematic design The July 2012 Concept Design document defines the Core Project Area as the first section

Related design documents are developed in parallel with the above Schematic Design Report.

moving forward into Schematic Design. The design of the Main Corridor described in this

Those include:

volume involved the coordination of several disciplines and offers an integrated approach to

• • • • • • • •

Schematic Design. The Schematic Design Deliverable includes:

• A set of Technical Drawings • A Basis of Design Technical Report • A Schematic Design Report focusing on the Public Realm.

Pier 54-59 Vehicle and Pedestrian/Bicycle data Waterfront Transit Report Public Space Program GSI Guidelines Lighting Master Plan Wayfinding Master Plan Engineering Basis of Design Document Preliminary Cost Estimate

Together, the documents listed above provide a complete picture of the Core Project Area at this time and must be understood in concert with one another. The complete Schematic Design Report will include several volumes, each focusing on a specific part of the Core Project Area:

• • • • • • •

Book 1: Schematic Design: Railroad Way Book 2: Schematic Design: Main Corridor Book 3A: Schematic Design: Public Piers Book 3B: Schematic Design: Pool Barge Book 4: Schematic Design: Union Street Book 5: Schematic Design: Overlook Walk Book 6: Schematic Design: East-West Streets

This is Book 3B: Pool Barge

11


1.2 The pool barge experience The pool barge is unique among the waterfront projects in both program and locale.

A Catalyst Project: The pool barge is inherently mobile; while designed as an anchoring element of the waterfront experience, it can be completed in advance of many of the waterfront projects

On the Bay, Looking Back at the City: While the Waterfront Seattle projects re-center the city

and moored at differing locations around the city. Accelerated completion of the project will

around the bay, leading visitors to and along the water’s edge, the pool barge allows visitors to

create an exciting attraction with high visibility that encourages people to see the waterfront

leave the land and become part of the bay, removed from the waterfront to experience a unique

from a new perspective and builds anticipation and excitement for the emerging waterfront.

vantage point back to the city. Programmed Recreation: The pool barge will bring a programmed recreation amenity to Seattle’s central waterfront, serving residents of downtown as well as visitors, complementing the passive recreation and programmed events associated with other waterfront elements. As a programmed recreation facility and a maritime vessel, the pool barge is shaped by a highly detailed level of regulatory and operations detail that will continue to guide design decisions.

On the bay...

12


Schematic Design

... Looking back at the city

13


1.3 Location & size The pool barge is a companion program element to a

The barge is sized to accommodate the desired aquatic

A key decision governing size was to allow future access to

reconstructed pier 62/63 but is structurally removed from

program (including stringent clearances around pools) while

the freshwater Lake Washington watershed, with the length

the pier itself, accessible by a gangway and floating dock.

accommodating naval architectural considerations.

and width of the vessel designed to fit within the Chittenden (Ballard) Locks. This decision has limited the width to 75

However, as a maritime vessel, it is unique in its possibility

feet to accommodate the 80-foot-wide large lock.

to move from this location to other locations around the city.

LEGEND Pool Barge Project Boundary Core Project 200 ft.

alaskan

bell harbor marina

way

75’

alaskan

viaduct

pier 62/63

way

pool

barge

282’

seattle aquarium

Project location

14

Pool barge size

Pool barge in Ballard locks diagram


Schematic Design

The mobile nature of the pool barge allows:

• Construction and operation of the pool barge at an alternate location in the city prior to completion of pier 62/63 reconstruction.

• Off-season (non-summer) relocation of the pool barge to another public access point where

MAGNUSON PARK

it can serve as an event venue for alternate programming.

• Off-season storage and ongoing maintenance of the pool barge in alternate locations from

GASWORKS PARK

the central waterfront.

LAKE UNION PARK PIER 62/63 LESCHI

DUWAMISH

SEWARD PARK

Alternate locations

15


Pool Barge schematic design

2.1 SITE context

Pier 62/63: The barge is located 65 feet south of pier 62/63 to

Complimentary Program: The pool barge and pier 62/63

enhance the experience of being on the bay, reduce the scale

programs have been developed in unison to complement and

The site context shapes the pool barge moorage location

of the barge when experienced from the pier, and minimize

energize one another and to be flexible to adapt and evolve

and its physical form and program.

environmental impacts and enhance habitat value of the

for differing short-term and seasonal programming.

near shore zone. Offsetting the barge from the pier reduced Aquatic Habitat Zone: The barge has been located to provide

the cumulative effects of otherwise combined barge and pier

Experienced on and from a Distance: While the active

ample clear space (approximately a minimum of 90 feet)

shadows and also created an eddy of reduced wave action

programmed recreation of the aquatic facilities provides a

between the stern and the aquatic habitat improvements to

between the barge and pier that is valuable to fisheries.

unique experience of swimming on and being part of the bay,

the east while still allowing an exciting perspective of the habitat zone from the barge and gangway.

the pool barge is also meant to be an iconic, energizing and Minimizing Mass: The pool barge mass has been minimized

engaging program element when viewed from the overlook

to avoid blocking views from all adjacent land and piers as

walk and pier 62/63.

Aquarium: The barge is located approximately 180 feet away

well as maximize views from the barge itself. Noteworthy

from the aquarium to mitigate view and sound impacts as

design features include minimizing vertical obstructions

well as allow for a future expansion of the Aquarium.

such as luminaires and canopies and utilizing glass barriers and guardrails.

16


Schematic Design

5

LEGEND Pool Barge Project Boundary Adjacent Project(s) Boundary

1

Pier 62/63

2

Seattle Aquarium

3

Aquatic Habitat Zone

4

Aquarium Plaza

5

Overlook Walk

5

North Waterfront Connections

1

5

3 4 100 ft.

2

Illustrative site context plan

17


Pool Barge schematic design

2.2 Access, arrival & grading

The Gangway: With tidal variation of up to 16 feet, the 120-

structure and waterfront scale will convey the realities of

foot gangway absorbs grade changes between the fixed

a working waterfront (whereas the pier will take its design

A key component of the pool barge’s experience is the

piers and floating elements. This significant span required

cues from the upland urban design). The gangway lands on

dramatic sense of arrival—leaving land, crossing, and then

a structurally robust truss (with a width of 12’) which will

the floating dock at an elevated landing at grade with the

landing on the waters of Elliott Bay. This experience is rooted

be a unique experience on the waterfront. While extreme

pool barge deck (minimizing extreme slopes of the gangway)

in complex maritime engineering and naval architecture to

low tides will exceed the typical 8.3% slope of typical ADA

and transitions to the floating docks in both stairs and ADA

provide a seamless, intuitive and ADA accessible route to

ramps, a 120-foot gangway is deemed acceptable (and is

accessible ramps. Stairs and ramps are open structures to

the barge, as well as access to all parts of the barge itself.

consistent with WSDOT standards for ferries).

reduce visual bulk and potentially allow storage areas for maritime compatible uses. In addition to accessing the pool

While the gangway and floating dock will be contractually

The Floating Dock: The floating dock and the monopiles that

barge, the dock has been designed to accommodate kayaks,

part of pier 62/63 (as a permanent maritime facility), their

secure it and the pool barge will take their design cues from

boat mooring (on the north edge), as well as passive use by

design is driven by the needs of accessing and mooring the

the maritime engineering realities of the aggressive forces

visitors who simply want access to be on the bay.

pool barge.

and elements they are designed to withstand. Their utilitarian

18


Schematic Design

LEGEND

Pool Barge Topography: The pool barge itself has two deck levels with primary

1

Floating Dock

6

Seat/steps

access provided by a series of stairs and seating steps (detailed similarly to those

2

Gangway Access to Pier 62/63

7

Ramp

3

Pool Barge Main Deck

8

Main Access to Pool Barge

4

Pool Barge Upper Deck

9

ADA Lift

5

Stairs

on the adjacent pier 62/63). An ADA accessible lift is integrated into the giant steps and underlying structure to provide access to the second story sundeck.

+15.7’ (pier 62/63)

+0’ +bs 1’ +1’

1

+ts 7’

+bs 1’

+ts 7’

2

1:12

8 +5.5’

7

+7’

+7’

+bs 7’

+ts19’

5 +14.5’

5

+ts 7’

9 +13’

3

+19’

+11.5’

6

+10’

4

+19’

+17.5’

+8.5’

+16’

+5.5’

5

+ts 7’

+bs 7’

5

Pool barge & floating dock grading plan (Note: The Pool Barge and floating dock grades shown are subject to tidal fluctuation and are relative water level)

+ts19’

20 ft.

19


Pool Barge schematic design

2.3 Aquatic program The Pool Barge will feature four bodies of water: one 25-

The Pool Barge and, therefore, the bodies of water will

ensure durability and reduce maintenance and operational

yard, six-lane lap pool, one curvilinear activity pool, and

comply with the ADA and be universally accessible to all

time required to keep the pools operational, attractive, and

two hydrotherapy spas. The different bodies of water will

people who wish to access them.

safe.

play, recreate, and relax. The various bodies of water will

Given the seasonal nature of outdoor aquatics in Seattle,

The pools will feature minimal vertical obstructions above

have different depths and temperatures to accommodate

the bodies of water will each be designed to be drained

the pool deck to help create the atmosphere and appearance

disparate programs run simultaneously and will increase

and winterized. This will reduce operating and lifecycle

of being on Elliott Bay. The pools will all be filled at the start

the draw of the barge to more than just the passing tourist.

costs that would be incurred if the pools were designed to

of each season with water taken directly from the bay, thus

be operational year-round. Materials and finishes will be

creating saltwater pools and allowing the experience to be

specified with the harsh waterfront environment in mind to

marketed as swimming in the bay as well as saving money

provide users of all aquatic interest groups a place to swim,

in terms of initial fill.

A rectilinear lap pool that can accommodate recreational swimming, aerobics, and occasional competitive meets. 20

A warm-temp, activity pool for hydrotherapy and children’s swimming with interactive water play and lazy river.

Two spa pools; these may remain operational into the shoulder season (between peak and off-peak seasons).


Schematic Design

LEGEND

The perimeter overflow system will be a deck-level or rim-flow gutter system around the perimeter. At the deep end of the pool the entire end section will be appear to be “raised” over the deck below by 18 inches to allow for an infinity edge appearance (with gutter down below)

1

Lap Pool

5

Zero Entry

2

Kids/Activity Pool

6

Stair Entry

3

Spa

7

Infinity Edge

4

Lazy River

8

Perimeter Overflow

and also to serve as a secondary means of ADA access with a transfer tier.

8

6

6

2 5

3

8 7

1 3 4 6

Pool barge aquatics plan

20 ft.

21


Pool Barge schematic design

2.4 Architecture The pool barge character is shaped by its location on the

The pool barge’s form is also shaped by a desire to minimize

The deck folds to provide both an upper and a lower deck

water as a vessel that is removed from the upland conditions

its mass to avoid blocking views from all adjacent land and

with seating and viewing integrated into the folding grade

of the rest of the waterfront project. The pool barge recalls

piers as well as maximize views from the barge itself. There

transition. The deck is surrounded by clear minimalistic

and references element details from the broader waterfront,

are two key components that determine the pool barge

windscreens providing shelter and guardrails.

such as the bleacher seating. However, the barge’s autonomy

architecture: The Bath House: All required facilities to support the

along with stringent US Coast Guard [USCG] and health code requirements allow and encourage a unique approach to

The Deck:

Home to the aquatic program, fixed and

aquatic program and other flexible program opportunities

materials and construction. As a maritime vessel, the barge

permanent furnishings, and temporary program elements,

are tucked beneath the folding deck (or below deck within

pulls its design cues from maritime precedents. Materials

the deck is intended to have minimal vertical obstructions

the barge structure).

are selected and used in a way that reinforces this character.

and to maximize the feeling of being on the bay and close to

The barge should have the look and feel of a boat.

the water’s surface.

22


Schematic Design

The exterior façade of the bath house, clad in a translucent, uniform, glass exterior envelope, is intended to reduce mass and provide reflectivity during the day and a welcome glow in the evening. An open circulation spine unites all facility elements, while also reducing bulk and allowing views through the barge from pier 62/63. The interior experience of the bath house is a wood-paneled, spa-like interior space inspired

LEGEND 1

Locker Room, Restroom, Showers

5

Connection to Main Deck

2

Ticketing and Snacks/Service

6

Storage

3

Lift to Upper Deck

7

Family Restroom

4

Bench

8

Connection to Floating Dock

by handcrafted historic wood vessels and ample natural light from a clerestory between the bath house and deck, as well as potential translucent LPS tiles in the deck above.

8 2

4

7

3 1 2 1

5

4

7

6

Pool barge architectural site plan 20 ft.

--11*

23

30% DRAWINGS


Pool Barge schematic design

massing diagram

24


Schematic Design

rendering of bath house under upper deck

25


Pool Barge schematic design

2.5 Materials & Furnishings Barge materials need to be selected to withstand salt water

but expanded to delineate the aquatic program elements and

Movable Furnishings: Movable furnishings are included on

transitioning curvilinear pool forms back to the rectilinear

the upper deck and include premium exterior furnishings

grid of the pool barge.

such as exterior couches and tables along the barge edges

and chlorinated pool water, create a unified character, and convey a maritime feel in the way they are used and oriented.

with lounging chairs and easily movable seats and tables Furnishings are intended to be minimized and managed to

toward the interior of the upper deck.

reduce visual clutter and allow maximum flexibility for deck Decking: Both the main and upper deck are planked decking

use, particularly on the lower pool deck where decking itself

Special Events: Private rentals and non-aquatic program

(cementitious or composite wood) as used as in other

can be used for seating, gatherings and laying out on a towel.

uses will reconfigure and include additional movable

maritime applications, parallel to the length of the barge.

furnishings as required on both the upper and lower decks. Permanent Furnishings: Topographic shifts in the deck

Aquatic Band: The lap pool and curvilinear activity pool are

provide the opportunity for benches and giant steps for

enveloped in a common paving treatment that takes it cues

sitting and placing pool collateral, such as bags, towels,

from the functional requirements of pool grating and tile,

pool inflatables and toys.

Decking

Aquatics Band

26

Permanent seating


Schematic Design

LEGEND 1

Planked Decking

5

Concrete

2

Permanent Seating

6

Metal Grating

3

Ceramic Slip-Resistant Tile

4

Pool Grating

2

2 3

aquatics band

aquatics band 2 3

3

4 1

1

4

20 ft.

Pool barge materials & furnishings plan 27


Pool Barge schematic design

2.6 Lighting The lighting for the pool barge will provide a safe and secure

A layered approach using rail-integrated, in-grade, and

nighttime environment for users, while providing design and

ground-mounted lighting for different applications will be

experience continuity with adjoining waterfront elements.

used throughout the project.

Lighting at the pool barge will provide a safe swimming environment for users through relatively high code-required light levels augmented with other lighting at the lap pool deck and support areas. The lighting will also be flexible so the barge can be used for events that do not include waterbased activities.

Pool lighting

28

Handrail & recessed lighting

Guardrail lighting


Schematic Design

LEGEND 1

Lighting-Integral with Windscreen Post

5

20’ Pole Luminaire

2

30’ Pole Luminaire

6

Illuminated Guardrail

3

Lighting-Recessed in Face of Bench or Seat/Step

4

Illuminated Handrail at Bench or Stairs

20 ft.

1

1

1

1

1

1

1

1

1

4

6 4

2

2

3

2

2

5

2

3 6

4

5

4 1

1

1

1

1

1

1

1

1

1

1

6

Pool barge lighting plan

29


FLOATING POOL 3.1 Additional program opportunities As a pool barge, the design program is dominated by the aquatic needs for the facility; however,

• Event Venue with Continued Hot Tub Use (Non-Summer): While the larger aquatic

the barge is also intended to be flexible enough to welcome additional non-aquatic program

elements (lap pool and activity pool) are intended to only be used during the warmer

opportunities. These could include:

summer months (May-September at most), the barge could continue to be used through

84’

394’

the shoulder seasons and even through the winter if temporary structures are introduced

• Event Venue (Summer): Whether it be in conjunction with use of some or all of the aquatic

to one or both of the decks. The desirability to use hot tubs in colder weather and the

facilities, the pool barge will provide a unique experience for events on the waterfront.

ability to isolate hot tub mechanical from other aquatic uses may allow ongoing use of hot tub facilities.

• Alternate Program: Summer use only (winterized September-May) • Major maintenance and operations (non-summer)

30

81


Schematic Design

31


3.2 Precedent: Josephine baker floating pool

Current design lessons learned • Sundeck over enclosed spaces • Multiple pools for differing aquatic program • Pool deck free of furnishings • Fully accessible to disabled • Enclosed in winter • Ample covered/enclosed space • Singular/unified character

32

plan w/ current design overlay


Schematic Design Waterfront Programming

APPENDIX B-1 badboot lido Precedent: PRECEDENT: BADBOOT LIDO FLOATING POOL floating pool ANT WERP, BELGIUM Description: Open air swimming pool on River Eilandje Lessons learned •Capacity: Multiple venues 600 people • Cool bar Cost: $4.05 million • Multiple barges & docks Sculp(IT) •Architect: Multiple ingress/egress •Shipbuilder: Floating rec HSS BV center • Series of disconnected characters and Program: elements - Swimming pool

Plan w/ current design overlay 84’

394’

Current design

- 2 event halls - Restaurant with a lounge terrace

33 81


APPENDIX B-1

3.2 Precedent: PRECEDENT: floating FLOATING pool LADY lady POOL NEW YORK CIT Y, USA Capacity: 174 people Cost: $4 million Architect: Jonathan Kirschenfeld Associates Marine Engineer: C.R. Cushing & Company

Dimensions: 260’ x 80’ x 20’ single-hull cargo barge - ~ 6’ draft ~14’ deck height - 100,000 gallons - 4,040,960 pounds 4-foot-deep steel pool sunk into the barge’s 16-foot-deep hold surrounded by precast-concrete pavers sitting 5 inches over the original deck

Logistics: Pool only handles 174 people at a time - therefore it employs a rotation plan - a system of color-coded bracelets limit Pool Operations + Safety + Programming: American Leisure users to sessions of a hour and a half each. Corporation (security, safety, evacuation, and crowd-management To keep people busy while they waited, a one-acre beach area complete with beach volleyball, sand soccer, rental umbrellas, plans) games and concessions was created.

34 82

80’

260’


Schematic Design Waterfront Programming

APPENDIX B-1

PRECEDENT: FLOATING LADY POOL

NEW YORK CIT Y, USA

Plan w/ current design overlay 260’

82’

80’

20’

Lessons learned • Reduce freeboard (height above water) • Windscreen and canopy • Spray and play park • Pedestal set pavers • Minimal furnishings around pool deck (no moveable furnishings) • Moveable lifeguard facilities • Singular/unified character

KEY 2 entry porch 3 reception 4 sun deck 5waterplay 6 changing area 7 dining terrace 8 pool 9 sun pavillion

67’

80’

current design

260’

20’

35 83