July 8, 2020 Board Packet

Page 1

Board Workshop and Regular Meeting of the Capitol Region Watershed District (CRWD) Board of Managers, for Wednesday, July 8, 2020, 5:00 p.m. (Workshop) and 6:00 p.m. (Regular Meeting) held electronically. See note below. Until further notice Board meetings will only be available via telephone and/or the web-based application Go To Meeting. You will not be able to attend meetings in person. You can join the meeting electronically by clinking on this link: https://global.gotomeeting.com/join/223415893 and following the directions or dial in using your phone: +1 (646) 749-3122 Access Code: 223-415-893 Please visit www.capitolregionwd.org to get additional CRWD COVID-19 information. I. II. III.

WORKSHOP AGENDA (5:00 PM) Call to Order of Board Workshop Review of 2021 Budget, Mark Doneux Adjourn Board Workshop

Materials enclosed

REGULAR MEETING AGENDA I.

Call to Order of Regular Meeting (President Joe Collins) A) Attendance B) Review, Amendments, and Approval of the Agenda

II.

Public Comment – For Items not on the Agenda (Please observe a limit of three minutes per person.)

III.

Permit Applications and Program Updates

(Permit Process: 1) Staff Review/Recommendation, 2) Applicant Response, 3) Public Comment, and 4) Board Discussion and Action.)

A) 20-001 Dickerman Park – Extend Permit Review Period (Hosch) B) 20-013 Ford Site Stormwater Master Plan (Kelley) C) 20-017 Hamm’s Brewery Stormwater Improvements (Hosch) IV.

Special Reports – Ford Site, MRB Crossing Funding Request, Bob Fossum

V.

Action Items A) AR: Approve Minutes of the June 17, 2020 Regular Meeting (Sylvander)

VI.

Unfinished Business A) COVID 19 Update (Doneux) B) Como Park BMPs Update (Kelley) C) Snelling Midway O & M (Kelley) D) Lake McCarrons Update (Sellner)

VII.

General Information A) Board of Manager’s Updates Our mission is to protect, manage and improve the water resources of Capitol Region Watershed District


VIII. Next Meetings A) Wednesday, July 15, 2020 7:00 PM – CAC Meeting– Electronic Only B) Wednesday, July 22, 2020 6:00 PM- Regular Meeting – Electronic Only IX.

Adjournment

Our mission is to protect, manage and improve the water resources of Capitol Region Watershed District


July 8, 2020 Board Workshop Review of Preliminary 2021 Budget (Doneux) DATE: June 30, 2020 TO: CRWD Board of Managers FROM: Mark Doneux RE: Review of Preliminary 2021 Budget ____________________________________________________________________________________ Background Each year the Board of Managers must develop a work plan for the upcoming year and establish a budget and levy to accommodate the work plan. At the May 20, 2020 Board Meeting, staff provided an update to the Board about how capital improvement project expenditures and revenue may be adjusted based on current projections. At the June 3rd Board Workshop, staff reviewed the 2020 Budget, 2020 Revised Budget, the 2021 Budget per the WMP and the 2021 Preliminary Budget based on Division Manager Recommendations. Issues The 2021 budget process will be unique in that we are both transitioning from our 2010 Watershed Management Plan (WMP) approach and budgeting to the new 2020 WMP. We also will be tracking the impacts of the COVID-19 pandemic and how it will affect our budget and revenue. The focus of the workshop will be to: 1) Review the 2021 Budget Goals, 2) Review the 2021-2023 Projected Capital Improvement Program Expenditures, and 3) Review and Comment on Preliminary 2021 Budget To support the 2021 budget process, I have updated the 2020-2021 Budget Comparison Summary that compares the current 2020 adopted budget, Revised 2020 Budget with the items identified in our new WMP for 2021 and our 2021 Budget Goals. I have also included the table that shows the 2021-2023 Projected Capital Improvement Program Expenditures. Finally, I have included a Preliminary 2021 Budget showing individual project budgets for 2021 expenditures. The Preliminary 2021 budget will be based on the items from WMP for 2021 but adjusted to reflect what programs and projects are expected to be implemented next year. At the July 22nd Board meeting, staff will provide the detailed project budgets as well as the full revenue and levy summary. Staff will review these documents with the Board at the workshop. No action is required, only general feedback is requested. Requested Action No Action Requested, Informational Only enc:

2020 -2021 Budget Comparison Summary 5-26-20 (Landscape) 2021-2023 Projected Capital Improvement Program Expenditures (Portrait) Preliminary 2021 Budget (Landscape)

W:\02 Budget and Finance\Budget - 2021\Board Memo-2021 Budget Workshop 6-30-20.docx

Our mission is to protect, manage and improve the water resources of Capitol Region Watershed District.


2020 - 2021 Budget Comparison Revised 2020

2020 Budget Total

Fund

ADMINISTRATION PROGRAMS PROJECTS

$ $ $

489,830 2,913,972 1,440,648

$

CAPITOL IMPROVEMENT PROGRAM

$

TOTAL 2020 BUDGET

$ 2,913,972

$ 3,198,150

$3,003,800

$ 1,440,648

$ 1,472,900

$1,031,000

4,844,450

$ 4,844,450

$ 5,611,050

$

5,029,800

6,942,533

$ 5,470,893

$ 6,262,400

$

3,700,000

$ 11,786,983

$ 10,315,343

$ 11,873,450

$

8,729,800

Total

Levy Other Total Revenue

$ $ $

8,277,699 1,250,000 9,527,699

$ 7,449,929 $ 1,045,788 $ 8,495,717

$ 8,277,699 $ 125,000 $ 8,402,699

$ $ $

8,277,699 125,000 8,402,699

Levy Other Total Revenue

Fund Balace Required to Balance Budget

$

2,259,284

$ 1,819,626

$ 3,470,751

$

327,101

Fund Balance Jan 1 Fund Balance Dec 31

$ $

5,014,564 2,755,280

$ 4,949,915 $ 3,130,289

$ 3,130,289 $ (340,462)

$ $

3,130,289 2,803,188

OPERATIONS TOTAL

$

ADMINISTRATION PROGRAMS PROJECTS

$995,000

$357,670

489,830

2021 Budget To Goals

940,000

ADMINISTRATIVE ALLOCATION

$

WMP 2021

OPERATIONS TOTAL CAPITOL IMPROVEMENT PROGRAM TOTAL 2021 BUDGET

Goal $8,500,000 Goal: Flat (0% change, 1-2% if necessary)

Fund Balance to Balance Budget Fund Balance Jan 1 Fund Balance Dec 31

Goal: $2,500,000+


Projected 2021 - 2023 CIP Expenditures 2021 TBI Repairs Project Initiatives Como CIPs Victoria Park Seminary Pond Science Museum Phalen Creek 2007 Bond Debt Payback TBI Water Q/Q Debt Service Total Expenditures

$ $ $ $ $ $ $ $ $

2022

950,000 500,000 700,000 100,000 300,000 50,000

2023

$ $ $ $

300,000 750,000 $ 500,000 $ 370,000 $

750,000 500,000 380,000

$ $

100,000 100,000 $

200,000

$ 1,100,000 $ 3,700,000 $

300,000 $ 900,000 $ 3,320,000 $

300,000 900,000 3,030,000

-


FUND

PROGRAM/PROJECT TITLE

PROGRAM/PROJECT DESCRIPTION

PRIORITY LEVEL (Critical, Important, Beneficial)

WMP 2021

Proposed 2021 Budget

ADMINISTRATION 101

2021

Administration

Description

A

General administration

The District administration work includes ongoing activities that recur annually to satisfy Minnesota Rules for watershed districts and those that pertain to the organization, administration and coordination of programs, services and facilities provided by the District. It includes development of annual budgets and levy, the annual audit and preparation of an annual report of previous year's activities and accomplishments.

Critical

$

B

Citizen Advisory Committee

The District's work is supported by a Citizen Advisory Committee (CAC) comprised of up to 16 residents. The CAC assists the Board of Managers with organizational development, planning processes and program implementation. CAC meetings are held once a month. CAC administration costs are reflected in general administration #101A.

Critical

$

C

External funding opportunities

Critical

$

5,150

E

Office operations

The District owns its office building and site at 595 Aldine Street in Saint Paul, MN and the adjacent parcel at 1736 Thomas Avenue. The District is responsible for facility and site management, maintenance and repairs of both parcels. The District will evaluate the need and potential uses for the 1736 Thomas building and site in the 10-year plan period.

Critical

$

133,900

F

MAWD support

The District provides office space and administrative and programmatic support for the MN Association of Watershed Districts.

Important

$

5,150

$5,000

Safety Program

The District's comprehensive safety program outlines the policies, procedures, and best practices to ensure staff and others safety in the workplace and minimize frequency and severity of accidents. The District conducts annual safety training, provides monthly safety reminderst to staff, updates procedures and operations as neededed and audits the safety program every three years.

Critical

$

41,200

$35,000

Diversity and inclusion program

The District values diversity and inclusion and can achieve cleaner waters through engagement across communities. The District will work to achieve the goals of its diversity strategic framework. The goals include: 1) expand the District’s internal awareness of the opportunities and challenges related to creating a more diverse and inclusive environment, 2) deepen relationships with many communities by increasing outreach, 3) increase organizational diversity and inclusion efforts, and 4) be a leader in diversity and inclusion initiatives.

Critical

$

10,300

$15,000

$

968,200

$995,000

G

H

The major sources of CRWD funding are local tax revenue and State Clean Water Fund grants. CRWD will identify and pursue other funding sources (e.g., other grants, special tax districts, environmental improvement bonds) to augment traditional sources.

1

772,500

-

$775,000

$10,000

$5,000

$150,000


FUND

PROGRAM/PROJECT TITLE

PROGRAM/PROJECT DESCRIPTION

PRIORITY LEVEL (Critical, Important, Beneficial)

WMP 2021

Proposed 2021 Budget

PROGRAMS 208

Regulatory Program

Description

2021

The District implements a permit application and review program per the authority granted in Minnesota Statutes 103D to ensure compliance with the standards outlined in the District Rules.

A

General permitting implementation

Stormwater management, wetland, floodplain, erosion and sediment control, illicit discharge, and other rules adopted by our Board of Managers govern the District permitting

B

Coordinated erosion and sediment control inspections

C

D

Critical

$

206,000

$206,000

During construction, sites are inspected for compliance with local and State erosion and sediment control regulations. Multiple jurisdictions and layers of regulation can result in duplicative efforts or inconsistent messaging regarding onsite inspection and enforcement. A process to streamline and coordinate efforts across jurisductions will be developed to benefit both the regulated entites and the regulators.

Important

$

206,000

$206,000

Permittee post construction BMP inspections

Permitted BMPs have been implemented for over 10 years. The District will work with partners to ensure BMPs are being inspected, maintained, and repaired to ensure function and compliance with District rules.

Important

$

15,450

$20,000

Engagement activities with permittees, developers, engineers, and applicants

Ensuring the regulated community understands District stormwater requirements is important to creating an efficient permit review and approval process. The District will offer the private development community an opportunity to provide input on their experiences with regulation. Their input will inform District efforts in engagement and support in the Regulatory Program.

Important

$

5,150

$5,000

Critical

$

15,450

$20,000

requirements. Current District rules are available from the District website at: https://www.capitolregionwd.org/permits/watershed-rules/

The District currently implements rules that address water quality and quantity, erosion control, wetland protection, illicit discharges in the Trout Brook Storm Sewer Interceptor, and floodplain

E

Rules evaluation and update

management. The District will periodically evaluate its regulations to ensure adequate progress towards meeting water quality goals and standards and addressing other pollutants. The District

will focus on keeping these rules clear and up to date with revisions as needed, improving compliance and inspections, and coordinating District rules with other local, state, and federal regulatory requirements. In addition, the District will evaluate the cost cap for linear projects and the stormwater impact fund approximately every two years.

I

Illicit Discharge Detection and Elimination (IDDE) plan implementation

Working with public partners, the District will seek to improve regulations on the identification and eliminatation of illicit discharges to the stormwater system. In addition, the District will offer technical assistance to District cities, businesses, institutions and other property owners in the elimination of illicit discharges. An IDDE plan outlining action steps was completed in 2018.

Important

$

41,200

$40,000

K

Industrial stormwater permittee coordination

Industrial Sector Stormwater NPDES Permit sites may have high pollutant loads and increased potential for illicit discharges. The District will work with partners to assess compliance on industrial permit sites and provide assistance with inspection, enforcement, and technical information to improve compliance rates.

Important

$

5,150

$5,000

L

Water reuse policy support

Water reuse in MN and within the District is a growing approach to conserving water resources and managing stormwater runoff. Yet there isn't statewide comprehensive policy or guidance on water reuse. The District will support the State's efforts to develop comprehensive water reuse policy and guidance and updates to the State plumbing code.

Critical

$

5,150

$5,000

$

499,550

2

$507,000


FUND

210

PROGRAM/PROJECT TITLE

PROGRAM/PROJECT DESCRIPTION

PRIORITY LEVEL (Critical, Important, Beneficial)

WMP 2021

Proposed 2021 Budget

Grants Program

Description

Stewardship grants

The District will continue to encourage District residents, businesses, schools, non-profits and others to adopt clean water practices by offering technical assistance and cost-share grants. The Stewardship Grant Program includes communication and coordination with interested property owners, site visits, plan designs, grant administration and project implementation assistance.

Critical

$

515,000

$500,000

E

ROW projects - boulevard raingardens

The District will continue to leverage municipal street reconstruction projects for implementation of raingardens in boulevards, medians or other ROW spaces to reduce stormwater volumes and pollution, increase native, pollinator-friendly vegetation, and enhance aesthetics in neighborhoods. As part of District cities' projects, the District will investigate the potential for constructing boulevard rain gardens and where feasible, provide designs and financial assistance for construction. The District will review and evaluate the District cities' street reconstruction schedule for potential opportunities.

Important

$

25,750

$26,000

B

Stewardship grant outreach

For nearly 15 years, hundreds of property owners in the District have implemented clean water projects through the District's grant program. However, a majority of the grant funded projects have been concentrated in the western half of the District. The District seeks to expand outreach and promotion of the Stewardship Grant Program in underserved areas to increase diversity of project participants and provide equitable access to the grant program.

Critical

$

5,150

$10,000

C

Stewardship grant project inspection and maintenance assistance

The District will ensure grant project success by inspecting BMPs and identifying areas of improvement for the first five years. BMP maintenance workshops, maintenance guides, individual assistance and other types of assistance will be offered to grantees.

Important

$

20,600

$21,000

F

Well-sealing Grants

Abandoned, unsealed wells provide a direct pathway for contaminants to enter groundwater. The District will continue to provide well sealing grants to protect local groundwater resources.

Beneficial

$

10,300

$10,000

G

Large-scale site planning grants

The District will continue to offer planning grants for studying the feasibility and developing concept designs of cost-effective and/or innovative projects that retain water and protect and improve the water quality of waterbodies within the District.

Important

$

103,000

$50,000

$

679,800

$617,000

A

2021

3


FUND

PROGRAM/PROJECT TITLE

PROGRAM/PROJECT DESCRIPTION

PRIORITY LEVEL (Critical, Important, Beneficial)

WMP 2021

Proposed 2021 Budget

Monitoring, Assessment and Research Program

Description

A

Stormwater monitoring and data collection

The District will continue to monitor the quality and quantity of stormwater runoff to identify water quality problem areas, quantify subwatershed runoff pollutant loadings, provide data for the calibration of hydrologic, hydraulic, and water quality models, and promote understanding of District water resources and water quality. Currently the District operates 15 stormwater monitoring sites.

Critical

$

360,500

$360,000

B

Lake monitoring and data collection

The District and its partners will continue to monitor water quality, biological health (vegetation and fish surveys) and hydrologic characteristics of the District lakes including Como Lake, Lake McCarrons, Loeb Lake, Crosby Lake, and Little Crosby Lake.

Critical

$

113,300

$110,000

C

BMP performance monitoring

The District will continue to monitor the effectiveness of stormwater best management practices in reducing stormwater runoff volumes and pollutant loads. BMP monitoring sites include Green Line green infrastructure practices, Upper Villa stormwater reuse and infiltration system, Trout Brook Nature Sanctuary, Williams Street Pond and other sites.

Critical

$

154,500

$150,000

D

Monitoring database and reporting tool

The District utilizes a monitoring database system to organize, view, and query all years of data, more efficiently edit, analyze, and review data, improve data sharing and access to data, and provide a consistent method for saving data to prevent data loss. In addition, an online, interactive, map-based tool allows water resource professionals, researchers, residents and other interested individuals to access and download District monitoring data.

Important

$

61,800

$27,000

E

Wetland biological integrity monitoring

The District assesses the health of wetlands in the watershed by monitoring plants and macroinvertebrates as surrogate for wetland health. District wetlands are monitored regularly to track wetland health over time and assess performance of stormwater improvement or wetland restoration projects.

Important

$

20,600

$15,000

F

Monitoring data trend analysis and reporting In years 1 and 2 of the plan, the District will analyze 15 years of stormwater quality and quantity and lake and wetland data to determine trends and other findings. The trend analysis will be for public presented in engaging, visually appealing format(s) to share with District staff, the Board, partner agencies and the public.

Important

$

20,600

$20,600

Important

$

211

2021

G

Citizen Science Monitoring Program

Beginning in year 3 of the plan, the District will identify opportunity(ies) for monitoring by interested citizens. These opportunities may be based on existing, established citizen-based programs. The District will provide participants with training and equipment to collect basic water quality or biological measurements. This would both expand the District's data collection while also allowing residents to engage with the mission and work of the District. See also Item 220F.

H

Research program

The District will support and collaborate with partners including the MN Stormwater Research Council on pilot tests of innovative BMPs, assessing effectiveness of traditional and innovatIve BMPs, researching fate and transport of stormwater pollutants, benefits of non-structural BMPs and other topics as they emerge.

Important

$

51,500

$50,000

I

Emerging contaminants and water quality issues

The District will periodically review available data and research regarding emerging contaminants to determine if programmatic changes are needed including development and implementation of a monitoring plan. Emerging contaminants to consider investigating further include microplastics, perfluoroalkyl substances (PFAS), pharmaceuticals and other human made contaminants.

Important

$

15,450

$15,450

$

798,250

$758,050

4

-

$10,000


FUND

220

PROGRAM/PROJECT TITLE

PROGRAM/PROJECT DESCRIPTION

PRIORITY LEVEL (Critical, Important, Beneficial)

WMP 2021

Proposed 2021 Budget

Communications and Engagement Program

Description

2021

A

General communications and engagement

The District will research demographics throughout the District to better understand the communities we serve. The District will develop brand standards and common language for all clean water practices and translate scientific content to better engage and inform residents about the District monitoring and research program. The District's communications tools will expand to include more videos, graphics, iconography, photos, virtual/augmented reality and translated materials. The District will expand and strengthen media relationships. In addition, a database of all District contacts will be created to streamline and better manage communication and engagement. The District will evaluate C&E programs to determine effectiveness.

Critical

$

267,800

$260,000

B

Project Communication

The District will develop communications plans and tools such as signage, fact sheets, news releases, videos, graphics and more to convey project benefits to key audiences.

Critical

$

51,500

$50,000

C

Clean Streets

The District will expand the Adopt-a-Drain program and support initiatives such as the Como Curb Clean-up to engage residents in preventing leaves from entering storm drains and nearby waterbodies. In addition, new programs for residents and businesses will be developed that promote smart salting practices and alternatives to chlorides.

Important

$

41,200

$41,200

D

Maintenance Workshops for Water Quality

The District will provide annual workshops for city staff and transportation agency staff that promote best practices for managing winter roads/sidewalks and turfgrass. The District will continue to identify new training opportunities to encourage good housekeeping practices that prevent pollution from reaching nearby waterbodies.

Critical

$

20,600

$15,000

E

Digital Communications

The District will expand and enhance engagement via digital platforms including social media, the District website and a monthly newsletter. The District will showcase seasonal best practices for managing water quality at home, upcoming community events, CRWD’s grant programs and projects and more.

Critical

$

61,800

$61,800

F

Volunteer Programs

The District will continue to offer the Master Water Stewards Program. In addition, the District will expand volunteer opportunities to promote environmental stewardship at a community level and explore opportunities to conduct citizen science that informs the District’s programs and projects. See Fund 220G.

Important

$

41,200

$31,000

G

Sponsorships

The District will sponsor lectures, workshops, festivals and more to inform and engage residents and young people in water resource protection as well as identify opportunities to sponsor activities led by new partner organizations in communities underserved by the District.

Important

$

30,900

$30,900

H

Partnerships

The District will foster relationships with existing partners and expand them to include organizations working with audiences that have been underserved by the District. The budget for partnerships is included in general communications and engagement fund.

Critical

$

I

Events

The District will attend, present and exhibit at community events with an emphasis on opportunities in communities or with residents that have been underserved by the District. New engagement strategies and tools will be developed to meaningfully engage residents and partners.

Important

$

51,500

$20,000

J

Awards program

The District will honor individuals and organizations that exemplify watershed stewardship through activities or projects that demonstrate a commitment to help protect, manage and improve our lakes, ponds and wetlands and the Mississippi River as part of the District’s Watershed Steward Awards.

Beneficial

$

15,450

$15,450

K

Youth programs

The District will expand program offerings to engage youth in learning about and protecting CRWD’s water resources in traditional and non-traditional settings.

Important

$

25,750

$20,000

L

Partner Grant Program

The District will expand grant opportunities for community, arts, environmental organizations, schools and faith-based groups to raise awareness about local water resources and promote clean water actions by residents.

Important

$

180,250

$150,000

M

Public Art Program

The District will continue coordinating the Watershed Artist in Residence program and develop events and workshops centered around the arts to engage residents in water resource learning and protection.

Important

$

30,900

$30,900

N

595 Aldine communications and engagement The District will develop BMP interpretive signage, hands-on learning opportunities and exhibits to engage visitors in water resource learning and protection at the District's office.

Important

$

51,500

$51,500

5

-


FUND

PROGRAM/PROJECT TITLE

PROGRAM/PROJECT DESCRIPTION

PRIORITY LEVEL (Critical, Important, Beneficial)

WMP 2021

$

Proposed 2021 Budget

870,350

$777,750

Facility (Infrastructure) Management Program

Description

A

District-owned facility management

The District owns stormwater infrastructure including a 6-mile long, regional stormwater conveyance system, Trout Brook Interceptor, and stormwater BMPs including Green Line BMPs, Como Subwatershed BMPs, Highland Ravine practices and its office BMPs. The District will regularly inspect, maintain and repair all District owned systems, as needed, to ensure proper function and performance over their intended lifespan.

Critical

$

206,000

$200,000

B

Shared ownership (District/partner) facility management

There are some District projects in which ownership and maintenance responsibilities are split up or shared between the District and project partners. Examples include Curtiss Pond and Upper Villa BMPs. The District anticipates it will assume maintenance responsibility of more shared BMPs as they come online in the next ten years (e.g. Seminary Pond, Como Park/Golf Course BMPs). The District will take the lead in regularly inspecting, maintaining, and repairing these systems to ensure proper function and performance over their intended lifespan.

Critical

$

51,500

$52,000

C

Partner owned facility management and ownership evaluation

At the request of District city and county partners, the District provides inspection, maintenance and repair services for projects owned by partners including the Snelling Midway Rainwater Harvesting and Reuse System and Willliams Street Pond. These projects typically serve multiple parcels and/or are demonstrating new innovations and technology in stormwater management. During this 10-year timeframe, the District will discuss, evaluate and consider ownership of the last 1/2 mile of TBI, appurtenant facilities to TBI including Willow Reserve and Arlington Jackson stormwater ponds, Como Lake outlet, and Lake McCarrons outlet.

Critical

$

61,800

$62,000

E

BMP database

The District established a web-based BMP database to track and manage projects constructed as part of the District's permit, grant, and/or capital improvement project programs. The District will continue to update and improve the functionality of the database and expand its usage as the maintenance of more BMPs fall under the responsibility of the District.

Critical

$

30,900

$30,000

$

350,200

$344,000

222

2021

PROJECTS - Planning, Design and CIPs 301 F

401

A

Groundwater

Description

2021

Ramsey County groundwater plan

It is anticipated that Ramsey County will review and update the draft County groundwater plan. The District will support the County's efforts. A timeline for this work has not been defined.

Groundwater

Description

Future groundwater projects

The District will support future groundwater management projects that are identified in District and partner led groundwater studies and assessments.

Important

$

-

$

2021

6

Important

$

20,600

$

20,600

$0


FUND

305/405 305

PROGRAM/PROJECT TITLE

PROGRAM/PROJECT DESCRIPTION

PRIORITY LEVEL (Critical, Important, Beneficial)

WMP 2021

Proposed 2021 Budget

Como Lake Subwatershed Como Lake Subwatershed Projects

Description

2021

A

Como Lake WQ model

The Como Lake water quality model will be updated with the revised subwatershed loads developed in 2018, direct sediment core P flux measurements collected in 2016, and recent observed monitoring data.

Critical

$

20,600

B

AIS Management including herbicide treatment of curlyleaf pondweed

The aquatic vegetation community in Como Lake is dominated by curly leaf pondweed with low diversity of other native macrophytes. The District and its partners will work to control curly leaf pondweed with herbicide treatments. An aggressive management strategy in the first three years starting in 2020 will be applied. Once curlyleaf pondweed in under control, management efforts can focus on establishment of a diverse, native aquatic plant community.

Critical

$

15,450

$15,000

C

Lake vegetation management plan and implementation

The District will collaborate with MNDNR to develop and implement a long-term lake vegetation management plan (LVMP) to establish and maintain a healthy and diverse, native aquatic plant community. The plan should also consider strategies to keep curly leaf pondweed under control following initial herbicide treatments, which may also require periodic, small-scale herbicide treatments. Mechanical harvesting of native vegetation may also be required to prevent nuisance growth conditions following curly leaf pondweed control.

Critical

$

10,300

$10,000

D

Balanced fishery target development

The District will collaborate with MNDNR to develop and implement a “Como Lake Fisheries Management Plan” that defines long-term targets for a diverse, ecologically balanced fishery that can also support and sustain recreational fishing for the community.

Important

$

7,725

$7,000

E

Shoreline management plan and implementation

Following an initial shoreline assessment, the District and the City of Saint Paul will develop and implement a “Como Lake Shoreline Management Plan” that emphasizes native plant diversity, wildlife habitat, shoreline stabilization, and capture of surface runoff. Local partners and volunteers shall assist with shoreline vegetation management projects.

Important

$

25,750

$25,000

F

Street sweeping enhancement

In the first two years of the plan, the District will coordinate efforts with municipal partners to develop and implement a “Como Watershed Street Sweeping Plan” that prioritizes streets for sweeping based on subwatershed load reduction potential, tree species type (leaf phosphorus content, typical leaf drop timing), source potential, and logistics.

Important

$

51,500

$25,000

J

Future stormwater management planning

The District will collaborate with partners to identify and study potential opportunities for implementation of stormwater BMPs as part of public and private redevelopment projects in the Como Lake subwatershed. An example is construction of boulevard curb cut raingardens during street reconstruction projects. See Appendix C of CLMP.

Important

$

20,600

$20,000

H

Water-based recreational activities support

Recreation is the most significant way people interact with Como Lake. The District will support the work of its partners on water-based recreational activities at Como Lake and may include maintenance and improvement of existing fishing areas, identification of additional fishing areas, annual community fishing event, maintenance of non-motorized boating channels, and onthe-water eductional opportunities.

Beneficial

$

23,175

$23,000

I

Como Park area drainage infrastructure analysis and planning

The City of Saint Paul and Ramsey County are interested in better understanding the drainage and flooding issues at Como Golf Course (Hole 8 and Lexington Parkway ponds) and Gottfried's Pit, identifying solutions to address them and determining the most efficient and effective approach to operating and maintaining drainage infrastructure.

Important

$

51,500

$50,000

7


FUND

PROGRAM/PROJECT TITLE

PROGRAM/PROJECT DESCRIPTION

PRIORITY LEVEL (Critical, Important, Beneficial)

WMP 2021

Proposed 2021 Budget

226,600

$175,000

1,030,000

$500,000

$ Como Lake Subwatershed Capital Improvements

Description

A

Como Golf Course BMPs

The District will construct regional BMPs on the Como Golf Course in plan years 1 and 2. It includes installing infiltration systems adjacent to the Como Zoo and retrofitting the northwest Como Golf Course Pond with an iron enhanced filtration bench. Combined, the projects are estimated to remove 55 pounds of total phosphorus each year.

Critical

$

B

Como Pavillion BMPs

The District will support the City of St. Paul Parks and Recreation in the design and construction of regional and small scale BMPs in coordination with parking lot improvements for the Como Lake Pavilion. An exact timeline for this project is unknown.

Critical

$

D

Como Lake Alum Treatment

Diffusive flux of phosphorus from Como Lake sediments is a significant source of phosphorus and a primary driver of water quality problems in Como Lake. Alum treatement was recommended in the CLMP to address in-lake phosphorus loading from teh bottom sediments. The District, in collaboration with the City of Saint Paul, will apply alum to inactivate mobile sediment phosphorus and mitigate internal phosphorus loading in year 1.

Critical

$

360,500

F

Gottfried's Pit Improvements

The District will support its government partners in the design and construction of improvements at Gottfried's Pit to alleviate flooding and improve water quality.

Important

$

51,500

G

Future capital improvement projects (CIPs)

The District will collaborate with public and private partners in implementation of clean water projects identified in previous feasibility studies that are outlined in the 2018 Como Lake Management Plan and studies that occur during the life of the 10-year plan.

Important

$

103,000

$

1,545,000 $

405

2021

-

$150,000

$50,000

700,000

313/413

Lake McCarrons Subwatershed Projects

313

Lake McCarrons Subwatershed Projects

Description

C

Watershed Hydraulic/Hydrologic Modeling

The District and its partners will perform watershed hydrologic and hydraulic modeling to assess flood risk of structures and infrastructure including a known flooding issue at the intersection of Cohansey Boulevard and Bossard Avenue.

Important

$

41,200

$40,000

D

Lake vegetation management plan and AIS response plan

The Lake McCarrons AIS response plan, completed in 2018, defines the process and criteria by which AIS will be managed on Lake McCarrons. In addition, the lake vegetation management plan will define thresholds of AIS that necessitate active management and define goals under which aquatic plants will provide beneficial ecological and biological functions on Lake McCarrons.

Important

$

20,600

$20,000

B

Villa Park wetland system evaluation

The District and partners shall evaluate the performance of the Villa Park wetland system and investigate options for improving its functionality in year 4.

Important

$

2021

-

$ 413

Lake McCarrons Subwatershed Capital Improvements

Description

61,800 2021

$

8

-

$20,000

$80,000


FUND

315/415 315

PROGRAM/PROJECT TITLE

PROGRAM/PROJECT DESCRIPTION

PRIORITY LEVEL (Critical, Important, Beneficial)

WMP 2021

Proposed 2021 Budget

Loeb Lake Subwatershed Loeb Lake Subwatershed Projects

Description

A

Update Loeb Lake Management Plan

The District will update the Loeb Lake Management Plan based on recent chemical, biological, and hydrological monitoring data and water quality improvement projects conducted within the subwatershed. High priority issues will be identified and goals and implementation activities adapted accordingly.

Important

$

25,750

$0

D

Loeb Lake sedimentation pond investigation

The District and its partners will investigate options to improve pollutant reduction and flood control of the sedimentation pond connected to Loeb Lake.

Important

$

20,600

$20,000

E

Future stormwater planning

The District will conduct future water retention and stormwater management studies and projects based on the recommendations from an updated Loeb Lake Management Plan and as opportunities arise.

Important

$

10,300

$

56,650

415

A

317/417 317

H

417

C

2021

Loeb Lake Subwatershed Capital Improvements

Description

Future CIPs

The District will design and construct future capital improvement projects (CIPs) that arise out of redevelopment opportunities or are identified in the updated lake management plan and future studies.

$20,000

2021

Important

$

30,900

$

30,900

$0

Crosby Lake Subwatershed Crosby Lake Subwatershed Projects

Description

2021

Future stormwater management planning

The District will conduct future stormwater management studies and projects based on the recommendations in an updated Crosby Lake Management Plan or as redevelopment opportunities arise.

Crosby Lake Subwatershed Capital Improvements

Description

Future CIPs

The District will support the design and construct future capital improvement projects (CIPs) that are identified in the updated lake management plan, future studies, or as redevelopment opportunities arise.

Important

$

20,600

$

30,900

$0

2021

9

Important

$

77,250

$

77,250

$0


FUND

320/420 320

PROGRAM/PROJECT TITLE

PROGRAM/PROJECT DESCRIPTION

PRIORITY LEVEL (Critical, Important, Beneficial)

WMP 2021

Proposed 2021 Budget

Trout Brook Subwatershed Trout Brook Subwatershed Projects

Description

NPDES stormwater program

TBI is a regulated municipal separate storm sewer system (MS4). The District operates TBI under a State MS4 permit and an approved stormwater pollution prevention program (SWPPP) to minimize stormwater volumes and pollution to local waters. The SWPPP outlines activites for stormwater education and outreach, public involvement, illicit discharge detection and elimination, construction erosion and sediment control, post-construction stormwater mangement, and pollution prevention/good housekeeping. On an annual basis, the District evaluates its previous year SWPPP activities and accomplishments and updates its SWPPP as needed.

Important

$

10,300

$10,000

C

TBI H&H model update and expansion

In 2012, the District updated and calibrated a hydrologic/ hydraulic model of the TBI. The model determined the 2-, 10-, and 100-year flood flows for the TBI using Atlas-14 (current) precipitation depths. In addition, the model projects flood flows for the 500-year storm event which correlates to a moderate projection for the 100-year storm event in 2050. Because the model uses very coarse hydrology (over 50 acre watersheds on average) and primarily models only the hydraulics of the TBI, the District and the City of Saint Paul will increase hydrologic and hydraulic resolution to the model by adding in more detail from the tributary watersheds and municipal/MnDOT storm sewers in 2020 and 2021 (year 1 of the plan).

Important

$

103,000

$350,000

E

TBI easement verification, acquisition, and documentation

There are a number of areas where the District does not own a permanent easement for TBI or the District easement is insufficient for performing maintenance and repair work. The District will continue to work with Ramsey County attorney and its consultants in negotiating and acquiring adequate easements for TBI.

Important

$

103,000

$100,000

D

TBI Flood Mitigation and Water Quality Improvement Studies

The District will conduct flood mitigation and water quality improvement studies in the top three priority flooding areas identified in the TBI H/H Model Update Report. The three priority areas are: Maryland Ave. W./Norton St. N., Maryland Ave. W/Grotto St. N., and Arlington Ave. E./railroad. A study will be conducted every three years starting in year 1.

Critical

$

77,250

$0

F

Future stormwater management planning

The District will support BMP feasibility studies as redevelopment opportunities arise in the Trout Brook subwatershed.

Important

$

30,900

$

324,450

$460,000

$950,000

B

2021

Trout Brook Subwatershed Capital Improvements

Description

A

TBI Repairs Station 28+65 - 50+72

Starting in the fall 2020 and extending through winter 2021, the District will repair TBI from St. 28+65 to 50+72, which is generally in fair to poor condition. Recommended repairs from the 2019 CIP include sealing of surface reinforcement, crack and fracture sealing, minor surface repair and removal of sediments.

Critical

$

952,750

E

Future CIPs

The District will support the design and construction of CIPs identifed in feasibility studies or as opportunities arise.

Critical

$

103,000

$

1,055,750

420

2021

10

$950,000


FUND

PROGRAM/PROJECT TITLE

325/425

Wetland, Stream, and Ecosystem Restoration

325

PROGRAM/PROJECT DESCRIPTION

PRIORITY LEVEL (Critical, Important, Beneficial)

WMP 2021

Wetland, Stream, and Ecosystem Restoration Description Projects

Proposed 2021 Budget

2021

A

Phalen Creek Daylighting

Based on the findings of the Phalen Creek Daylighting Feasibility Study completed in 2018, the District will develop detailed concepts for daylighting options adjacent to the Rush Line BRT project. Design development started in 2020 and may continue into year 1 prior to full BRT design work. In the District's Stream Corridor Restoration Plan which was developed as part of the 2010 WMP, Phalen Creek was given high ratings for opportunity, constructability and alignment with District goals.

E

Willow Reserve signage and access

D

Critical

$

103,000

$50,000

The completion of vegetation restoration in Willow Reserve in 2020 provides an opportunity to improve accessibility and conduct outreach in the Reserve. The City of Saint Paul is seeking grant funds for the design and construction of access points, trails, boardwalks, and scenic outlooks in the Reserve. Also interpretive signage is planned for the Reserve. The District will support Saint Paul Parks and Recreation Department and North End Neighborhood Association in these water-related engagement and access projects between years 1 and 3.

Important

$

25,750

$30,000

Cascade Creek/Fountain Creek daylighting feasibility study

The City of Saint Paul is investigating the feasibility of improving Ayd Mill Road, which offers an opportunity for the District to explore daylighting of Cascade and Fountain Creeks which historically flowed through this area. The District will consider conducting a feasibility study to evaluate daylighting and restoration of the two creeks based on City and community interest. In the District's Stream Corridor Restoration Plan which was developed as part of the 2010 WMP, Cascade/Fountain Creeks were rated medium for opportunity, constructability and alignment with District goals.

Beneficial

$

51,500

G

Wetland Restoration Planning

The City of Saint Paul, with support from the District and other partners, will develop a wetland management plan that includes an inventory of existing wetlands, identification of priority sites for protection/restoration and a process to minimize the loss of wetland area and function. The District will work with BWSR to ensure that opportunities to restore or create wetlands within the District are not in conflict with the Wetland Conservation Act banking requirements. The District will extend wetland work beyond the City of Saint Paul boundaries to develop a plan for the remaining areas in the District.

Important

$

H

Natural resource inventories and/or management plans

The District will conduct natural resource inventories and identify natural resource management goals, strategies and opportunities in the Trout Brook and Phalen Creek subwatersheds. Inventories and plans in other subwatersheds will be conducted if there is strong partner interest and opportunities arise to leverage with other projects.

Important

$

25,750

$0

$

206,000

$155,000

$

82,400

$0

$

82,400

425

E

Wetland, Stream, and Ecosystem Restoration Description Capital Improvements Future wetland/stream/natural resource restoration projects

-

$75,000

2021

The District will support partner initiatives on natural resource, wetland, stream and ecosystem projects and recommendations from District natural resource management plans with an emphasis on projects in the Trout Brook and Phalen Creek subwatersheds.

11

Important


FUND

330/430 330

PROGRAM/PROJECT TITLE

Mississippi River Gorge Subwatersheds Mississippi River Gorge Subwatersheds Projects

PROGRAM/PROJECT DESCRIPTION

PRIORITY LEVEL (Critical, Important, Beneficial)

WMP 2021

Proposed 2021 Budget

Saint Anthony and Miss. River Blvd subwatersheds Description

2021

A

Towerside Innovation District stormwater management planning

The Towerside Innovation District encompasses 370 acres on the eastern edge of Minneapolis and western edge of Saint Paul and Capitol Region Watershed District. Towerside is pursuing district systems approach for heating/cooling and energy, parking, green public realm and stormwater management. The District will support Towerside stormwater management planning within District boundaries. The basis for future stormwater planning will come from a Towerside and CEZ Green and Blue Infrastructure framework being developed in partnership with Mississippi Watershed Management Organization. Its completion is anticipated in 2020.

C

UM/MN State Fair Cooperative Projects

The District is conducting the Gortner Avenue feasibility study to identify potential stormwater BMPs that may be shared between partners at the University of Minnesota, the MN State Fairgrounds, Ramsey County, and the City of Falcon Heights. In addition, Sarita Wetland on the University of Minnesota campus is another parternship opportunity for wetland restoration.

Important

$

25,750

$0

D

Future stormwater management planning

The District will support stormwater management planning on future redevelopment sites and enterprise zones within the Saint Anthony and Mississippi River Boulevard subwatersheds.

Important

$

20,600

$0

$

72,100

$0

Mississippi River Gorge Subwatersheds Capital Improvements

Description

D

Seminary Pond stormwater improvements

The District and the City of Lauderdale will construct flood mitigaton and water quality improvements for Seminary Pond and adjoining ravine areas. Construction is slated to begin in fall 2020 and extend through spring 2021. The improvements include converting Seminary Pond from a dry pond to a wet pond by deepening the pond and raising the berm, installation of an iron-enhanced sand filter along the pond edge to remove dissolved phosphorus and stabilizing several steep ravine slopes upstream of Seminary Pond.The project is estimated to control stormwater volumes up to 10-year, 24 hour storm event and reduce sediment and phosphorus loads by approximately 40%.

C

UM/MN State Fair Cooperative Projects

E

Future CIPs

430

Important

$

25,750

$0

2021

Critical

$

515,000

$300,000

The District will support government and institutional partners in the design and construction of future CIPs based on recommendations of the cooperative stormwater studies.

Beneficial

$

206,000

$0

The District will support the design and construction of future CIPs based on the findings and recommendations from stormwater management planning efforts.

Important

$

51,500

$

772,500

12

$300,000


FUND

331/431 331

PROGRAM/PROJECT TITLE

PROGRAM/PROJECT DESCRIPTION

PRIORITY LEVEL (Critical, Important, Beneficial)

WMP 2021

Proposed 2021 Budget

Mississippi River Confluence Subwatersheds Hidden Falls, Davern, West and East Kittsondale, West 7th, and Goodrich subwatersheds Mississippi River Confluence Subwatersheds Description Projects

2021

B

Ford redevelopment site comprehensive stormwater planning

The District has supported stormwater management planning efforts at the 135-acre Ford Redevelopment Site for over ten years. The District will continue to support planning and design efforts that furthers progress on a design of a District stormwater management approach and a central water feature that will feed a restored Hidden Falls creek.

Critical

$

51,500

$25,000

C

Area C Ford site planning

The District will continue to advocate and support comprehensive environmental investigation of Ford's Area C, a former waste disposal area located below the Ford redevelopment site.

Important

$

51,500

$25,000

E

Future stormwater management planning

The District will support stormwater management planning on future redevelopment sites within the Hidden Falls, Davern, West and East Kittsondale, West 7th and Goodrich subwatersheds.

Important

$

20,600

$

123,600

$50,000

431

Mississippi River Confluence Subwatersheds Description Capital Improvement Projects

2021

Ford redevelopment district stormwater system and central water feature

The City of Saint Paul and Ryan Companies will construct a central water feature and district stormwater management system for the Ford redevelopment site starting in 2020. The District will continue to offer technical and financial assistance in realizing the watershed goals of "bringing water back to Saint Paul," retaining water on the landscape and regional stormwater management at this 135-acre redevelopment site.

Critical

$

1,030,000

$500,000

C

Victoria Park stormwater improvements

In 2018, the City of Saint Paul, with support from the District, completed a stormwater feature feasibility study in Victoria Park located on the Mississippi River Bluff. The study included preliminary concepts and cost estimate of $1.6M. The District will provide support to the City in the design and construction of the stormwater feature and water quality improvements in Victoria Park.

Critical

$

103,000

$100,000

D

Future CIPs

The District will support the design and construction of future CIPs based on the findings and recommendations from stormwater management planning efforts.

Important

$

51,500

$

1,184,500

B

332/432 332

E

Mississippi River Downtown Subwatersheds Saint Anthony Hill, Downtown, Phalen Creek, and Urban Subwatersheds Mississippi River Downtown Subwatersheds Description Projects Future stormwater management planning

2021

The District will leverage redevelopment opportunities within the Saint Anthony Hill, Downtown, Phalen Creek and Urban subwatersheds to study the potential of innovative, cost-effective and highly visible and educational stormwater BMPs. Opportunities include the Wakan Tipi Center at Bruce Vento Nature Sanctuary.

13

Important

$

30,900

$600,000


FUND

PROGRAM/PROJECT TITLE

PROGRAM/PROJECT DESCRIPTION

PRIORITY LEVEL (Critical, Important, Beneficial)

WMP 2021

$ 432

Mississippi River Downtown Subwatersheds Description Capital Improvement Projects

Proposed 2021 Budget

30,900

$0

2021

C

Science Museum of Minnesota

In 2020, the Science Musum of Minnesota with support from the District conducted a campus wide feasibility study for improving stormwater management. The District will continue its support to the Science Museum by providing financial and technical assistance for the design and construction of innovative and/or highly visible, education-focused stormwater BMPs.

Critical

$

257,500

$50,000

D

Future CIPs

The District will support the design and construction of water quality and flood mitigation CIPs recommended in the future Phalen Creek subwatershed studies and future redevelopment sites including Wakan Tipi Center.

Important

$

154,500

$0

$

412,000

$50,000

14


FUND

PROGRAM/PROJECT TITLE

PROGRAM/PROJECT DESCRIPTION

PRIORITY LEVEL (Critical, Important, Beneficial)

WMP 2021

Proposed 2021 Budget

370/470

Watershed Wide Planning, Assessment and Implementation

370

Watershed Wide Planning and Assessment Projects

Description

D

Partner agency plan review and comment

The District will review and comment on federal, state and local water-related regulations, plans, policies, and studies that are pertinent to the work of the District.

Important

$

20,600

$21,000

E

GIS Program

The District will manage and update its GIS data, resources and software needs

Important

$

51,500

$30,000

F

Saint Paul watershed governance exploration

The City of Saint Paul is exploring the role, services and benefits that a watershed district could provide for the City's West Side neighborhood including stormwater regulations, cost-share grants, and infrastructure management. The District will support the City in its comparison of a watershed district to a watershed management organization.

Important

$

20,600

$10,000

G

Public private partnership opportunities

The District will identify and cultivate new public-private partnerships to make progress towards achieving its WMP goals. New private partners to consider include business organizations, developers, institutions, etc.

Important

$

10,300

$0

H

District Flooding Prioritization and Solution Identification

The District will work with Cities to prioritize known localized flooding areas including 35E and County Rd. B, Sarita wetland area, Fairview trunk system, Como Golf Course (Hole 8), Curtiss Field, Bridal Veil Creek, Lowertown, and low lying area along University Avenue near Transfer Road. Flood mitigation solutions will also be identified as part of planning storm sewer projects including Ramsey County Rice Street Improvement Project.

Important

$

51,500

$0

K

District Chloride Source Assessment and Prevention Plan

The State developed a metro-wide Chloride Reduction Plan. The District will work within its partners to develop a watershed specific chloride management plan that encompasses existing activities (winter training, FB posts, monitoring) and new strategies (updated rules, incentives, expanded outreach inc. small businesses) to reduce chloride usage and chloride loading to District lakes and the Mississippi River.

Important

$

51,500

$0

N

Green infrastructure practices are natural and engineered systems that mimic the natural water cycle by capturing, filtering and/or infiltrating stormwater runoff to reduce polluted Tools for quantification of non-SW benefits of stormwater discharges to local waterbodies. Green infrastructure also provides other environmental, social and economic benefits. The District will explore and compare various tools green infrastructure available for quantification of the non-stormwater benefits of green infrastructure and identify and utilize the preferred tools in stormwater management planning.

Important

$

25,750

$0

A

Transportation Redevelopment Projects Stormwater Feasibility Studies/Preliminary Engineering

Future transportation projects, such as Riverview transit corridor, Gold Line BRT, Rush Line BRT, and I-94, offer opportunities to explore improved stormwater management in those corridors. The District shall support partners in stormwater management feasibility studies.

Important

$

30,900

$0

B

Great River Passage Project - Feasibility Studies/Preliminary Engineering

In 2013, the City of Saint Paul adopted the Great River Passage Master Plan, a comprehensive framework for creating vibrancy within the City's 3,500 acres of parkland along a 17- mile stretch of the Mississippi River. Key capital initiatives of the plan include the River Learning Center/National Park Service MNRRA Headquarters and River Balcony. Both projects are located within the District. The District will support the City of Saint Paul and non-profit partners in stormwater planning and outreach at these sites and others identified in the Master Plan.

Important

$

30,900

$30,000

Climate science and community resiliency

The District will incorporate current and future understanding of climate change and precipitation trends as they pertain to the quality and quantity of District water resources, flood risk, and stormwater practice design and maintenance. The District's climate change and community resiliency work may entail research, planning, communications and engagement, and reporting.

Critical

$

20,600

$0

O

2021

15


FUND

PROGRAM/PROJECT TITLE

PRIORITY LEVEL (Critical, Important, Beneficial)

PROGRAM/PROJECT DESCRIPTION

WMP 2021

$ 470

Proposed 2021 Budget

293,550

$91,000

Watershed Capital Improvements

Description

2021

A

Transit Redevelopment Stormwater CIPs

Based on the findings of transit stormwater feasibility studies, the District will support transit partners in the design and construction of stormwater BMPs.

Important

$

51,500

$0

B

Great River Passage CIPs

The District will support the City of Saint Paul and non-profit partners in the design and construction of highly visible and educational stormwater BMPs.

Important

$

77,250

$0

E

Debt and Loan Service

The District will make annual payments towards its existing CIP bonds and loan.

Critical

$

1,081,500

$1,100,000

$

1,210,250

$1,100,000

Fund Categories

2021

2021

100 - ADMINISTRATION 200 - PROGRAMS 300 - PROJECTS 400 - CIPs

$ $ $ $

968,200 3,198,150 1,426,550 6,391,150

$995,000 $3,003,800 $1,031,000 $3,700,000

All Funds

$

11,984,050

$8,729,800

Budget Adjustments to Meet Goal

Operations CIP

16

Goal $ $ $

5,000,000 3,500,000 8,500,000

Current $5,029,800 $3,700,000 $8,729,800


July 8, 2020 III. Permits A.) Dickerman Park Improvements 3rd Review Extension Request (Hosch)

DATE: TO: FROM: RE:

July 1, 2020 CRWD Board of Managers Elizabeth Hosch 3rd 60-day Review Period Extension for Permit 20-001

Background The current review period for Permit 20-001 Dickerman Park Improvements expires on 7-8-2020. Issues The applicant requested an additional extension to the 60-day review period prior to the expiration. Additional time has been needed to work through plan revisions and resubmittal is expected between board packet preparation and the July 8th Board meeting. Requested Action Approve 3rd 60-day review period extension for Permit 20-001 Dickerman Park Improvements to expire September 6, 2020.

W:\07 Programs\Permitting\2020\20-001, Dickerman Park improvements\Brd Memo Extension request 20-001 Dickerman Park Improvements.docx

Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District.


Capitol Region Watershed District Applicant:

Nick Koch Ryan Companies US, Inc. 533 S Third Street, Suite 100 Minneapolis, MN 55415

Permit 20-013 Ford Site Redevelopment Stormwater Masterplan Consultant: Anthony Adams Ryan Companies US, Inc. 533 S Third Street, Suite 100 Minneapolis, MN 55415

Description: Stormwater Master Plan approval for the 122 acre Ford Site Redevelopment project. Stormwater Management: Five Iron Enhanced Sand Filtration basins, five underground StormTrap systems with filtration media cartridge vaults, two wet ponds, and one recreated stream section District Rule: —C, D Disturbed Area: 122 Acres Impervious Area: 86.22 Acres STAFF RECOMMENDATION: Approve Permit 20-013 with 3 Conditions, and Direct Staff to Issue Permits 20-013A-2013H per the Approved Ford Site Alternative Permitting Process. 1. Receipt of $161,500 surety based on public/ROW impervious, broken down by BMP drainage area (see table in permit report). 2. Revise XPSWMM model or plans to correspond per conditions 2a-2d in the permit report. 3. Provide permanently reinforced emergency overflows (EOFs) for all biofiltration basins. Dictate and plan for the EOF at the time of construction to reduce or eliminate future erosion when the basin overflows per conditions 3a-3d in the permit report

Permit Location

Permit Report 20-013

Aerial Photo Board Meeting Date: XX/XX/XXXX


Capitol Region Watershed District Permit Report CRWD Permit #:

20-013

Review date:

June 15, 2020

Project Name:

Ford Site Redevelopment Stormwater Masterplan

Applicant:

Nick Koch Ryan Companies US, Inc. 533 S Third Street, Suite 100 Minneapolis, MN 55415 612-492-4678 nick.koch@ryancompanies.com

Purpose:

Redevelopment of the former Twin Cities Ford Assembly Plant from an abandoned industrial parcel to a mixed-use commercial and residential neighborhood. Site redevelopment includes creating 36 commercial and residential blocks, roadways, bike paths, and several private open and public park spaces over approximately 122 acres. Permanent stormwater management consists of five subsurface storage areas with proprietary filtration units, five surface biofiltration basins with ironenhanced sand media, two retention ponds, and one stormwater channel that has a rate control element.

Location:

Highland Park neighborhood of St. Paul generally bounded by Ford Parkway to the north, Cleveland Avenue South to the east, and Mississippi River Boulevard to the south and west.

Applicable Rules:

C&D

Recommendation:

Approve Permit 20-013 with 3 Conditions, and Direct Staff to Issue Permits 20-013A-2013H per the Approved Ford Site Alternative Permitting Process

EXHIBITS: 1. Appendix B – 100% Infrastructure Plan Set (522 Sheets/536 Pages), by Kimley-Horn, dated 5/27/20, recv. 6/4/20. 2. Appendix C – Stormwater Management Plan (580 Pages), by Barr Engineering, dated 6/2020, recv. 6/4/20. 3. Appendix E – Operations and Maintenance Manual (282 Pages), by Ryan Companies, Kimley-Horn, and Barr Engineering, dated 6/3/20, recv. 6/4/20. 4. Appendix G – Geotechnical Evaluation Report Working Draft (495 Pages), by Braun Intertec, dated 5/22/20, recv. 6/4/20. W:\07 Programs\Permitting\2020\20-013 Ford Site Stormwater Master Plan\20-013 Permit Report_R2.doc Page 1 of 6


5. Appendix I – XPSWMM, HydroCAD, and P8 Models, by Barr Engineering, not dated, recv. 6/4/20. 6. 100% Infrastructure Design Narrative (21 Pages), by Ryan Companies, dated 5/27/20, recv. 6/4/20. 7. Exhibit 1 - Redevelopment Summary, by Ryan Companies, not dated, recv. 6/4/20. 8. Exhibit 3 - 90% Comment Response Document, by Ryan Companies, not dated, recv. 6/4/20. 9. Exhibit 7 - Site Logistics Plan, by Ryan Companies, dated 2/21/20, recv. 6/4/20. 10. Exhibit 14 - Construction Stormwater Management Plan, by Ryan Companies, dated 5/27/20, recv. 6/4/20. 11. Exhibit 16 - Stormwater Management Paths, by Barr Engineering, dated 5/27/20, recv. 6/4/20. 12. Exhibit 17 - Stormwater Impervious Assumptions, by Barr Engineering, not dated, recv. 6/4/20. 13. Exhibit 18 - Stormwater Impervious Design Spreadsheet, by Barr Engineering, not dated, recv. 6/4/20. 14. Exhibit 29 - Overall Landscape Plan, by Kimley Horn, dated 5/27/20, recv. 6/4/20. HISTORY & CONSIDERATIONS: Over a ten-year period, the City of St. Paul worked with Ford Motor Company and area stakeholders to establish the Ford Site Zoning and Public Realm Master Plan for the former manufacturing plant in Highland Park to guide the future redevelopment of the site. The Masterplan established six new zoning districts, provided the framework for the future public right-of-way and open spaces, provided guidance for private site design, and established development requirements for a Master Developer to bring the new mixed-use development to life. The City’s Masterplan encompassed approximately 135 acres including the 122-acre Ford Site property, the existing Highland Village Shopping Center property, and the CP Rail property. The Ryan Development Plan only includes redevelopment of the 122-acre Ford Site parcel and is expected to develop approximately 150,000 ft2 of Retail, 265,000 ft2 of Office, 50,000 ft2 of Civic/Institutional, and 3,800 units of residential including 1-6 unit homes, condominiums, senior housing, affordable housing, and multifamily housing. This review will cover Stormwater Management (Rule C) and Flood Control (Rule D). Permit for erosion and sediment control (Rule F) is covered under CRWD Permit 20-009. Permit for Wetland Management (Rule E) is covered under CRWD Permit 20-015. RULE C: STORMWATER MANAGEMENT Standards  Proposed discharge rates for the 2-, 10-, and 100-year events shall not exceed existing rates.  Developments and redevelopments must reduce runoff volumes in the amount equivalent to an inch of runoff from the impervious areas of the site.  Stormwater must be pretreated before discharging to infiltration areas to maintain the long-term viability of the infiltration area.

W:\07 Programs\Permitting\2020\20-013 Ford Site Stormwater Master Plan\20-013 Permit Report_R2.doc Page 2 of 6


ďƒ˜ Developments and redevelopments must incorporate effective non-point source pollution reduction BMPs to achieve 90% total suspended solid removal. Findings 1. A hydrograph method based on sound hydrologic theory is used to analyze runoff for the design or analysis of flows and water levels. 2. Runoff rates for the proposed activity do not exceed existing runoff rates for the 2-, 10-, and 100-year critical storm events. Stormwater leaving the project area is discharged into a well-defined receiving channel or pipe and routed to a public drainage system. 3. Stormwater runoff volume retention is not achieved onsite in the amount equivalent to the runoff generated from 1.1-inch of rainfall over the impervious surfaces of the development. a. The amount of proposed impervious is 3,755,743 ft2 (86.22 ac). b. Volume retention required: 3,755,743 ft2 x 1.1 inches x 1 ft/12 inches = 344,276 ft3 Table 1. Proposed volume retention through abstraction (i.e. infiltration, reuse). Volume 2.5-inch Volume Retention 1.1-inch Retention Runoff Runoff BMP Provided below Required 3 3 (ft (ft3) outlet (ft ) ) (ft3) 344,276 None, filtration is proposed. 4. Alternative compliance has been requested due to contaminated soils and shallow bedrock. a. The applicant partially complied with the volume retention standard. b. Filtration using iron-enhanced sand media (80% credit) is proposed; filtration required: 344,276 ft3 x 1.25 credit factor = 430,346 ft3 Table 2. Proposed volume retention through enhanced filtration. Filtration Filtration 1.1-inch Volume Volume Runoff BMP Required Provided below (ft3) (ft3) outlet (ft3) Northwest Biofiltration Basin 1 (B1) 38,703 30,403 Northwest Biofiltration Basin 2 (B2) 22,270 16,443 Central Biofiltration Basin 1 (B3) 36,700 21,850 430,346 Central Biofiltration Basin 2 (B4) 22,293 13,297 South Biofiltration Basin (B5) 112,593 54,816 Total 232,559 cf

2.5-inch Runoff (ft3) 69,097 37,371 49,658 30,220 124,582

i. Filtration volume and facility sizes have been calculated using the appropriate hydrologic soil group classification and design filtration rate.

W:\07 Programs\Permitting\2020\20-013 Ford Site Stormwater Master Plan\20-013 Permit Report_R2.doc Page 3 of 6


ii. The filtration areas are capable of filtering the required volume within 48 hours. iii. Stormwater runoff is pretreated to remove solids before discharging to filtration areas. c. Filtration using StormFilter with Phosphosorb Media (64% credit) is proposed; filtration required: (430,346 ft3 – 232,559 ft3) / 1.25 x 1.56 credit factor = 246,838 ft3 Table 3. Proposed volume retention through StormFilter filtration. Filtration Filtration 1.1-inch Volume Volume Runoff BMP Required Provided below (ft3) (ft3) outlet (ft3) Civic Plaza (ST-03) 95,446 63,808 Falls Passage East 1 (ST-04) 50,488 45,616 Falls Passage East 2 (ST-05) 29,049 23,008 246,838 Hidden Falls Headwater 1 (ST-06) 55,602 55,243 Hidden Falls Headwater 2 (ST-07) 28,918 14,339 Total 259,503 ft3

2.5-inch Runoff (ft3) 145,019 103,673 52,290 125,553 32,588

i.

Filtration volume and facility sizes have been calculated using the appropriate hydrologic soil group classification and design filtration rate. ii. The filtration areas are capable of filtering the required volume within 48 hours. iii. Stormwater runoff is pretreated to remove solids before discharging to filtration areas. d. The applicant did not partially comply with the volume retention standard at an offsite location or through the use of qualified banking credits. e. The applicant has not submitted money to be contributed to the Stormwater Impact Fund. f. The project is not linear. 5. Best management practices achieve 90% total suspended solids removal from the runoff generated on an annual basis. 6. A memorandum of agreement for maintenance of stormwater facilities exists between the City of St. Paul and the CRWD. Adequate maintenance access is provided for the above and below ground systems. A site-specific plan, schedule, and narrative for maintenance of the proposed stormwater management practices has been submitted. RULE D: FLOOD CONTROL Standards  Compensatory storage shall be provided for fill placed within the 100-year floodplain.  All habitable buildings, roads, and parking structures on or adjacent to a project site shall comply with District freeboard requirements. Findings W:\07 Programs\Permitting\2020\20-013 Ford Site Stormwater Master Plan\20-013 Permit Report_R2.doc Page 4 of 6


1. There is no floodplain on the property according to FEMA. 2. All habitable buildings, roads, and parking structures on or adjacent to the project site have not been evaluated for compliance with CRWD freeboard requirements. Low floor elevations, and low openings are not provided in the submitted plans. Recommendation:

Approve Permit 20-013 with 3 Conditions, and Direct Staff to Issue Permits 20-013A-2013H per the Approved Ford Site Alternative Permitting Process

Conditions: 1. Receipt of $161,500 surety based on public/ROW impervious, broken down by BMP drainage area (see table below). Permit/BMP Drainage Area A – Gateway Park and Offsite Trails B – Civic Plaza StormTrap (ST-03) C – Central Filtration Basin D – North Central StormTrap (ST-04) E – South Central StormTrap (ST-05) F – East Headwaters StormTrap (ST-06) G – West Headwaters StormTrap (ST-07) H – Headwaters Filtration Basin Total

Public/ROW Impervious Area (ac) 5.9 4.6 6.8 3.6 2.0 3.2 0.6 5.6 32.3

Surety $29,500 $23,000 $34,000 $18,000 $10,000 $16,000 $3,000 $28,000 $161,500

2. Revise XPSWMM model or plans to correspond: a. Clarify why the downstream invert between the bypass manholes and the HDS units are modeled higher than shown in the plans. This is consistently done for all HDS units included in the XPSWMM. Example: Downstream invert of Link LMH01_H01 is 804.56 in XPSWMM and 802.88 on Sheet 218 in the plans. b. Weir elevations for SFIL_BH1 and SFIL_BH2 in Multiple Link SFIL_BH are 799.5 in the XPSWMM and 799.66 (CB-05) and 799.65 (CB-06) on Sheet 224 in the plans. c. Clarify why the upstream and downstream inverts of links between StormFilters and JS Structures are modeled higher than shown in the plans. This is consistently done for all StormFilter units included in the XPSWMM. Example 1: Upstream invert of Link LSF03_JS03 is 818.18 in XPSWMM and 814.95 on Sheet 207 in the plans. Example 2: Downstream invert of Link LSF03_JS03 is 817.3526 in XPSWMM and 812.15 on Sheet 207 in the plans. d. Downstream invert of Link LSG06_JS06 is 803.2 in XPSWMM and 800.37 on Sheet 213 in the plans. 3. Provide permanently reinforced emergency overflows (EOFs) for all biofiltration basins. Dictate and plan for the EOF at the time of construction to reduce or eliminate future erosion when the basin overflows. a. Ensure 100-year HWL is below the EOF and the EOF at least 0.5’ below top of basin berm. The reinforced EOF (i.e. riprap, TRM) shall then extend to the toe of the slope to prevent erosion.

W:\07 Programs\Permitting\2020\20-013 Ford Site Stormwater Master Plan\20-013 Permit Report_R2.doc Page 5 of 6


b. Northwest basins: i. HWL = 808.1 and 808.0 ii. Proposed contours are not clearly defined, but EOF appears to be west or north side of the basins. iii. Create an EOF route with TRM to the adjacent street or public drainage system, or demonstrate that overflow velocity and shear stress will not cause erosion. c. Basin B3 i. HWL = 814.1 ii. Entire length of adjacent trail is proposed at 814.0 iii. Specify EOF location and elevation, depress trail at this location, and then reinforce slope on downstream side of trail. d. Basin B4 i. HWL = 814.0 ii. 814 contour encircles the basin. iii. Similar to B3, specify EOF location and elevation, depress trail at this location, and then reinforce slope on downstream side of trail.

W:\07 Programs\Permitting\2020\20-013 Ford Site Stormwater Master Plan\20-013 Permit Report_R2.doc Page 6 of 6


June 17th, 2020 III. Permits, B. Ford Site Alternative Permitting Process Update

DATE: TO: FROM: RE:

June 11, 2020 CRWD Board of Manager Forrest Kelley, PE, Regulatory Division Manager Ford Site Alternative Permitting Process

Background Ryan Companies recently purchased the 122 acre Ford Site property in St. Paul. Permit 12-023 Ford Site Demolition was recently transferred from Ford Motor Company to Ryan, and 30% design plans were reviewed by CRWD in January. Sixty percent design drawings were submitted on January 21st, 2020. Final stormwater design plans are currently under review, and CRWD staff expect to issue Rule C. permits at the July 8th Board Meeting. Issues The scale, complexity and duration of the project necessitate a modified approach to issuing permits for stormwater management and erosion and sediment control. Coordination with City department review, approval, inspection and close out will be critical to minimize potential conflicts and duplication. CRWD staff propose the following process be used to break the 122 acre site into 10 individual permits to increase flexibility. Erosion Control: Permit 12-023 Ford Site Demolition. Transferred to Ryan on 1/17/2020 and provides for surface demolition, stockpiling of materials, and minor grading for retaining wall removal. $134,000 surety check was received from Ryan, and a surety return check was issued back to Ford for the same amount. This was based on 67 acres of land disturbance. Does not include approval for site mass grading or utility installation work. Permit closeout requested by staff 06/17/2020 Permit 20-009 Ford Site Mass Grading. Issued 05/01/2020 for mass grading of the site in preparation for utilities, right of way improvements, and building sites. Additional surety of $110,000 ($244,000 total) was submitted by Ryan Companies for the expanded land disturbance beyond the original 67 acres for plant demolition. Erosion control sureties can be returned in phases consistent with the Stormwater Management permits described in the section below. All work within permitted drainage areas must be complete for this surety to be returned.

Stormwater Management: Permits 20-013A through 20-013H. Stormwater Management permits will be broken into 8 smaller areas based on drainage boundaries to site BMPs as shown in the attached exhibit. These permits will be issued concurrently, but closeout will be phased based on completion of each area. Surety will be collected at $5,000/acre of the impervious surfaces within the public Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District.


Right of Way, Parks, and privately owned civic spaces. Surety will be returned upon completion of all Parks and ROW, and a combination of all private parcels achieving temporary stabilization, and/or gaining coverage under a new permit for which a separate surety has been collected. Permit 2X-0XX. Individual stormwater and erosion control permits for private development parcels will be applied for, reviewed, and approved following the standard permit application process. Surety will be collected at $5,000/impervious acre impervious, and returned upon confirmation of completion and BMP function. Wetland Management Permit Permit 20-015 Ford Site Redevelopment Wetlands. Approved at the 06/03/2020 Board Meeting, this permit covers wetland impacts and the required 2:1 mitigation. A surety of $37,986 will be collected as part of the financial assurances required by WCA and the City when wetland impacts are proposed to occur prior to beginning construction on wetland replacement. Surety will be returned upon completion of the required monitoring period documenting successful establishment of wetland hydrology and vegetation. Requested Action Authorize Staff to Implement the Ford Site Alternative Permit Process Enc: Draft Ford Site Alternative Permit Process- BMP Drainage Area Approach. W:\07 Programs\Permitting\2020\20-009 Ford Site Mass Grading\Ford Site Permitting Process\Ford Site Alternative Permitting Process 2020-06-11.docx

2


Barr Footer: ArcGIS 10.7.1, 2020-04-06 10:59 File: I:\Projects\23\62\1289\Maps\Reports\Stormwater Report\90% Design\Figure4_ProposedConditions.mxd User: kjn2

KENNETH ST

20-013A Gateway Park

FORD PKWY

20-013B Civic Plaza StormTrap Subwatersheds HILLCREST AVE

Central Biofiltration

HILLCREST AVE

Central Pond 20-013C Central Filtration Basin

North Biofiltration 1

North Pond

NN

KE

South Biofiltration ET

LD WI

ST-03 20-013F East Headwaters StormTrap HS

ST-03 (offsite)

ST

T

ER

INT

ST-04 S AVE SAUNDER 20-013G West Headwaters StormTrap S

U PA

ST-05

VE LA

CLEVELAND AVE S

South Channel 20-013E South Central StormTrap

SA

ver Mississippi Ri

Outlot D (Central Water Feature)

HOWELL ST S

INNER DR

North Biofiltraion 2 20-013D North BOHLAND AVE Central StormTrap

20-013H Headwaters Filtration Basin ST-06

ST-06 ROME (offsite)AVE ST-07 Overland Flow

MONTREAL AVE Non-Tributary

Point Discharge Locations Proposed Storm IRE AVE

YORKSHStorm Existing Conditions Sewer

INT

0 VILLARD AVE

500

Feet

T

Adapted by CRWD from Barr Figure 4 Appendix C, Stormwater Management Plan

N

C ME OR

MAGOFFIN AVE

; !

Proposed Ford Site PROPOSED CONDITIONS Alternative Permit STORMWATER RUNOFF ROUTING Process - BMP Stormwater Report Drainage Area FIGURE 4 Approach

COLETTE PL

FINN ST S

DS

BLV

COLBY ST

ER

BOWDOIN ST

RIV

PRIOR AVE S

VE LA

I IPP ISS

U PA

S MIS

HIRE A VE

SA

YORKS


SHEET 203 2

SS

SS

SS

SS

HIDDEN FALLS CREEK OUTLET, SEE SHEET 224

SS

UNDERGROUND STORAGE ST-06, SEE SHEET 213

SHEET 217

SS

CIVIC SQUARE

SHEET 201

OUTLET WITH WEIRS, SEE SHEET 222 SS

SS

SS

SS

SS

UNDERGROUND STORAGE ST-03, SEE SHEET 207

UNDERGROUND STORAGE ST-05, SEE SHEET 211

UNDERGROUND STORAGE ST-04, SEE SHEET 209

RETAINING WALL, SEE SHEET 231

SS

SS

SS

SS

SS

SS

BIOFILTRATION BASIN B5, SEE SHEET 224

SS

SS

PEDESTRIAN BRIDGE

SS SS SS

FLOW

SS

BIOFILTRATION BASIN B4, SEE SHEET 221

CENTRAL POND P1 SEE SHEETS 220, 221

GE

A ASS

LS P FAL BLOCK 7

UNDERGROUND STORAGE ST-07, SEE SHEET 215

BLOCK 36

BLOCK 27

ST WE

SS SS

YOR

BLOCK 2

HIDDEN FALLS CREEK AND DRY DETENTION BASIN, SEE SHEET 224

FL O W

SHEET 202 BLOCK 8

BLOCK 32

IR KSH

BLOCK 21

BLOCK 25

GE Y WA

BLOCK 6

BLOCK 9

WN

A ODL

WO

CHW

BEE

.

SIS

AVE

MIS

BLOCK 19

2

AVE

1. 2. 3.

.

4.

WOODLAWN AVE.

5. BLOCK 14

WOODLAWN AVE.

IR IPP

S

IVE

. LVD RB

DESIGN NOTES:

OOD

SHEET 200

BLOCK 31

. AVE

LA VIL

HILLCREST AVE.

BLOCK 1

NEIGHBORHOOD PARK

VE. SA

BLOCK 20

R NDE

SAU

M

MOUNT CURVE BLVD.

EAL NTR

BLOCK 26

N OU

VE.

D.

BLV

E URV TC

MO

BLOCK 15

BLOCK 10

BLOCK 35

EA

BIOFILTRATION BASIN B3, SEE SHEETS 220, 221

FORD PKWY.

OW

FL

SS

SS

SS

CRETIN AVE.

CRETIN AVE.

6. 7.

FINISHED GRADING PROVIDED BY RYAN COMPANIES. ROAD, WALK AND TRAIL DESIGN PROVIDED BY KIMLEY HORN. WATER AND SANITARY DESIGN PROVIDED BY SAMBATEK AND KIMLEY HORN. PARK SPACE DESIGN ABOVE 100-YR. WSE PROVIDED BY CONFLUENCE AND KIMLEY HORN. DESIGN NOTES APPLY TO SHEETS 199-246A BY BARR ENGINEERING. FOR SWM STRUCTURE TABLE, SEE SHEET 246A. FOR DRAWINGS 199-246A, REFER TO STORMWATER MANAGEMENT "SWM" SPECIFICATIONS.

SS

GATEWAY PARK

SURVEY NOTES: BLOCK 5

BIOFILTRATION BASIN B2, SEE SHEET 218

CRWD NOTES: 1. G

IV E

SS

R

BL

SS

VD

.

SS

R

IN RK PA

SS

PI

SS

IP

SS

SS

NORTH POND P2 SEE SHEET 218

SS

SI

PROPERTY LINES, R.O.W. AND STREET LAYOUT PROVIDED BY KIMLEY HORN. SITE FINISH GRADES PROVIDED BY RYAN COMPANIES.

NOTIFY CAPITOL REGION WATERSHED DISTRICT INSPECTOR AT LEAST 24 HOURS BEFORE THE CONSTRUCTION OR INSTALLATION OF ANY STORMWATER BMP'S (ph. 651-644-8888).

SS

IS

2.

AVE.

M

BLOCK 8

BOHLAND

BIOFILTRATION BASIN B1, SEE SHEET 218

1.

FLOW

SS

2

1

UPDATED PLANIMETRIC AND GRADING BY OTHERS

-

No. Date 2

Revisions

07/01/2020 BULLETIN #2

App. MRM

DRAWING NAME C-199.DWG DESIGNED BY:

DRAWN BY: CHECKED BY: DATE: PROJECT NO.

Project Office:

BARR EPF MRM 06/03/2020 23/62-1289.00

Corporate Headquarters: Minneapolis, Minnesota Ph: 1-800-632-2277

BARR ENGINEERING CO. 4300 MARKETPOINTE DRIVE Suite 200 MINNEAPOLIS, MN 55435 Ph: 1-800-632-2277 Fax: (952) 832-2601 www.barr.com

PLAN: STORM SEWER - OVERVIEW SHEET LAYOUT

0

50

100

SCALE IN FEET I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. PRINTED NAME

MATTHEW R. METZGER

SIGNATURE DATE

06/03/2020

LICENSE #

47651

200

ISSUED FOR CONSTRUCTION RYAN COMPANIES US, INC. FORD SITE REDEVELOPMENT CITY OF ST PAUL, MINNESOTA PRELIMINARY SITE PLAN

SHEET LAYOUT

199 522


LEGEND

>

> >

>

>

>

STORM SEWER (DESIGN BY BARR) STORM SEWER (DESIGN BY KIMLEY HORN)

>

>

SANITARY SEWER

>

WATER MAIN

>

TP-38 >

STORM MANHOLE (DESIGN BY BARR)

>

>

>

>

>

>

>

>

>

> FLOW

>

>

>

>

>

>

>

>

>

>

>

>

> >

TP-1

TEST PIT, SEE GEOTECH REPORT BY BRAUN INTERTEC

SHEET NOTES:

>

1.

>

2. 3.

1

>

>

>

4

4.

2

>

810

>

804.5

2

TIE ALL JOINTS AT RCP PIPE OUTLETS, INCLUDING AT THE CONNECTION TO A FLARED END SECTION (OR APRON) AND BETWEEN THE FINAL TWO PIPE SECTIONS LOCATED UPSTREAM OF THE FLARED END SECTION (OR APRON). AT A MINIMUM, THE FIRST (3) PIPE JOINTS NEED TO BE TIED.

>

4

206

PROPOSED SIDEWALK

206

>

SEE

4

SEE

PROPOSED BIKE PATH

PROPOSED SIDEWALK

CB-01 60" CATCH BASIN W/ 60" HAALA GRATE

FOR POND P2, BASIN B2, AND BASIN B2 PLAN AND PROFILE, SEE SHEET 218. REFER TO PARK/CIVIC PLANS FOR SIDEWALK AND OTHER PROGRAMMING ELEMENT DESIGN. FOR RCP STORM SEWER TYPICAL DETAIL, SEE 238

>

240

TP-2 CB-02 60" CATCH BASIN W/ 60" HAALA GRATE

810 >

CB-08 30" CATCH BASIN W/ SOLID CASTING

1

>

>

>

>

>

CHECKED BY:

PROPOSED RECREATIONAL TRAIL

1 -

PLAN: PROPOSED STORM SEWER, WET POND P2, BIOFILTRATION BASIN B1, B2

DATE: PROJECT NO.

Project Office:

EPF MRM 06/03/2020 23/62-1289.00

Corporate Headquarters: Minneapolis, Minnesota Ph: 1-800-632-2277

>

>

>

>

>

>

DRAWN BY:

INV. 803.88

245

MH-02 60" MH

BARR

FLOW

1405 84" DIA MH

>

>

>

>

>

>

DESIGNED BY:

ENERGY DISSIPATION APRON, SEE

81

DRAWING NAME C-200.DWG

ST-114

HDS-02 96" DOWNSTREAM DEFENDER

2

0

30

ISSUED FOR CONSTRUCTION

60

SCALE IN FEET

MRM

>

CLEANOUT (TYP.) SEE 240

UPDATED PLANIMETRIC AND GRADING BY OTHERS

36" CL IV RCP

36" CL IV RCP

FES-05

0

RECONSTRUCT EXISTING CATCH BASIN FOR LARGER DIAMETER PIPES

App.

MH-04 144" BYPASS MANHOLE

803.5

>

>

>

>

810

804 806 808

>

.

PROPOSED SIDEWALK

>

>

FLOW

8" UNDERDRAIN CLEANOUT IE. 801.30

>

>

VD BL

15" CLIV RCP

>

8" SOLID PVC

>

>

ER

6

IV

80

R

15" CL IV RCP

>

>

PI

IP

SS

CB-07 60" CATCH BASIN W/ 60" HAALA GRATE

36" CL IV RCP

ST-47

>

ST-48

802 804 806 808

8" UNDERDRAIN CLEANOUT IE. 801.33

>

FES-04 >

>

ST-49

2

OUT-09 24" CPP

>

2

TP-1

>

>

800

>

6 80 0088 88

SI IS

M

OUT-07 SUBMERGED SKIMMER 15" CL IV RCP (IE. 799.0)

FLOW

798

>

239

AVENUE

798

1

240

BIOFILTRATION BASIN - B2 BOTTOM EL. 803.50 HWL = 807.97

>

3

>

NORTH POND - P2 BOTTOM EL. 797.00 NWL = 802.00 HWL = 807.96

2

FES-03

SUBMERGED RIPRAP APRON (MnDOT CL. III) SEE

800

IRON-ENHANCHED SAND TRENCH AND 8" UNDERDRAIN WITH CLEANOUTS (TYP.) SEE

804

>

3

239

ST-50

ST-3

808 806

BOHLAND

>

808 806 804 802

>

FLOW

>

36" CL IV RCP SUBMERGED RIPRAP APRON (MnDOT CL. III) SEE

>

OUT-08 24" CPP

>

100-YR. WSE (808.06) - SEE SHEET 218 FOR IMPERMEABLE LINER CONFIGURATION

07/01/2020 BULLETIN #2

>

>

BLOCK 5 (1.13 ACRES)

IRON-ENHANCHED SAND TRENCH AND 8" DIA. UNDERDRAIN WITH CLEANOUTS (TYP.) SEE

BIOFILTRATION BASIN - B1 BOTTOM EL. 804.50 HWL = 808.00

Revisions

SOIL BORING, SEE GEOTECH REPORT BY BRAUN INTERTEC

>

2

240

ST-01

>

FORD PARKWAY

>

>

1

245

ST-51

2

UNDERDRAIN AND SAND TRENCH WITH CLEANOUTS

ST-77

ENERGY DISSIPATION APRON, SEE

GATEWAY PARK (3.65 ACRES)

2

WATER HYDRANT

FES-01

ST-1

WATER VALVE

>

ST-2

>

808 806

CLEANOUT (TYP.) SEE

No. Date

WATER MANHOLE

WOODLAWN AVENUE

>

0

SANITARY MANHOLE

>

MH-01 120" BYPASS MANHOLE

>

42" CL IV RCP

81 PROPOSED SIDEWALK

>

2

STORM MANHOLE (DESIGN BY KIMLEY HORN)

>

INV. 805.25 42" CL IV RCP

81

PLAZA

>

>

>

>

>

>

>

1546 84" DIA MH

>

HDS-01 120" DOWNSTREAM DEFENDER

BARR ENGINEERING CO. 4300 MARKETPOINTE DRIVE Suite 200 MINNEAPOLIS, MN 55435 Ph: 1-800-632-2277 Fax: (952) 832-2601 www.barr.com

I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. PRINTED NAME

MATTHEW R. METZGER

SIGNATURE DATE

06/03/2020

LICENSE #

47651

RYAN COMPANIES US, INC. FORD SITE REDEVELOPMENT CITY OF ST PAUL, MINNESOTA PRELIMINARY SITE PLAN

STORM SEWER PLAN GATEWAY PARK OVERVIEW

200 522


>

> >

>

>

SEE

> >

SG-04 8'x18' STORMGATE VAULT

>

>

>

>

48" CL IV RCP

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

> FLOW

>

>

>

>

FLOW > >

>

>

>

>

>

>

>

>

806 80 4

48" CL IV RCP (2)

>

2

> > 15" CL IV RCP > >

CAST-IN-PLACE CONCRETE RETAINING WALL, SEE SHEET 231

2

OUT-01 PIPE INTEGRAL TO WALL IE. 807.0

>

6 80 8 80 0 81 2 81

CENTRAL WATER FEATURE - P1 BOTTOM ELEV. 802.00 NWL = 809.00 HWL = 813.37

3

834

806

FLOW

SUBMERGED RIPRAP APRON (MnDOT CL. III) SEE

JS-03 8'x22' JUNCTION STRUCTURE

CONCRETE PATH

2

>

ST-54

80

836

>

MH-05 96" BYPASS MANHOLE

SF-03 STORMFILTER WITH PHOSPHOSORB MEDIA

PLAZA

>

TRENCH BOX EXCAVATION LIMITS

>

1916 TYPE III MANHOLE

>

830

>

828 ST-18

ST-55

810 808

2

80

6

ST-19

810 FES-09 12 IE. 808.5 8

239

ST-53 CB-03 60" CATCH BASIN W/ 60" HAALA GRATE SEE

>

CLEANOUT (TYP.) SEE

2

>

>

>

814 812

ENERGY DISSIPATION APRON, SEE

2

PROPOSED SIDEWALK

>

>

>

>

818 >

>

>

>

>

ST-120

>

>

>

FALLS PASSAG E WEST >

>

MH-10 144" BYPASS MANHOLE >

>

>

>

>

>

1331 120"DIA MH

>

816

2

HDS-07 120" DOWNSTREAM DEFENDER

100-YR. WSE (814.10)

2

INV. 811.22

>

>

>

SANITARY MANHOLE

>

TP-40

2

812 814

1

245

27"x44" ARCH CL IVA RCP

>

>

>

>

>

FES-08

27"x44" ARCH CL IVA RCP

W

>

STORM MANHOLE (DESIGN BY KIMLEY HORN)

814

CENTRAL BIOFILTRATION BASIN - B3 BOTTOM ELEV. 811.00 HWL = 814.10 ST-62

OUT-10 24" CPP

240

6

>

>

STORM MANHOLE (DESIGN BY BARR)

1

240

4

81

WATER MAIN

IRON-ENHANCHED SAND TRENCH AND 8" DIA. UNDERDRAIN (TYP.) SEE

36" CL IV RCP

206

>

SANITARY SEWER

806 808

3

4

ST-56

806

SUBMERGED RIPRAP APRON (MnDOT CL. III) SEE

80

80

100-YR. WSE (813.5) - SEE SHEET 220 FOR IMPERMEABLE LINER CONFIGURATION

> STORM SEWER (DESIGN BY KIMLEY HORN)

812

>

TP-5

STORM SEWER (DESIGN BY BARR)

FLOW

814

239

83 2

>

>

BOHLAND AVENUE

>

>

>

LEGEND

>

ST-109

>

INV. 821.70

>

FL O

>

>

>

48" CL IV RCP

> FLOW

ST-8

ST-52

>

2

48" CL IV RCP

>

>

HILLCREST AVENUE

36" CL IV RCP

SG-03 8'x12' STORMGATE VAULT

>

2

FLOW

TRENCH BOX EXCAVTION LIMITS

BLOCK WALL

PLAZA

>

TP-6

HDS-05 96" DOWNSTREAM DEFENDER

>

>

ST-110

ST-111

36" CL IV RCP

>

>

MAINTENANCE ACCESS TO ST-03 SYSTEM FROM HILLCREST AVE.

CIVIC PLAZA

SF-06 STORMFILTER WITH PHOSPHOSORB MEDIA

15" CL IV RCP

FLOW

MH-30 96" MH

>

2

FLOW

ST-105

42" CL IV RCP

FLOW

>

>

>

SF-04 STORMFILTER WITH PHOSPHOSORB MEDIA

>

1

209

>

>

1

207

SEE

48" CL IV RCP (2)

HDS-08 120" DOWNSTREAM DEFENDER

>

MH-08 96" MH

ST-03 6'-0" STORMTRAP WITH 90' x 197' FOOTPRINT SEE

48" CL IV RCP

2

MH-31 108" MH

>

>

>

HDS-06B 120" DOWNSTREAM DEFENDER

>

>

>

>

>

>

>

>

>

>

>

>

>

> 820.37 INV. >

MH-06 10' x 12' BYPASS MANHOLE

>

>

>

>

>

ST-04B 5'-8" STORMTRAP - 232' L x VARIABLE WIDTH (5,527 SQ. FT. FOOTPRINT)

>

42" CL IV RCP

MH-32 108" MH

JS-04 96" DIA. JUNCTION STRUCTURE >

> >

>

>

INV. 813.18

>

>

1924 84" DIA MH

LOW-FLOW BASE FLOW DIVERSION PIPE FROM FORD PARKWAY, SEE SHEET 217

MH-09 120" BYPASS MANHOLE

>

>

>

SF-05 STORMFILTER WITH PHOSPHOSORB MEDIA

HDS-06A 120" DOWNSTREAM DEFENDER

>

> FLOW >

>

> >

ST-15

>

1 209 TP-13

WATER MANHOLE

UNDERDRAIN AND SAND TRENCH WITH CLEANOUTS

>

>

>

ST-01

SOIL BORING, SEE GEOTECH REPORT BY BRAUN INTERTEC

TP-1

TEST PIT, SEE GEOTECH REPORT BY BRAUN INTERTEC

>

>

>

>

>

>

>

>

>

>

>

No. Date 2

STORMWATER STRUCTURE WITH PERIMETER UNDERDRAIN PIPE

Revisions

07/01/2020 BULLETIN #2

>

>

FLOW >

WATER HYDRANT

>

ST-17

>

WATER VALVE

MATCH LINE - SEE SHEET 202

>

>

>

>

> > >

>

>

ST-04A 5'-8" STORMTRAP - 252' L x VARIABLE WIDTH (6,198 SQ. FT. FOOTPRINT)

ST-108

SHEET NOTES: 1. 2. 3. 4. 5. 6.

1

ST-03 PLAN AND PROFILE SEE SHEET 207. ST-04 PLAN AND PROFILE SEE SHEET 209. CENTRAL POND P1 AND BASIN B3 PLAN AND PROFILE SEE SHEETS 220, 221, AND 223. REFER TO PARK/CIVIC PLANS FOR SIDEWALK AND OTHER PROGRAMMING ELEMENT DESIGN. FOR RCP STORM SEWER TYPICAL DETAIL, SEE

MRM

0

DRAWN BY: CHECKED BY: DATE: PROJECT NO.

60

SCALE IN FEET 238

2

2

Project Office:

BARR EPF MRM 06/03/2020 23/62-1289.00

ISSUED FOR CONSTRUCTION

UPDATED PLANIMETRIC AND GRADING BY OTHERS

DRAWING NAME C-201.DWG DESIGNED BY:

30

4

TIE ALL JOINTS AT RCP PIPE OUTLETS, INCLUDING AT THE CONNECTION TO A FLARED END SECTION (OR APRON) AND BETWEEN THE FINAL TWO PIPE SECTIONS LOCATED UPSTREAM OF THE FLARED END SECTION (OR APRON). AT A MINIMUM, THE FIRST (3) PIPE JOINTS NEED TO BE TIED.

App.

PLAN: PROPOSED STORM SEWER, UNDERGROUND DETENTION ST-03, ST-04, WET POND P1, BIOFILTRATION BASIN B-3

-

Corporate Headquarters: Minneapolis, Minnesota Ph: 1-800-632-2277

BARR ENGINEERING CO. 4300 MARKETPOINTE DRIVE Suite 200 MINNEAPOLIS, MN 55435 Ph: 1-800-632-2277 Fax: (952) 832-2601 www.barr.com

I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. PRINTED NAME

MATTHEW R. METZGER

SIGNATURE DATE

06/03/2020

LICENSE #

47651

RYAN COMPANIES US, INC. FORD SITE REDEVELOPMENT CITY OF ST PAUL, MINNESOTA PRELIMINARY SITE PLAN

STORM SEWER PLAN CIVIC PLAZA OVERVIEW

201 522


>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

FLOW

239

SUBMERGED RIPRAP APRON (MnDOT CL. III) SEE 239

OUT-11 24" CPP

ENERGY DISSIPATION APRON, SEE

1

206

ST-119

812 814

CLEANOUT (TYP.) SEE

2

240

PAS LS FAL 6

TP-43

EST EW SAG

81

FES-11

W

>

27"x44" ARCH CL IVA RCP

WATER MAIN

EASEMENT (TYP.)

MH-13 120" BYPASS MANHOLE

>

FLO

SANITARY SEWER

100-YR. WSE (814.03)

>

27"x44" ARCH CL IVA RCP

STORM MANHOLE (DESIGN BY KIMLEY HORN)

>

>

HDS-10 96" DOWNSTREAM DEFENDER

PROPOSED ALLEY

>

1308 84" DIA MH

ST-34

>

1 -

>

>

PLAN: PROPOSED STORM SEWER, UNDERGROUND DETENTION ST-05, WET POND P1, BIOFILTRATION BASIN B3 0

30

60

>

T U >N

O >M

1. 2.

4. 5.

2

Revisions

07/01/2020 BULLETIN #2

App. MRM

DRAWING NAME C-202.DWG DESIGNED BY: DRAWN BY:

CHECKED BY: DATE:

PROJECT NO.

Project Office:

BARR EPF MRM 06/03/2020 23/62-1289.00

Corporate Headquarters: Minneapolis, Minnesota Ph: 1-800-632-2277

BARR ENGINEERING CO. 4300 MARKETPOINTE DRIVE Suite 200 MINNEAPOLIS, MN 55435 Ph: 1-800-632-2277 Fax: (952) 832-2601 www.barr.com

I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. PRINTED NAME

MATTHEW R. METZGER

06/03/2020

.>

LVD E B>

>

>

WATER VALVE WATER HYDRANT

> ST-35

UNDERDRAIN AND SAND TRENCH WITH CLEANOUTS

UR>V >C

ST-01

SOIL BORING, SEE GEOTECH REPORT BY BRAUN INTERTEC

TP-1

TEST PIT, SEE GEOTECH REPORT BY BRAUN INTERTEC

>

>

>

>

>

>

>

>

>

>

>

>

ST-05 PLAN AND PROFILE SEE SHEET 211. CENTRAL POND AND BASIN B3 PLAN AND PROFILE SEE SHEETS 220, 221, AND 223. REFER TO PARK/CIVIC PLANS FOR SIDEWALK AND OTHER PROGRAMMING ELEMENT DESIGN. FOR RCP STORM SEWER TYPICAL DETAIL, SEE TIE ALL JOINTS AT RCP PIPE OUTLETS, INCLUDING AT THE CONNECTION TO A FLARED END SECTION (OR APRON) AND BETWEEN THE FINAL TWO PIPE SECTIONS LOCATED UPSTREAM OF THE FLARED END SECTION (OR APRON). AT A MINIMUM, THE FIRST (3) PIPE JOINTS NEED TO BE TIED.

LICENSE #

47651

STORMWATER STRUCTURE WITH PERIMETER UNDERDRAIN PIPE

4

238

2

ISSUED FOR CONSTRUCTION

RYAN COMPANIES US, INC. FORD SITE REDEVELOPMENT CITY OF ST PAUL, MINNESOTA PRELIMINARY SITE PLAN

STORM SEWER PLAN

SIGNATURE DATE

>

>

WATER MANHOLE

>

SHEET NOTES:

3.

UPDATED PLANIMETRIC AND GRADING BY OTHERS

>

>

>

>

>

>

>

>

>

>

>

>

>

ST-88

>

>

>

>

>

>

>

>

ST-27

>

>

>

>

SANITARY MANHOLE

>

>

>

INV. 811.16

MATCH LINE - SEE SHEET 201

STORM MANHOLE (DESIGN BY BARR)

>

2

2

SCALE IN FEET

No. Date

STORM SEWER (DESIGN BY KIMLEY HORN)

>

240

2

STORM SEWER (DESIGN BY BARR)

>

2

816

LEGEND

>

CLEANOUT (TYP.) SEE

1

ST-29

>

BIOFILTRATION BASIN - B4 BOTTOM ELEV. 811.00 HWL = 813.99 OVERFLOW ELEV. 813.75

ST-63

PROPOSED SIDEWALK

240

814

4

ST-6

812 814

240

>

812

808 81 0 2

1

0 81 2 81 4 81 4 81 2 81

2

245

806

IRON-ENHANCHED SAND TRENCH AND 8" DIA. UNDERDRAIN (TYP.) SEE

8 80

CB-04 60" CATCH BASIN W/ 60" HAALA GRATE SEE

FLOW >

806

810 812

6 80

36" CL IV RCP

804 808

4

80

802

804

FES-12 IE. 808.5

3

ST-58

802

CAST-IN-PLACE CONCRETE RETAINING WALL, SEE SHEET 231

TP-37

2

24" CL IV RCP

>

804

3

CENTRAL WATERST-59 FEATURE - P1 BOTTOM ELEV. 802.00 NWL = 809.00 HWL = 813.37

FES-20 IE. 804.00

>

>

>

>

E BRIDG S) HER (BY OT

SUBMERGED RIPRAP APRON (MnDOT CL. III) SEE

ST-60

FLOW

CONCRETE PATH

>

>

>

>

>

FLOW

MATCH LINE - SEE SHEET 203

>

>

> PROPOSED SIDEWALK

>

FLOW TO HIDDEN FALLS CREEK

>

>

>

2

OUT-03 PIPE INTEGRAL TO WALL IE. 807.0

2

IRON-ENHANCHED SAND TRENCH AND 8" DIA. UNDERDRAIN (TYP.) SEE

>

>

> >

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

ST-28

>

>

>

>

>

>

>

>

31" x 51" CL IVA ARCH RCP (ENCASE WITH CLSM)

>

>

>

TP-36

ST-57

802

66" CL IV RCP

MH-34 48" MH

>

>

> ST-61

>

>

>

>

>

>

>

>

>

>

>

>

ST-104

15" CL IV RCP > > >

>

>

>

>

2

30" CL IV RCP

2

OUT-04 9 X OVERFLOW WEIR SEE SHEET 222

HDS-11 120" DOWNSTREAM DEFENDER

>

>

>

MH-11 120" BYPASS MANHOLEMH-12 96" MH

ST-103

36" CL IV RCP

FLOW

42" CL IV RCP

>

TP-41

>

36" CL IV RCP >

>

42" CL IV RCP

MH-14 120" BYPASS MANHOLE

INV. 813.28 >

>

SG-05 8'x12" STORMGATE VAULT

TRENCH BOX EXCAVATION LIMITS

>

HDS-09 120" DOWNSTREAM DEFENDER

>

SF-07 STORMFILTER WITH PHOSPHOSORB MEDIA

1706 108" DIA MH

FLOW

>

INV. 813.71

211

>

FLOW

JS-05 96" DIA. JUNCTION STRUCTURE

>

>

1840 TYPE V MANHOLE

>

ST-05 5'-8" STORMTRAP - 300' L x VARIABLE WIDTH (7,021 SQ. FT. FOOTPRINT) SEE 1

SAUNDERS AVE.

>

ST-9

>

>

>

>

>

2

VILLAGE WAY

>

CENTRAL WATER FEATURE OVERVIEW

202 522


REMOVE AND REPLACE EXISTING 48" RCP TO DRAIN TO HIDDEN FALLS BY GRAVITY

W >

2

>

>

>

TEST PIT, SEE GEOTECH REPORT BY BRAUN INTERTEC

>

F L OW

>

>

1

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

OUT-06 HIDDEN FALLS CREEK OUTLET PIPE INTERGAL TO WALL IE. 790.0 ST-70

FES-21 2 IE. 790.00

ST-95

HIDDEN FALLS CREEK FEATURE HWL 803.07

TRENCH BOX EXCAVATION LIMITS

>

CB-06 60" CATCH BASIN W/ 60" HAALA GRATE SEE

OW

FL

4

ST-124

2

206

OUT-13 24" CPP 24" CL IV RCP

CLEANOUT (TYP.) SEE

2

2

240

802 800 798

799.50 799.50

>

>

>

>

>

>

>

7890 8

>

>

> > > >

>

>

>

>

>

1

FES-15

>

> PROPOSED SIDEWALK

804

>

>

>

802

>

245

>

>

ENERGY DISSIPATION APRON, SEE

800

>

MH-22 144" BYPASS MANHOLE

> >

> >

>

>

>

UPDATED PLANIMETRIC AND GRADING BY OTHERS

>

>

>

NUE

>

2

>

>

>

> >

>

HDS-13 144" DOWNSTREAM DEFENDER

AVE

>

-

>

1

PLAN: PROPOSED STORM SEWER, UNDERGROUND DETENTION ST-06, BIOFILTRATION BASIN B5 >

>

>

OW

>

>

>

> >

FL

>

>

>

>

App. MRM

DRAWING NAME C-203.DWG DESIGNED BY:

DRAWN BY: CHECKED BY: DATE: PROJECT NO.

> Project Office:

BARR EPF MRM 06/03/2020 23/62-1289.00

0

30 SCALE IN FEET

60

>

>

Corporate Headquarters: Minneapolis, Minnesota Ph: 1-800-632-2277

BARR ENGINEERING CO. 4300 MARKETPOINTE DRIVE Suite 200 MINNEAPOLIS, MN 55435 Ph: 1-800-632-2277 Fax: (952) 832-2601 www.barr.com

I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. PRINTED NAME

MATTHEW R. METZGER

DATE

06/03/2020

RYAN COMPANIES US, INC. FORD SITE REDEVELOPMENT CITY OF ST PAUL, MINNESOTA PRELIMINARY SITE PLAN

STORM SEWER PLAN

SIGNATURE LICENSE #

47651

>

ISSUED FOR CONSTRUCTION >

>

PROPOSED SIDEWALK

MAINTENANCE ACCESS TO HDS-14 FROM YORKSHIRE AVE.

IRE

215

MAINTENANCE ACCESS TO HDS-13, HIDDEN FALLS CREEK FEATURE VIA RECREATIONAL TRAIL

60" CL IV RCP

ST-64

1037 TYPE III MANHOLE

>

>

>

>

>

>

>

798

KSH

>

ST-07 5'-8" STORMTRAP WITH 48' x 121' FOOTPRINT 1 SEE

INV. 799.05

>

>

>

>

>

ST-65

>

MATCH LINE - SEE SHEET 202

ST-93

YOR

BYPASS CHANNEL ROW

07/01/2020 BULLETIN #2

MAINTENANCE ACCESS TO HDS-15 FROM MOUNT CURVE BLVD.

ST-91

36" CL IV RCP

W

>

Revisions

D.

BLV

>

>

HDS-14 96" DOWNSTREAM DEFENDER FLO

>

>

No. Date

42" CL IV RCP

ST-29

>

2 81

>

>

>

>

>

>

>

>

>

>

>

>

>

>

SF-10 STORMFILTER WITH PHOSPHOSORB MEDIA

VE TP-25CUR T N U MO

2 MH-23 120" BYPASS MANHOLE

36" CL IV RCP

802 800 798

240

>

>

>

FES-17 IE. 797.50

>

>

>

>

1

>

>

>

SG-07 8'x12' STORMGATE VAULT

FES-26 IE. 794.00

>

>

>

>

>

ST-31

240

245

IRON-ENHANCHED SAND TRENCH AND 8"DIA. UNDERDRAIN (TYP.) SEE

1020 TYPE V MANHOLE

1

1

>

>

IRON-ENHANCHED SAND TRENCH AND 8"DIA. UNDERDRAIN (TYP.) SEE

ENERGY DISSIPATION APRON, SEE

4 792 7942

HDS-15 96" DOWNSTREAM DEFENDER ST-69

W

>

>

FLOW >

798 800 802

2

FLO

>

TP-37

FLOW

2

30" CL IV RCP

BIOFILTRATION BASIN - B5 BOTTOM EL. 797.50 HWL = 803.01 OVERFLOW ELEV. 800.00

>

>

>

>

>

>

FES-14 IE. 795.00

JS-08 96" JUNCTION STRUCTURE

OUT-05 IE. 803.0 OUTFALL (BY OTHERS)

2

>

>

>

>

JS-07 8'x14.25' SKIMMER STRUCTURE

18" CL IV RCP > > >

BITUMINOUS TRAIL

802 80 0

36" CL IV RCP INV. 798.32

OUT-12 24" CPP

ST-66

48" CL IV RCP

66" CL IV RCP

36" CL IV RCP

24" CL IV RCP

206

ST-94

2

4

FES-18 IE. 797.50

>

>

>

>

>

>

>

>

SEE

MH-24 120" BYPASS MANHOLE

1

245

>

>

>

>

>

JS-06 2 108" DIA. JUNCTION STRUCTURE FLOW

FES-19 IE. 792.00

CB-05 60" CATCH BASIN W/ 60" HAALA GRATE

>

> >

>

>

MH-21 108" MH

ENERGY DISSIPATION APRON, SEE

>

>

>

>

>

>

>

2

PARK C HIDDEN FALLS HEADWATER FEATURE (6.39 ACRES)

>

>

>

>

>

>

8 79 800 98 7

>

>

>

GRAVEL TRAIL

>

TP-26

ST-68

SG-06 8'x18' STORMGATE VAULT SF-08 STORMFILTER WITH PHOSPHOSORB MEDIA

>

>

>

>

>

PEDESTRIAN BRIDGE

>

812 814

>

>

UE >

799.50

>

>

814

48" CL IV RCP

>

MH-19 > 96" MH >

> > > 48" CL IV RCP

> ST-61

ST-71

>

>

VEN

SF-09 STORMFILTER WITH PHOSPHOSORB MEDIA

2

>

>

>

AL A

E NTR

> 48" CL IV RCP

MH-18 > > 120" MH

>

>

>

MO

>

60" CL IV>RCP

>

BYPASS CHANNEL ROW

48" CL IV RCP

PROPOSED SIDEWALK

100-YR. WSE (803.1) - SEE SHEET 224 FOR IMPERMEABLE LINER CONFIGURATION

>

>

>

213

MAINTENANCE ACCESS TO HIDDEN FALLS CREEK FEATURE VIA RECREATIONAL TRAIL

>

2

STORMWATER STRUCTURE WITH PERIMETER UNDERDRAIN PIPE

>

>

>

>

>

>

>

TP-1

>

>

> >

SOIL BORING, SEE GEOTECH REPORT BY BRAUN INTERTEC

>

ST-01

>

2

. VD

>

>

ST-06 5'-8" STORMTRAP WITH 65' x 168' FOOTPRINT SEE

48" CL IV RCP

BL

>

>

>

JS-09 8'x14.25' SKIMMER STRUCTURE

UNDERDRAIN AND SAND TRENCH WITH CLEANOUTS

>

>

WATER HYDRANT

MH-25 84" MH

R VE RI PI

>

>

ST-11

ST-67

>

>

WATER VALVE

MAINTENANCE ACCESS TO ST-06 SYSTEM FROM MONTREAL AVE.

2 48" CL IV RCP

P SI IS

WATER MANHOLE

HDS-12A 120" DOWNSTREAM DEFENDER

>

> >

4

238

S IS

SANITARY MANHOLE

TIE ALL JOINTS AT RCO PIPE OUTLETS, INCLUDING AT THE CONNECTION TO A FLARED END SECTION (OR APRON) AND BETWEEN THE FINAL TWO PIPE SECTIONS LOCATED UPSTREAM OF THE FLARED END SECTION (OR APRON). AT A MINIMUM, THE FIRST (3) PIPE JOINTS NEED TO BE TIED.

MH-26 84" MH

>

7.

EN

M

>

>

HDS-12B 120" DOWNSTREAM DEFENDER

60" CL IV RCP

STORM MANHOLE (DESIGN BY BARR) STORM MANHOLE (DESIGN BY KIMLEY HORN)

MH-20 10' x 12' BYPASS MANHOLE

>

60" CL IV RCP

6.

48" CL IV RCP

>

FLO

INV. 805.74

WATER MAIN

2

> FLO W >

>

>

SANITARY SEWER

4. 5.

ST-06 PLAN AND PROFILE SEE SHEET 213. ST-07 PLAN AND PROFILE SEE SHEET 215 HIDDEN FALLS CREEK FEATURES SEE SHEETS 224, 225 AND 226. BASIN B5 PLAN AND PROFILE SEE SHEET 224. REFER TO PARK/CIVIC PLANS FOR SIDEWALK AND OTHER PROGRAMMING ELEMENT DESIGN. FOR TYPICAL RCP STORM SEWER DETAIL, SEE

>

STORM SEWER (DESIGN BY KIMLEY HORN)

1. 2. 3.

>

>

HIDD FLOW TO FALLS

MH-27 120" MH FIELD VERIFY

>

>

>

>

>

>

STORM SEWER (DESIGN BY BARR)

1601 108" DIA MH >

SHEET NOTES:

>

>

LEGEND

HIDDEN FALLS CREEK OVERVIEW

203 522


Capitol Region Watershed District

Permit 20-017 Hamm's Brewery Stormwater Improvements

Applicant:

Andrew Hestness Consultant: TJ Rose City of Saint Paul Department of Planning and Larson Engineering, Inc Economic Development 3524 Labore Road 25 West Fourth Street, 1300 City Hall Annex White Bear Lake, MN 55110 Saint Paul, MN 55102 Description: This project will consist of the construction of a new underground stormwater system and reconstruction of the existing drive between 2 existing buildings. This path will be converted into a pedestrian walkway with vehicle access for deliveries. Stormwater Management: One underground infiltration system. District Rule: —C D F Disturbed Area: 1.2 Acres Impervious Area: 1.248 Acres STAFF RECOMMENDATION: Approve with 3 Conditions: 1. Clarify who will be responsible for long-term maintenance of the underground infiltration system. CRWD understands that the City of St. Paul has a memorandum of agreement with CRWD for maintenance, but a maintenance agreement shall be provided and recorded with Ramsey County if long-term maintenance will be provided by a private entity. 2. Provide a copy of the NPDES permit. 3. Demonstrate that the proposed pretreatment design will not negatively impact the hydraulic function of the underground system: a. The 6-ft of 15” HDPE with an invert of 128.12’ connecting STMH-3 and the pretreatment row will always be full of water. b. The 26-ft of 15” PVC connecting CB-5 and STMH-3 will always be partially full of water.

First Street Second Ave

Permit Location Permit Report 20-017

Aerial Photo Board Meeting Date: 07/08/2020


Capitol Region Watershed District Permit Report CRWD Permit #:

20-017

Review date:

June 30, 2020

Project Name:

Hamm's Brewery Stormwater Improvements

Applicant:

Andrew Hestness City of Saint Paul Department of Planning and Economic Development 25 West Fourth Street, 1300 City Hall Annex Saint Paul, MN 55102 651-266-6577 Andrew.Hestness@ci.stpaul.mn.us

Purpose:

This project consists of the reconstruction of a drive between two existing buildings. This path will be converted into a pedestrian walkway with vehicle access for deliveries. Permanent stormwater management consists of an underground infiltration system.

Location:

694 Minnehaha Ave E, Saint Paul, MN

Applicable Rules:

C, D, and F

Recommendation:

Approve with 3 Conditions

EXHIBITS: 1. Revised Civil Plans (Title Sheet, Sheets C100, C200, C300, C400, C500, C501, L100, L200, L300), by Larson Engineering, dated 6/23/2020, recv. 5/28/2020. 2. Revised Stormwater Calculations, by Larson Engineering, dated 6/23/2020, recv. 6/23/2020. 3. Geotechnical Evaluation Report, by Braun Intertec, dated 3/10/2020, recv. 5/28/2020. 4. SWPPP Template for Small Construction Sites, by Larson Engineering, not dated, recv. 6/23/2020. HISTORY & CONSIDERATIONS: Stormwater management installed during this phase of the project is intended to satisfy water quality requirements as part of a larger redevelopment project taking place on the property. Multiple phases of redevelopment projects have occurred in recent years at the site. Projects being accounted for with the proposed infiltration system include Phase 1, building demolition, fire lane extension, and the current 2020 project for a total new/reconstructed impervious area of 54,360 ft2.

W:\07 Programs\Permitting\2020\20-017 Hamm's Brewery improvements\20-017 Permit Report_R2.doc Page 1 of 4


RULE C: STORMWATER MANAGEMENT Standards  Proposed discharge rates for the 2-, 10-, and 100-year events shall not exceed existing rates.  Developments and redevelopments must reduce runoff volumes in the amount equivalent to an inch of runoff from the impervious areas of the site.  Stormwater must be pretreated before discharging to infiltration areas to maintain the long-term viability of the infiltration area.  Developments and redevelopments must incorporate effective non-point source pollution reduction BMPs to achieve 90% total suspended solid removal. Findings 1. A hydrograph method based on sound hydrologic theory is used to analyze runoff for the design or analysis of flows and water levels. 2. Runoff rates for the proposed activity do not exceed existing runoff rates for the 2-, 10-, and 100-year critical storm events. Stormwater leaving the project area is discharged into a well-defined receiving channel or pipe and routed to a public drainage system. 3. Stormwater runoff volume retention is achieved onsite in the amount equivalent to the runoff generated from 1.1-inch of rainfall over the impervious surfaces of the development. a. The amount of proposed impervious is 54,360 ft2. i. Phase 1 – Approximately 23,600 ft2 ii. Building Demolition – Approximately 7,000 ft2 iii. Fire Lane Extension – Approximately 7,500 ft2 iv. Current 2020 Project – Approximately 16,260 ft2 b. Volume retention required: 54,360 ft2 x 1.1 inches x 1 ft/12 inches = 4,983 ft3 Table 1. Proposed volume retention through abstraction (i.e. infiltration, reuse). Volume 2.5-inch Volume Retention 1.1-inch Retention Runoff Runoff BMP Provided below Required 3 3 ) (ft ) (ft3) outlet (ft (ft3) Underground Infiltration 6,109 3,524 8,009 4,983 Total 6,109 c. Banking of excess volume retention of is not proposed. d. Infiltration volume and facility size has been calculated using the appropriate hydrologic soil group classification and design infiltration rate. e. The infiltration area is capable of infiltrating the required volume within 48 hours. f. Stormwater runoff is pretreated to remove solids before discharging to infiltration areas. g. Groundwater mounding is not anticipated to affect adjacent properties and buildings. 4. Alternative compliance sequencing has not been requested.

W:\07 Programs\Permitting\2020\20-017 Hamm's Brewery improvements\20-017 Permit Report_R2.doc Page 2 of 4


5. Best management practices achieve 90% total suspended solids removal from the runoff generated on an annual basis. 6. A maintenance agreement recorded with Ramsey County has not been submitted. 7. Adequate maintenance access is provided for the underground system. A sitespecific plan, schedule, and narrative for maintenance of the proposed stormwater management practices has not been submitted. RULE D: FLOOD CONTROL Standards  Compensatory storage shall be provided for fill placed within the 100-year floodplain.  All habitable buildings, roads, and parking structures on or adjacent to a project site shall comply with District freeboard requirements. Findings 1. There is no floodplain on the property according to FEMA. 2. All habitable buildings, roads, and parking structures on or adjacent to the project site comply with CRWD freeboard requirements. RULE E: WETLAND MANAGEMENT Standard  Wetlands shall not be drained, filled (wholly or in part), excavated, or have sustaining hydrology impacted such that there will be a decrease in the inherent (existing) functions and values of the wetland.  A minimum buffer of 25 feet of permanent nonimpacted vegetative ground cover abutting and surrounding a wetland is required. Findings 1. There are no known wetlands located on the property. RULE F: EROSION AND SEDIMENT CONTROL Standards  A plan shall demonstrate that appropriate erosion and sediment control measures protect downstream water bodies from the effects of a land-disturbing activity.  Erosion Control Plans must adhere to the MPCA Protecting Water Quality in Urban Areas Manual. Findings 1. Erosion and sediment control measures are consistent with best management practices, as demonstrated in the MPCA manual Protecting Water Quality in Urban Areas. 2. Adjacent properties are protected from sediment transport/deposition. 3. Wetlands, waterbodies and water conveyance systems are protected from erosion/sediment transport/deposition. 4. Total disturbed area is 1.2 acres; an NPDES permit is required. A SWPPP has been submitted. RULE G: ILLICIT DISCHARGE AND CONNECTION W:\07 Programs\Permitting\2020\20-017 Hamm's Brewery improvements\20-017 Permit Report_R2.doc Page 3 of 4


Standard  Stormwater management and utility plans shall indicate all existing and proposed connections from developed and undeveloped lands for all water that drains to the District MS4. Findings 1. New direct connections or replacement of existing connections are not proposed. 2. Prohibited discharges are not proposed. Recommendation: Approve with 3 Conditions Conditions: 1. Clarify who will be responsible for long-term maintenance of the underground infiltration system. CRWD understands that the City of St. Paul has a memorandum of agreement with CRWD for maintenance, but a maintenance agreement shall be provided and recorded with Ramsey County if long-term maintenance will be provided by a private entity. 2. Provide a copy of the NPDES permit. 3. Demonstrate that the proposed pretreatment design will not negatively impact the hydraulic function of the underground system: a. The 6-ft of 15” HDPE with an invert of 128.12’ connecting STMH-3 and the pretreatment row will always be full of water. b. The 26-ft of 15” PVC connecting CB-5 and STMH-3 will always be partially full of water.

W:\07 Programs\Permitting\2020\20-017 Hamm's Brewery improvements\20-017 Permit Report_R2.doc Page 4 of 4


12" PEP ST S

CURB INLET FLARED END

STREET

NEHAHA

SANITARY MANHOLERCP " 33 GATE VALVE & BOX

LIGHT POLE

48" RCP ST S

30"

RC

P

CITY OF SAINT PAUL

All service connections shall be performed in accordance with state and local standard specifications for construction. Utility connections (sanitary sewer, watermain, and storm sewer) may require a permit from the City.

24" PVC

STMH-1 RIM = 137.00 TOP WEIR = 131.00 6" ORIFICE = 129.90 INV (S) = 128.43

ST S

8" DIP W (P)

30" Ø ACCESS RISER RIM = 138.15

3.

The contractor shall verify the elevations at proposed connections to existing utilities prior to any demolition or excavation.

4.

The contractor shall notify all appropriate engineering departments and utility companies 72 hours prior to construction. All necessary precautions shall be made to avoid damage to existing utilities.

5.

Storm sewer requires testing in accordance with Minnesota plumbing code 4714.1109 where located within 10 feet of waterlines or the building.

74 LF 15" HDPE @ 1.0%

(STOCK HOUSE NO. 3)

OVER-EXCAVATE APPROXIMATELY 4' TO REACH SP-SM SOILS AND BACKFILL WITH AMENDED SOIL MEDIA. (OVER-EXCAVATION LIMITS ARE APPROXIMATELY THE NORTHERN-MOST 110 FEET OF THE SYSTEM)

6.

HDPE storm sewer piping shall meet ASTM F2306 and fittings shall meet ASTM D3212 joint pressure test. Installation shall meet ASTM C2321.

7.

All RCP pipe shown on the plans shall be MN/DOT class 3.

STMH-2 RIM = 135.25 INV (N/W/S) = 127.69

8.

Maintain a minimum of 7 ½' of cover over all water lines and sanitary sewer lines. Where 7 ½' of cover is not provided, install 2” rigid polystyrene insulation (MN/DOT 3760) with a thermal resistance of at least 5 and a compressive strength of at least 25 psi. Insulation shall be 8' wide, centered over pipe with 6” sand cushion between pipe and insulation. Where depth is less than 5', use 4” of insulation.

9.

Install water lines 12” above sewers. Where the sewer is less than 12" below the water line (or above), install sewer piping of materials approved for inside building use for 10 feet on each side of the crossing.

8 LF 12" PVC SCH 40 @ 3.0% CB-3 RIM = 131.84 INV = 126.68

CB-1 RIM = 129.45 INV = 125.72

CB-4 RIM = 133.00 INV = 130.90

WYE INV = 127.25

10. All watermain piping shall be class 52 ductile iron pipe unless noted otherwise.

18" PVC

125 LF 15" PVC SCH 40 @ 1.0%

72 LF 15" PVC SCH 40 @ 1.0%

NO VISIBLE PIPES

22 LF 15" PVC SCH 40 @ 1.0%

CB-2 RIM = 130.47 INV = 126.44

11. See Project Specifications for bedding requirements.

38 LF 15" HDPE @ 6.7%

12. Pressure test and disinfect all new watermains in accordance with state and local requirements. 13. Sanitary sewer piping shall be PVC, SDR-35 for depths less than 12', PVC SDR-26 for depths between 12' and 26', and class 52 D.I.P. for depths of 26' or more.

28 LF 8" PVC SCH 40 @ 8.0%

14. A structure adjustment shall include removing and salvaging the existing casting assembly, removing existing concrete rings to the precast section. Install new rings and salvaged casting to proposed grades, cleaning casting flange by mechanical means to insure a sound surface and install an external chimney seal from casting to precast section. Chimney seals shall be Infi-Shield Uni-Band or an approved equal.

3 LF 15" PVC SCH 40 @ 2.0%

CONNECT TO EXISTING CATCH BASIN INV = 125.5*

48" PERFORATED HDPE SYSTEM TOTAL VOLUME = 15,580 CF INFILTRATION VOL. = 6,519 CF 100-YR HWL = 131.96 PIPE INV = 128.00 STONE INV = 127.50

INLINE DRAIN RIM = 132.50 INV (N) = 129.50

25 LF 8" PVC SCH 40 @ 10.0%

2 STORY BRICK BUILDING (11 WELLS DISTILLERY)

CONNECT TO EXIST. 8" PVC INV = 132.00*

STMH-3 RIM = 135.25 TOP WEIR = 132.00 (EOF) INV (N/W) = 130.25 INV (S) = 128.12 SUMP = 123.12

CB-5 RIM = 133.00 INV = 130.77

15 W KELLOGG BLVD SAINT PAUL, MN 55102

2.

HAMM'S BREWERY STORMWATER IMPROVEMENTS

12" RCP

4 LF 15" HDPE @ 1.0%

Client:

It is the responsibility of the contractor to perform or coordinate all necessary utility connections and relocations from existing utility locations to the proposed building, as well as to all onsite amenities. These connections include but are not limited to water, sanitary sewer, cable TV, telephone, gas, electric, site lighting, etc.

Project Title:

1.

PRELIMINARY NOT FOR CONSTRUCTION

24" PVC

30" RCP ST S

CP "R

15

12" RCP

UTILITY NOTES

12" RCP

5 STORY BRICK BUILDING

P

12" CIP W

WATER SHUTOFF

12" CIP W

12" DIP

8"

S

HYDRANT

60" RCP

VC

ST

C 2020 Larson Engineering, Inc. All rights reserved.

33" RCP ST S

3524 Labore Road White Bear Lake, MN 55110 651.481.9120 (f) 651.481.9201 www.larsonengr.com

CATCH BASIN

CABLE UNDERGROUND LINE ELECTRIC OVERHEAD LINE ELECTRIC UNDERGROUND LINE FIBER OPTIC UNDERGROUND LINE NATURAL GAS UNDERGROUND LINE SANITARY SEWER PIPE STORM SEWER PIPE TELEPHONE UNDERGROUND LINE WATERMAIN PIPE DRAINTILE PIPE

Larson

STORM MANHOLE

Engineering, Inc.

LEGEND

I hereby certify that this plan, specifications or report was prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the state of Minnesota.

26 LF 15" PVC SCH 40 @ 2.0% PRE-TREATMENT ROW 15" HDPE INV = 130.50

6 LF 15" HDPE @ 2.0%

T.J. Rose, P.E. Date: 06.23.20

30" Ø ACCESS RISER RIM = 136.67

Rev.

Lic. No.:

Date

53681

Description

Project #:

12196139.000

Drawn By:

TJR

Checked By: MJW Issue Date:

06.23.20

Sheet Title:

BEECH P:\Projects\Projects - 2019\12196139 - Hamm's Brewery Stormwater Improvements\C. Design\Drawing Files\12196139 C400 - Utility.dwg

UTILITY PLAN

STREET

NORTH

C400

Sheet:

0

10

20

40


EXISTING SUBGRADE SOIL

All exposed soil areas must be stabilized as soon as possible to limit soil erosion but in no case later than 14 days after the construction activity in that portion of the site has temporarily or permanently ceased. Temporary stockpiles without significant silt, clay or organic components (e.g., clean aggregate stockpiles, demolition concrete stockpiles, sand stockpiles) and the constructed base components of roads, parking lots and similar surfaces are exempt from this requirement. The normal wetted perimeter of any temporary or permanent drainage ditch or swale that drains water from any portion of the construction site, or diverts water around the site, must be stabilized within 200 lineal feet from the property edge, or from the point of discharge into any surface water. Stabilization of the last 200 lineal feet must be completed within 24 hours after connecting to a surface water. Stabilization of the remaining portions of any temporary or permanent ditches or swales must be complete within 14 days after connecting to a surface water and construction in that portion of the ditch has temporarily or permanently ceased. Pipe outlets must be provided with energy dissipation within 24 hours of connection to surface water.

HEAVY-DUTY BITUMINOUS PAVEMENT SECTION

1 C500

NOT TO SCALE

8"

BACKFILL WITH NEW GOOD QUALITY TOPSOIL AND SEED

6"

12" WIRE MESH REINFORCEMENT (HIGH FLOW AREAS)

"

R3

ENGINEERING FABRIC

NEW BITUMINOUS PAVEMENT

SLOPE 3 " PER FT. 4

METAL, WOOD POST, OR STAKE. 8' MAX. SPACING, 2' INTO GROUND. FABRIC ANCHORAGE TRENCH. BACKFILL WITH TAMPED NATURAL SOIL

6"

6"

13. In areas where concentrated flows occur (such as swales and areas in front of storm catch basins and intakes) the erosion control facilities shall be backed by stabilization structure to protect those facilities from the concentrated flows.

12"

NEW BITUMINOUS PAVEMENT

SLOPE 3 " PER FT. 4

ELEV = SEE GRADING PLAN 7" 1.125"

6"

3 C500

1.5'

EXISTING SUBGRADE SOIL

1.5' PRE-TREATMENT ROW

SURMOUNTABLE CURB & GUTTER DETAIL

I hereby certify that this plan, specifications or report was prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the state of Minnesota.

48" PERFORATED HDPE PIPE INV = 128.00

T.J. Rose, P.E. Date: 06.23.20

WRAP PRE-TREATMENT ROW WITH WOVEN GEOTEXTILE FABRIC

NOT TO SCALE

Rev.

Lic. No.:

Date

53681

Description

INV = 128.00 INV = 127.50 12"

24. Upon completion of the project and stabilization of all graded areas, all temporary erosion control facilities (silt fences, hay bales, etc.) shall be removed from the site.

12"

SLOPE

3

4"

PER FT.

EXISTING SUBGRADE SOIL 7"

25. All permanent sedimentation basins must be restored to their design condition immediately following stabilization of the site. 26. Contractor shall submit Notice of Termination for MPCA-NPDES permit within 30 days after Final Stabilization.

NEW BASE AGGREGATE

4 C500

P:\Projects\Projects - 2019\12196139 - Hamm's Brewery Stormwater Improvements\C. Design\Drawing Files\12196139 C500 - Details.dwg

APPROVED, CLEAN BACKFILL DEPTH AND COMPACTION PER PIPE MANUFACTURER'S RECOMMENDATION

NEW BASE AGGREGATE

21. Oil, gasoline, paint and any hazardous substances must be properly stored, including secondary containment, to prevent spills, leaks or other discharge. Restricted access to storage areas must be provided to prevent vandalism. Storage and disposal of hazardous waste must be in compliance with MPCA regulations.

23. All liquid and solid wastes generated by concrete washout operations must be contained in a leak-proof containment facility or impermeable liner. A compacted clay liner that does not allow washout liquids to enter ground water is considered an impermeable liner. The liquid and solid wastes must not contact the ground, and there must not be runoff from the concrete washout operations or areas. Liquid and solid wastes must be disposed of properly and in compliance with MPCA regulations. A sign must be installed adjacent to each washout facility to inform concrete equipment operators to utilize the proper facilities.

NOT TO SCALE

NEW BITUMINOUS PAVEMENT

20. Collected sediment, asphalt and concrete millings, floating debris, paper, plastic, fabric, construction and demolition debris and other wastes must be disposed of properly and must comply with MPCA disposal requirements.

22. External washing of trucks and other construction vehicles must be limited to a defined area of the site. Runoff must be contained and waste properly disposed of. No engine degreasing is allowed onsite.

SILT FENCE INSTALLATION DETAIL

12"

10.75"

19. Temporary soil stockpiles must have silt fence or other effective sediment controls, and cannot be placed in surface waters, including stormwater conveyances such as curb and gutter systems, or conduits and ditches unless there is a bypass in place for the stormwater.

6 C500

6"

18. All infiltration areas must be inspected to ensure that no sediment from ongoing construction activity is reaching the infiltration area and these areas are protected from compaction due to construction equipment driving across the infiltration area.

NOTE: DEPENDING UPON CONFIGURATION, ATTACH FABRIC TO WIRE MESH WITH HOG RINGS, STEEL POSTS WITH WIRES, OR WOOD POSTS WITH STAPLES.

NOT TO SCALE

BACKFILL WITH NEW GOOD QUALITY TOPSOIL AND SEED

NOT TO SCALE

NATURAL SOIL

EXISTING SUBGRADE SOIL

B612 CONCRETE CURB & GUTTER DETAIL

2 C500

15. All silt fences must be repaired, replaced, or supplemented when they become nonfunctional or the sediment reaches 1/3 of the height of the fence. These repairs must be made within 24 hours of discovery, or as soon as field conditions allow access. All repairs shall be recorded in the SWPPP.

INFRASAFE INLET PROTECTION DEVICE (OR EQUAL)

8 C500

NOTE: TIP CURB OUTWARD, AS NECESSARY.

14. Inspect the construction site once every seven days during active construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 hours. All inspections shall be recorded in the SWPPP.

17. All soils tracked onto pavement shall be removed daily.

PROFILE

N DIRECTIO FF O N OF RU

NEW BASE AGGREGATE

12. All storm sewer catch basins not needed for site drainage during construction shall be covered to prevent runoff from entering the storm sewer system. Catch basins necessary for site drainage during construction shall be provided with inlet protection.

16. If sediment escapes the construction site, off-site accumulations of sediment must be removed in a manner and at a frequency sufficient to minimize off-site impacts.

FITS NEENAH 1642 AND 1733 FRAMES OR EQUAL

NOT TO SCALE

10. All riprap shall be installed with a filter material or soil separation fabric and comply with the Minnesota Department of Transportation Standard Specifications. 11. All storm sewers discharging into wetlands or water bodies shall outlet at or below the normal water level of the respective wetland or water body at an elevation where the downstream slope is 1 percent or flatter. The normal water level shall be the invert elevation of the outlet of the wetland or water body.

400 MICRON FILTER BAG IN EACH BASKET

CONCRETE CONSTRUCTION DETAIL

5 C500

7"

9.

All grading operations shall be conducted in a manner to minimize the potential for site erosion. Sediment control practices must be established on all down gradient perimeters before any up gradient land disturbing activities begin.

R3 "

8.

2 BASKETS WITH 400 MICRON FILTER BAGS. TO BE CHECKED PERIODICALLY AND CLEANED OUT AFTER EACH RAIN EVENT

EXISTING SUBGRADE SOIL

6"

7.

PLAN

13.5"

6.

C 2020 Larson Engineering, Inc. All rights reserved.

The toe of the silt fence shall be trenched in a minimum of 6�. The trench backfill shall be compacted with a vibratory plate compactor.

15 W KELLOGG BLVD SAINT PAUL, MN 55102

5.

3524 Labore Road White Bear Lake, MN 55110 651.481.9120 (f) 651.481.9201 www.larsonengr.com

All construction site entrances shall be surfaced with crushed rock across the entire width of the entrance and from the entrance to a point 50' into the construction zone.

Engineering, Inc.

4.

NEW 6" BASE AGGREGATE

NEW 8" BASE AGGREGATE

HAMM'S BREWERY STORMWATER IMPROVEMENTS

Erosion control measures shown on the erosion control plan are the absolute minimum. The contractor shall install temporary earth dikes, sediment traps or basins, additional siltation fencing, and/or disk the soil parallel to the contours as deemed necessary to further control erosion. All changes shall be recorded in the SWPPP.

CITY OF SAINT PAUL

3.

Client:

Install temporary erosion control measures (inlet protection, silt fence, and rock construction entrances) prior to beginning any excavation or demolition work at the site.

NEW 6" PORTLAND CEMENT CONCRETE

Project Title:

2.

NEW 5" BITUMINOUS PAVEMENT PLACED IN 3 LIFTS

PRELIMINARY NOT FOR CONSTRUCTION

Owner and Contractor shall obtain MPCA-NPDES permit. Contractor shall be responsible for all fees pertaining to this permit. The SWPPP shall be kept onsite at all times.

DEPTH VARIES

1.

Larson

EROSION CONTROL NOTES

CONCRETE VALLEY GUTTER WITH BITUMINOUS APRON

GENERAL SYSTEM NOTES: 1. CAP ALL STORAGE PIPE ENDS. 2. FABRIC SHALL BE EXCLUDED FROM BOTTOM OF INFILTRATION PRACTICE. 3. DOUBLE-WASHED, ANGULAR, UNIFORM (UNIFORMITY COEFFICIENT OF TWO OF SMALLER) AGGREGATE BETWEEN 1.5 AND 3.0 INCH DIAMETER. 4. ACCEPTABLE ROCK TYPES: IGNEOUS AND CRYSTALLINE METAMORPHIC (GRANITEM RYOLITE, GABBRO, BASALT, QUARTZITE). 5. UNACCEPTABLE ROCK TYPES: CARBONATE (LIMESTONE, DOLOMITE, DOLOSTONE) AND NON-CRYSTALLINE METAMORPHIC (SHALE).

SCARIFY EXISTING SOILS PRIOR TO PLACEMENT OF ROCK BACK-FILL

Project #:

12196139.000

Drawn By:

TJR

Checked By: MJW Issue Date: Sheet Title:

DETAILS

C500

Sheet:

NOT TO SCALE

7 C500

UNDERGROUND PIPE STORAGE SECTION NOT TO SCALE

06.23.20


July 8, 2020 Board Meeting IV. Special Report—Ford Site, MRB Crossing Funding Request DATE: TO: FROM: RE:

July 1, 2020 CRWD Board of Managers Bob Fossum, Division Manager Ford Site Funding Request—MRB Crossing

Background The District has been working with Ryan Companies and the City of St. Paul on various aspects of the design of the project over the past couple of years. In April 2020, the City of St. Paul submitted a funding request for the water features and stormwater system on the Ford Site. In summary, the request included: 1. Ford Parkway Baseflow Groundwater Capture -- $200,000 2. Southern Stormwater Enhancements -- $595,000 3. Hidden Falls Regional Park Connection -- $1,500,000 (allowance) At the June 3, 2020 Board meeting, the Managers approved Ford Site funding to the City of St. Paul for elements #1--Ford Parkway Baseflow Groundwater Capture and #2--Southern Stormwater Enhancements from their 4/28/2020 funding request for an amount not to exceed $795,000. The Board further directed staff to develop a grant agreement with the City of St. Paul for subsequent Board approval. Issues During May and June, Item #3 (Hidden Falls Regional Park Connection) has been under further development and additional analysis of the feasibility and cost of this option. This option would connect the new stream feature on the Ford Site with the existing stream feature in Hidden Falls Regional Park by constructing a tunnel beneath Mississippi River Blvd. The City of St. Paul has submitted additional information and clarification on the funding request and it has been enclosed. Staff will review the funding request with the Managers. The deliverable includes detailed construction plans that the Board need not review unless interested. District Staff and City Staff will review the request with the Board. After review and discussion at the July 8th meeting, staff would intend to develop and bring a funding recommendation to the Board at the July 22nd meeting for consideration. Requested Action Review and comment only. enc:

Email from W. Saunders-Pearce dated 7-1-2020 Mississippi River Blvd. Crossing Feasibility Study, dated 6-30-2020

W:\06 Projects\Ford Site\Grant Request\MRB Crossing Request\Brd Memo--Ford Funding Request 07-01-2020.docx

Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District


Bob Fossum From: Sent: To: Cc: Subject: Attachments:

Saunders-Pearce, Wes (CI-StPaul) <wes.saunders-pearce@ci.stpaul.mn.us> Wednesday, July 1, 2020 6:10 AM Bob Fossum Kuebler, David (CI-StPaul); Stewart, Ellen (CI-StPaul); Gardner, Anne (CI-StPaul); Nick Koch CRWD Board - Ford MRB connection - Preferred alternative MRB Crossing Feasibility Study.pdf

Bob, As you may recall, in my April 28 letter requesting funding for Ford Site we identified an emerging opportunity for an enhanced water resource and public realm connection between the Ford Site and Hidden Falls Regional Park. The letter requested the CRWD Board consider a $1.5 million funding allowance for the opportunity based on a planning level cost analysis completed by Ryan Companies. The city rapidly completed a concept level feasibility study for this opportunity which included working with our development partner on a pricing exercise of the concepts. Please see the attached deliverable prepared by TKDA, dated June 30, 2020. The city’s preferred alternative is concept #2 as illustrated in the study. Phase one of the preferred alternative provides a daylighted stream and trail connection under a bridge proposed for Mississippi River Boulevard, with plazas on either side of the bridge. Phase one reflects the scope of work contemplated within the April 28 letter. The second phase of the preferred alternative provides additional trail improvements within Hidden Falls Regional Park. The total estimated (concept) cost for the entire scope studied by TKDA is approximately $2,537,900. Phase one construction is estimated to cost approximately $1,959,100. Conversations are in progress with Ryan Companies regarding phase one to clarify construction schedules, cost assumptions, and final design responsibilities. For its part the city can leverage $350,000 of anticipated infrastructure costs as a “credit” if a funding commitment is received in July from CRWD. If that occurs, phase one of the preferred alternative would reflect a total estimated (concept) cost of $1,609,100. The City respectfully requests the CRWD Board to approve funding for the full allowance requested in the letter of April 28. An affirmative in this critical decision will allow the City to rapidly complete phase one final design and remain in synch with the development program to leverage $350,000 of anticipated work as credit. The City remains vigilant for supplemental funding sources since the concept pricing exceeds what is being requested from CRWD. To that end we would re‐assess the phase one pricing package upon completion of final design and make determinations about value engineering if necessary. City staff and Ryan Companies both agree the preferred alternative is an outstanding enhancement and extremely worthwhile to pursue. We are grateful for your agency’s consideration of this significant funding request. Kindly, Wes Saunders‐Pearce Water Resource Coordinator | City of Saint Paul

1


Feasibility Study Mississippi River Boulevard Crossing Between Ford Site Redevelopment and Hidden Falls Regional Park

City of Saint Paul Parks and Recreation Design & Construction

Date: June 30, 2020 Project No. 17921.000


Feasibility Study for Mississippi River Boulevard Crossing Between Ford Site Redevelopment and Hidden Falls Regional Park City of Saint Paul Parks and Recreation Table of Contents 1. Study Narrative ................................................................................................2 pages 2. Design Criteria Matrix ...................................................................................... 1 page 3. Rendered Preferred Alternative Site Plan ......................................................... 1 page 4. Perspective Tunnel Rendering .......................................................................... 1 page 5. Alternatives Analysis Plan Set .......................................................................11 pages 6. Existing Conditions Photo Log .......................................................................13 pages 7. Precedent Imagery.........................................................................................11 pages 8. Existing Conditions Survey ............................................................................. 1 page 9. Cost Estimate from Ryan Companies ..............................................................2 pages


Feasibility Study for Mississippi River Boulevard Crossing Between Ford Site and Hidden Falls Regional Park City of Saint Paul Parks and Recreation June 30, 2020

NARRATIVE The Ford Site Redevelopment (Ford Site) anticipates Mississippi River Boulevard (MRB) excavation at Hidden Falls Regional Park (Hidden Falls) to install a new concrete drainage pipe conveying flows from the new upstream system and creek feature. The objective of this Feasibility Study is to leverage the need for a proposed excavation at MRB to evaluate possible infrastructure alternatives that achieve multiple benefits. The desired outcome is identification of feasible options for creating a connection from the Ford Site to Hidden Falls that enhances the public realm by continuing an open channel creek while facilitating safe and accessible pedestrian movement. The study boundaries are generally defined as starting with the Hidden Falls “headwaters,” also known as Park C, at the Ford Site and extending south across MRB to the outlet at Hidden Falls. The City of Saint Paul Parks and Recreation Division (City) received STAR grant funding for the study, which is not intended to meet Minnesota Statute 429 pertaining to special assessments. A 3D scan of the existing Hidden Falls waterfall and surrounding area was performed in early May 2020 to gain a better understanding of the unique exposed bedrock wall faces, stacked limestone walls, and ledges. This 3D survey was used in conjunction with two 2D surveys - for the Ford development and for Hidden Falls Regional Park. The three surveys were spliced together giving preference to the 3D scan survey limits where any conflicts existed between the surveyed topography. The resulting spliced survey serves as the basis for this study. TKDA visited the site to review the site survey of existing conditions in an effort to identify any major discrepancies. Documents prepared by others were also reviewed, including: 90% infrastructure plans for Ford Site Redevelopment, 30% plans for Park C, 90% stormwater management plan/report/model prepared by Barr Engineering, Hidden Falls Crosby Farm Master Plan prepared in 2019, Hidden Falls Water Resource Development Feasibility Study prepared by Inter-Fluve in 2014, and geotechnical report for borings that are immediately adjacent to the MRB crossing. Based on this information, TKDA prepared four alternatives that provide varying levels of both drainage and pedestrian connectivity. These alternatives are defined in the attached plan set showing plan/profile/section views. Precedent imagery from similar projects are provided on the plan set, and as a separate attachment. Alternative 1 – 12’ BEBO structure for stream-only conveyance a. Achieves stream channel daylighting without the pedestrian underpass. Alternative 2 – 24’ CONSPAN precast bridge structure with open channel a) 150’ of additional daylighting of the creek and terraced retaining walls. b) Accessible 12’ wide trail and a meandering 4’ wide channel section. c) The alignment of the crossing follows the existing 48” culvert. d) Safety railing separates the trail from the channel. e) The CP rail drainage is intercepted upstream of the crossing.


Page 2 f) Decorative end treatments on each end of the precast bridge structure. g) A continuous cast-in-place sloped footing for the precast bridge structure. Alternative 3 – 24’ CONSPAN precast bridge structure. a. Same as alternative 2, but without the 150’ of daylighting. Instead, flows are conveyed through a 48” storm sewer. Alternative 4 – 16’ span x 12’ height box culvert a) Accommodates a 12’ wide trail with 10’ of vertical clearance b) A safety railing separates the trail from the channel. c) The alignment of the box culvert follows the proposed alignment of the 48” from the Barr Engineering design. Hidden Falls South Connection – Boardwalk steel structure a) Included with alternatives 2, 3, and 4. b) Provides accessible connection to existing trail on south side of MRB. c) Connects to existing stairs down to Hidden Falls creek. d) Design based on precedent project located in Minneapolis. e) Reduces impacts to existing trees and vegetation compared to paved trail with walls. f) Accommodates bedrock ledges and steep existing side slopes. Ryan Companies reviewed the alternatives and provided estimated costs for each, which are summarized in the table below. The costs for alternatives 2-4 include the Hidden Falls South boardwalk. Refer to the attached detailed cost breakdown for more information. Alternative

Total Est. Cost Baseline Credit Adj. Est. Cost

1 Creek 12’ BEBO $ 1,410,661 $ 350,000 $ 1,060,661

2 Creek & Trail 24’ Conspan $ 2,537,909 $ 350,000 $ 2,187,909

3 Trail 24’ Conspan $ 2,201,390 $ 350,000 $ 1,851,390

4 Trail 16’ Box Culvert $ 2,125,406 $ 350,000 $ 1,775,406

Total Est. Cost A1 G1 G2 G3 X Y

$ 1,410,661 $ 230,806 $ 45,000 $ 339,217 $ 349,767 $ 353,585 $ 92,286

$ 2,537,909 $ 316,434 $ 90,000 $ 572,061 $ 564,629 $ 753,908 $ 240,877

$ 2,201,390 $ 215,508 $ 90,000 $ 392,752 $ 577,909 $ 706,359 $ 218,862

$ 2,125,406 $ 239,518 $ 90,000 $ 602,084 $ 284,367 $ 695,546 $ 213,891

A1 – Excavation, backfill, material sorting, temporary pumping and dewatering. G1 – Clearing, demolition, helical piers, and boardwalk structure for south connection. G2 – Paving, curb & gutter, sidewalk, retaining walls, stairs, lighting, fencing and plaza areas. G3 – Tunnel structure, storm sewer, and creek channel. X – General conditions, permitting, and construction contingency (10%). Y – Construction overhead and profit.


Design Criteria Matrix

Quantitative

Feasibility Study for Mississippi River Boulevard Crossing Between Ford Site Redevelopment and Hidden Falls Regional Park City of Saint Paul Parks and Recreation 6.30.2020

Design Criteria

Alt. 1: Stream Crossing Only

Alt. 2: Conspan & Open Channel

Alt. 3: Conspan

Alt. 4: Box Culvert

Loading 10' Vertical Clearance Crossing Structure (accomodates vehicle)

X

X

X

X

X X X

X X X

X X X

X X X

X X X

X X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X X X

X X X

X X X

X

X

X

X X X

X X

X X

Width Min. Pavement Section

Stream

Trail

Maintenance

User Experience

Design flow Scour prevention measures Matches prop. Channel section 10' min. width 1:20 Slope Equipment access Floatable Capture

Qualitative

X

Rest Areas/ Plaza Intuitive trail alignment/circulation Overlooks Safety (railings, sightlines) Visually integrated into natural setting

Aesthetics

X X X

Stream Morphology (natural/continuity) Use of existing stone walls Captures Views Visual connection between Regional Park and Ford Site

Ecology

Stream channel promotes ecological function Use of natural materials Preserves Natural Vegetation

Total Criteria Achieved

X

X X X

X X

X

X

11

22

18

18



Design Criteria Matrix Feasibility Study for Mississippi River Boulevard Crossing Between Ford Site Redevelopment and Hidden Falls Regional Park City of Saint Paul Parks and Recreation 6.30.2020


1 0 BAR IS ONE INCH ON ORIGINAL DRAWING. IF NOT ONE INCH ON THIS DRAWING ADJUST SCALES ACCORDINGLY.

ALTERNATIVES ANALYSIS MISSISSIPPI RIVER BOULEVARD CROSSING BETWEEN FORD SITE REDEVELOPMENT AND HIDDEN FALLS REGIONAL PARK CITY OF SAINT PAUL PARKS & RECREATION DESIGN & CONSTRUCTION

INDEX 01 02 03 04 05 06 07 08 09 10 11

COVER EST. QUANTITIES ALTERNATIVE 1 ALTERNATIVE 2 ALTERNATIVE 2 SECTIONS ALTERNATIVE 3 ALTERNATIVE 3 SECTIONS ALTERNATIVE 4 ALTERNATIVE 4 SECTIONS HIDDEN FALLS SOUTH DETAILS

FILENAME:

Jun 30, 2020 - 4:28pm

PLOT DATE:

K:\n-z\StPaul-ParksRec\17921000\04_Production\01_CAD\02_Sheets\01 TITLE.dwg

THIS PLAN CONTAINS 11 SHEETS

VICINITY MAP

DESIGNED DRAWN CHECKED NO.

DATE

BY

DESCRIPTION OF REVISIONS

FOR DISCUSSION ONLY NOT FOR CONSTRUCTION

444 Cedar Street, Suite 1500 Saint Paul, MN 55101 651.292.4400 tkda.com

PROJ. NO.

CITY OF SAINT PAUL PARKS & RECREATION DESIGN & CONSTRUCTION

MISSISSIPPI RIVER BLVD CROSSING

17921.000

COVER

DRAWING NO.

01


1 0 BAR IS ONE INCH ON ORIGINAL DRAWING. IF NOT ONE INCH ON THIS DRAWING ADJUST SCALES ACCORDINGLY. Jun 30, 2020 - 4:28pm

K:\n-z\StPaul-ParksRec\17921000\04_Production\01_CAD\02_Sheets\02 EST. QUANTITIES.dwg FILENAME:

PLOT DATE:

DESIGNED DRAWN CHECKED NO.

DATE

BY

DESCRIPTION OF REVISIONS

FOR DISCUSSION ONLY NOT FOR CONSTRUCTION

444 Cedar Street, Suite 1500 Saint Paul, MN 55101 651.292.4400 tkda.com

PROJ. NO.

CITY OF SAINT PAUL PARKS & RECREATION DESIGN & CONSTRUCTION

MISSISSIPPI RIVER BLVD CROSSING

17921.000

EST. QUANTITIES

DRAWING NO.

02


1 0 BAR IS ONE INCH ON ORIGINAL DRAWING. IF NOT ONE INCH ON THIS DRAWING ADJUST SCALES ACCORDINGLY. Jun 30, 2020 - 4:29pm

N

K:\n-z\StPaul-ParksRec\17921000\04_Production\01_CAD\02_Sheets\03 ALTERNATIVE 1.dwg FILENAME:

PLOT DATE:

TYPICAL SECTION

0

20

40 Feet

PROFILE

DESIGNED DRAWN CHECKED NO.

DATE

BY

DESCRIPTION OF REVISIONS

FOR DISCUSSION ONLY NOT FOR CONSTRUCTION

444 Cedar Street, Suite 1500 Saint Paul, MN 55101 651.292.4400 tkda.com

BEBO SPANDREL AND WING WALLS

BEBO ARCH END SECTIONS

PROJ. NO.

CITY OF SAINT PAUL PARKS & RECREATION DESIGN & CONSTRUCTION

MISSISSIPPI RIVER BLVD CROSSING

17921.000

ALTERNATIVE 1

DRAWING NO.

03


1 0 BAR IS ONE INCH ON ORIGINAL DRAWING. IF NOT ONE INCH ON THIS DRAWING ADJUST SCALES ACCORDINGLY. Jun 30, 2020 - 4:30pm

N

K:\n-z\StPaul-ParksRec\17921000\04_Production\01_CAD\02_Sheets\04 ALTERNATIVE 2.dwg FILENAME:

PLOT DATE:

TYPICAL SECTION

0

20

40 Feet

DESIGNED DRAWN CHECKED NO.

DATE

BY

DESCRIPTION OF REVISIONS

FOR DISCUSSION ONLY NOT FOR CONSTRUCTION

444 Cedar Street, Suite 1500 Saint Paul, MN 55101 651.292.4400 tkda.com

PROJ. NO.

CITY OF SAINT PAUL PARKS & RECREATION DESIGN & CONSTRUCTION

MISSISSIPPI RIVER BLVD CROSSING

17921.000

ALTERNATIVE 2

DRAWING NO.

04


1 0 BAR IS ONE INCH ON ORIGINAL DRAWING. IF NOT ONE INCH ON THIS DRAWING ADJUST SCALES ACCORDINGLY.

ALTERNATIVE 2 STATION 1+00 SECTION

EXPOSED BEDROCK RENDERING

FILENAME:

Jun 30, 2020 - 4:31pm

PLOT DATE:

K:\n-z\StPaul-ParksRec\17921000\04_Production\01_CAD\02_Sheets\05 ALTERNATIVE 2 SECTIONS.dwg

ALTERNATIVE 2 STATION 2+00 SECTION

ALTERNATIVE 2 STATION 2+75 SECTION 20' CONSPAN PRECEDENT IMAGE

DESIGNED DRAWN CHECKED NO.

DATE

BY

DESCRIPTION OF REVISIONS

FOR DISCUSSION ONLY NOT FOR CONSTRUCTION

444 Cedar Street, Suite 1500 Saint Paul, MN 55101 651.292.4400 tkda.com

PROJ. NO.

CITY OF SAINT PAUL PARKS & RECREATION DESIGN & CONSTRUCTION

MISSISSIPPI RIVER BLVD CROSSING

17921.000

ALTERNATIVE 2 SECTIONS

DRAWING NO.

05


1 0 BAR IS ONE INCH ON ORIGINAL DRAWING. IF NOT ONE INCH ON THIS DRAWING ADJUST SCALES ACCORDINGLY. Jun 30, 2020 - 4:32pm

N

K:\n-z\StPaul-ParksRec\17921000\04_Production\01_CAD\02_Sheets\06 ALTERNATIVE 3.dwg FILENAME:

PLOT DATE:

TYPICAL SECTION

0

20

40 Feet

DESIGNED DRAWN CHECKED NO.

DATE

BY

DESCRIPTION OF REVISIONS

FOR DISCUSSION ONLY NOT FOR CONSTRUCTION

444 Cedar Street, Suite 1500 Saint Paul, MN 55101 651.292.4400 tkda.com

PROJ. NO.

CITY OF SAINT PAUL PARKS & RECREATION DESIGN & CONSTRUCTION

MISSISSIPPI RIVER BLVD CROSSING

17921.000

ALTERNATIVE 3

DRAWING NO.

06


1 0 BAR IS ONE INCH ON ORIGINAL DRAWING. IF NOT ONE INCH ON THIS DRAWING ADJUST SCALES ACCORDINGLY.

ALTERNATIVE 3 STATION 1+00 SECTION

PRECEDENT IMAGE

FILENAME:

Jun 30, 2020 - 4:33pm

PLOT DATE:

K:\n-z\StPaul-ParksRec\17921000\04_Production\01_CAD\02_Sheets\07 ALTERNATIVE 3 SECTIONS.dwg

ALTERNATIVE 3 STATION 2+00 SECTION

ALTERNATIVE 3 STATION 2+75 SECTION 20' CONSPAN PRECEDENT IMAGE

DESIGNED DRAWN CHECKED NO.

DATE

BY

DESCRIPTION OF REVISIONS

FOR DISCUSSION ONLY NOT FOR CONSTRUCTION

444 Cedar Street, Suite 1500 Saint Paul, MN 55101 651.292.4400 tkda.com

PROJ. NO.

CITY OF SAINT PAUL PARKS & RECREATION DESIGN & CONSTRUCTION

MISSISSIPPI RIVER BLVD CROSSING

17921.000

ALTERNATIVE 3 SECTIONS

DRAWING NO.

07


1 0 BAR IS ONE INCH ON ORIGINAL DRAWING. IF NOT ONE INCH ON THIS DRAWING ADJUST SCALES ACCORDINGLY.

FILENAME:

Jun 30, 2020 - 4:35pm

PLOT DATE:

K:\n-z\StPaul-ParksRec\17921000\04_Production\01_CAD\02_Sheets\08 ALTERNATIVE 4.dwg

(HI D HE DEN A F FE DWA ALLS A T 6.3 TUR ER E 9± AC )

N

TYPICAL SECTION

0

20

40 Feet

DESIGNED DRAWN CHECKED NO.

DATE

BY

DESCRIPTION OF REVISIONS

FOR DISCUSSION ONLY NOT FOR CONSTRUCTION

444 Cedar Street, Suite 1500 Saint Paul, MN 55101 651.292.4400 tkda.com

PROJ. NO.

CITY OF SAINT PAUL PARKS & RECREATION DESIGN & CONSTRUCTION

MISSISSIPPI RIVER BLVD CROSSING

17921.000

ALTERNATIVE 4

DRAWING NO.

08


1 0 BAR IS ONE INCH ON ORIGINAL DRAWING. IF NOT ONE INCH ON THIS DRAWING ADJUST SCALES ACCORDINGLY.

ALTERNATIVE 4 STATION 2+00 SECTION

K:\n-z\StPaul-ParksRec\17921000\04_Production\01_CAD\02_Sheets\09 ALTERNATIVE 4 SECTIONS.dwg FILENAME:

PLOT DATE:

Jun 30, 2020 - 4:36pm

ALTERNATIVE 4 STATION 1+00 SECTION

CONCEPT RENDERING

ALTERNATIVE 4 STATION 3+00 SECTION

DESIGNED DRAWN CHECKED NO.

DATE

BY

DESCRIPTION OF REVISIONS

FOR DISCUSSION ONLY NOT FOR CONSTRUCTION

444 Cedar Street, Suite 1500 Saint Paul, MN 55101 651.292.4400 tkda.com

PROJ. NO.

CITY OF SAINT PAUL PARKS & RECREATION DESIGN & CONSTRUCTION

MISSISSIPPI RIVER BLVD CROSSING

17921.000

ALTERNATIVE 4 SECTIONS

DRAWING NO.

09


1 0 BAR IS ONE INCH ON ORIGINAL DRAWING. IF NOT ONE INCH ON THIS DRAWING ADJUST SCALES ACCORDINGLY. Jun 30, 2020 - 4:37pm

N

K:\n-z\StPaul-ParksRec\17921000\04_Production\01_CAD\02_Sheets\10 HIDDEN FALLS SOUTH.dwg FILENAME:

PLOT DATE:

0

20

40 Feet

DESIGNED DRAWN CHECKED NO.

DATE

BY

DESCRIPTION OF REVISIONS

FOR DISCUSSION ONLY NOT FOR CONSTRUCTION

444 Cedar Street, Suite 1500 Saint Paul, MN 55101 651.292.4400 tkda.com

PROJ. NO.

CITY OF SAINT PAUL PARKS & RECREATION DESIGN & CONSTRUCTION

MISSISSIPPI RIVER BLVD CROSSING

17921.000

HIDDEN FALLS SOUTH

DRAWING NO.

10


1 0 BAR IS ONE INCH ON ORIGINAL DRAWING. IF NOT ONE INCH ON THIS DRAWING ADJUST SCALES ACCORDINGLY.

BOARDWALK RENDERINGS

BOARDWALK DETAILS - HIDDEN FALLS SOUTH

FILENAME:

Jun 30, 2020 - 4:38pm

PLOT DATE:

K:\n-z\StPaul-ParksRec\17921000\04_Production\01_CAD\02_Sheets\11 DETAILS.dwg

2'-6"

11"

1'-2"

2'-6"

2'-0"

2'-6"

5"

5'-0"

DESIGNED DRAWN CHECKED NO.

DATE

BY

DESCRIPTION OF REVISIONS

TYPICAL STREAM SECTION

TYPICAL LIGHT FIXTURES

BEBO/CONSPAN TYPICAL FOOTING DETAIL

FOR DISCUSSION ONLY NOT FOR CONSTRUCTION

444 Cedar Street, Suite 1500 Saint Paul, MN 55101 651.292.4400 tkda.com

PROJ. NO.

CITY OF SAINT PAUL PARKS & RECREATION DESIGN & CONSTRUCTION

MISSISSIPPI RIVER BLVD CROSSING

17921.000

DETAILS

DRAWING NO.

11


Feasibility Study - Mississippi River Boulevard Crossing

Project Site Photo Log - April 15, 2020

Page 1 of 13


Feasibility Study - Mississippi River Boulevard Crossing

Project Site Photo Log - April 15, 2020

Page 2 of 13


Feasibility Study - Mississippi River Boulevard Crossing

Project Site Photo Log - April 15, 2020

Page 3 of 13


Feasibility Study - Mississippi River Boulevard Crossing

Project Site Photo Log - April 15, 2020

Page 4 of 13


Feasibility Study - Mississippi River Boulevard Crossing

Project Site Photo Log - April 15, 2020

Page 5 of 13


Feasibility Study - Mississippi River Boulevard Crossing

Project Site Photo Log - April 15, 2020

Page 6 of 13


Feasibility Study - Mississippi River Boulevard Crossing

Project Site Photo Log - April 15, 2020

Page 7 of 13


Feasibility Study - Mississippi River Boulevard Crossing

Project Site Photo Log - April 15, 2020

Page 8 of 13


Feasibility Study - Mississippi River Boulevard Crossing

Project Site Photo Log - April 15, 2020

Page 9 of 13


Feasibility Study - Mississippi River Boulevard Crossing

Project Site Photo Log - April 15, 2020

Page 10 of 13


Feasibility Study - Mississippi River Boulevard Crossing

Project Site Photo Log - April 15, 2020

Page 11 of 13


Feasibility Study - Mississippi River Boulevard Crossing

Project Site Photo Log - April 15, 2020

Page 12 of 13


Feasibility Study - Mississippi River Boulevard Crossing

Project Site Photo Log - April 15, 2020

Page 13 of 13


Precedent Imagery Mississippi River Boulevard Crossing at Hidden Falls


Mississippi River Boulevard Crossing Precedent Imagery

Trout Brook Stream Saint Paul, MN


48’ Span BEBO Arch Precast Structure Mississippi River Boulevard Crossing Precedent Imagery

Bluff Creek, Chanhassen, MN


20’ Span Conspan Arch Precast Structure Pagosa Springs, CO

Mississippi River Boulevard Crossing Precedent Imagery


20’ Span Conspan Arch Precast Structure Castle Rock, CO

Mississippi River Boulevard Crossing Precedent Imagery


20’ Span Conspan Arch Precast Structure Thornton, CO

Mississippi River Boulevard Crossing Precedent Imagery


60’ Span Conspan Arch Precast Structure Denver, CO

Mississippi River Boulevard Crossing Precedent Imagery


36’ Span Conspan Arch Precast Structure Denver, CO

Mississippi River Boulevard Crossing Precedent Imagery


24’ Span Conspan Arch Precast Structure Missoula, MT

Mississippi River Boulevard Crossing Precedent Imagery


Mississippi River Boulevard Crossing Precedent Imagery

Pedestrian Underpass Box Culvert Portland River Trail, Portland, MI


Boardwalk, Minnehaha Parkway at Lyndale Avenue Minneapolis, MN Mississippi River Boulevard Crossing Precedent Imagery



Ford Site - Alternate MRB Crossing - Concept Pricing Saint Paul, MN Job #: 5069-xxx Alt #1 L4

Component Description

PRICE

u/m

QTY

Alt #2 Excluding Boardwalk QTY Cost

Cost

Alt #3 Excluding Boardwalk QTY Cost

Alt #4 Excluding Boardwalk QTY Cost

Hidden Falls South QTY Cost

Comments

$6.00

cy

1,377.33

$8,264

1,408.27

$8,450

622.22

$3,733

2,355.56

$14,133

$28.00

cy

2,325.96

$65,127

3,044.18

$85,237

1,244.44

$34,844

2,133.33

$59,733

Excavate for walls, creek channel and sidewalks on Park C. This is $0 the overburden which gets exported offsite as excess material. Excavate for walls, creek channel and sidewalks on Park C. This is the limestone bedrock removal. Good material gets salvaged for stacked stone reuse. Weathered bedrock goes offsite as excess $0 material.

$6.00

cy

500.

$3,000

666.67

$4,000

666.67

$4,000

500.

$3,000

Excavate for tunnel in ROW and park space. This is the overburden below the street section. This will get exported offsite assuming it is $0 old material that isn't suitable for reuse per PW standards.

$28.00 $13.00 $18.00

cy cy cy

1,133.33 870. 2,915.12

$31,733 $11,310 $52,472

2,266.67 1,323.33 3,668.19

$63,467 $17,203 $66,027

2,266.67 1,323.33 2,342.22

$63,467 $17,203 $42,160

1,133.33 870. 3,835.56

$31,733 $11,310 $69,040

A1010.120 Sort Bedrock Material for Reuse as Limestone Wall & Creek Base Material A1010.120 Drain Tile

$250.00 $13.00

hr lf

40. 300.

$10,000 $3,900

50. 350.

$12,500 $4,550

30. 200.

$7,500 $2,600

30. 236.

$7,500 $3,068

A1010.150 Temporary Pumping of Ford Stormwater

$500.00

day

60.

$30,000

80.

$40,000

50.

$25,000

50.

$25,000

Excavate for tunnel in ROW and regional park. This the limestone bedrock removal. Good material will get salvaged for stacked stone $0 reuse. Remaining goes offsite as excess material. $0 Assumes backfilling around tunnel. $0 Export of unsuitable material offsite. Assumes equipment sorting time to sort reusable limestone versus $0 excess. $0 Drain tile adjacent to select walls and tunnel structure. This assumes laborer and equipment costs to pump stormwater that would naturally flow to Hidden Falls back into Ford site temp sediment basins. Ryan would either need to recirculate stormwater onsite during this construction or pump to an existing structure to $0 bypass final system during construction.

ls

1.

$15,000 $230,806 $230,806 $230,806

1.

$15,000 $316,434 $316,434 $316,434

1.

$15,000 $215,508 $215,508 $215,508

1.

$15,000 $239,518 $239,518 $239,518

This is for dewatering of new creek and tunnel structures assuming we need to collect and pump this water back onto Ford property to $0 clean the water before it discharges to Hidden Falls Regional Park. $0 $0 $0

$239,518

$0

A1010.100 Excavate for walls, creek channel and walks - Park C - overburden

A1010.110 Excavate for Walls & Creek Channel - bedrock

A1010.115 Excavate for Tunnel - Overburden

A1010.116 Excavate for Tunnel - Bedrock A1010.117 Backfill Tunnel System A1010.120 Export Unsuitable

A1010.150 Dewatering of new excavation

$15,000.00

$230,806

$316,434

$215,508

G1010.100 Clear & Grub Trees/ Demo Existing Utilies/ Demo Roadway

$30,000.00

ls

1.

$30,000

1.

$30,000

1.

$30,000

1.

$30,000

1.

G1010.125 Tree Protection/ SWPPP Implementation

$15,000.00

ls

1.

$15,000 $45,000

1.

$15,000 $45,000

1.

$15,000 $45,000

1.

$15,000 $45,000

1.

G1060.100 Helical Pier w/ Rock Anchors - assumes 12' spaceing G1060.110 Helical Pier Encasement

G1060.120 Board Walk Steel Structure, Handrails & Decking

$125.00

lf

$0

$0

$0

$0

875.

$75.00

sfwa

$0

$0

$0

$0

3,500.

$200.00

sf

G2010.115 Sand Subgrade G2010.130 Asphalt Paving-HD1-Roadways G2010.160 Curb & Gutter

$13.00 $45.00 $27.00

cy sy lf

G2030.135 G2030.210 G2030.210 G2030.220

$25.00 $11.00 $20.00 $35.00

sf sf sf sy

133.33

$3.00

sf

10,000.

$30,000

12,000.

$36,000

$1,000.00

ea

11.

$11,000 $41,000

31.

$31,000 $67,000

Plaza - Finish TBD Concrete Sidewalk - Stair Landings Concrete Sidewalk - Alt 4 Only - Box Culvert Bituminous Sidewalk Section

G2040.100 Planting/Irrigation Allowance

G2040.130 Replace Removed Trees

G2050.100 Demo Existing Hidden Falls Regional Park Creek

G2050.105 Retaining Wall #1 - Concrete G2050.115 Concrete Stairs

$26,200.00

$1,200.00

55.56 166.67 110.

$0 $0 $45,000 $722 $7,500 $2,970 $11,192 $0 $0 $0 $4,667 $4,667

74.07 222.22 150.

790. 304. 821.44

1.

$0 $0 $45,000 $963 $10,000 $4,050 $15,013 $19,750 $3,344 $0 $28,751 $51,845

$26,200

74.07 222.22 150.

867.

$0 $0 $45,000 $963 $10,000 $4,050 $15,013

55.56 177.78 140.

$0 $0 $45,000 $722 $8,000 $3,780 $12,502

$21,675 $0 $0 $10,819 $32,494

672. 125. 1,100. 408.33

$16,800 $1,375 $22,000 $14,292 $54,467

15,000.

$45,000

15,000.

$45,000

1,000.

31.

$31,000 $76,000

25.

$25,000 $70,000

40.

309.11

ls

1.

$26,200

1.

$26,200

1.

$26,200

cy

21.78

$26,133

21.78

$26,133

$0

$0

178.67

$26,800

$0

418.67

$62,800

sfwa

$35.00

sf

4,875.

$170,625

5,820.

$203,700

2,505.

$87,675

6,307.

$220,745

G2050.120 Rebuild Bedrock with stone cladding at falls

$20,000.00

ls

1. 1. 1.

$10,000 $123,875 $30,000 $5,000

.5

ls ls

$10,000 $292,833 $30,000 $5,000

.5

$30,000.00 $5,000.00

$20,000 $242,958 $30,000 $5,000

.5

G2060.190 Lighting Allowance G2060.220 Steel / Ornamental Fencing

$10,000 $319,745 $30,000 $5,000

1. 1.

Page 1 of 2

1. 1.

150.

1. 1.

Assumes entire section is boardwalk versus partial concrete. Unsure how concrete sidewalk would be supported without retaining wall. Unit cost is based on budget received for Central Water Feature pedestrian bridge deck structure. This can be updated if $772,200 MPLS project unit cost information is available. $1,144,075 $1,189,075 $0 Replace sand section at MRB ROW. $0 Replace street section at MRB ROW $0 Replace curbs at MRB ROW $0 Assumes $25/SF for concrete unit pavers. Could adjust to $0 something less if desired. $1,650 6" unreinforced grey concrete panels. $0 Thickened grey concrete sidewalk in box culvert. $0 $1,650 $3/SF allowance added not knowing what scope is. Can be $3,000 adjusted as necessary. Added $1,000 per tree to replace what was removed. Assumes larger trees planted. Could be reduced if smaller trees are $40,000 acceptable. $43,000

$0

$0

$150.00

G2050.115 Stacked Limestone Retaining Walls

3,861.

Lump sum to demo trees, demo existing utilities and demo street section. Assumes natural gas line is cut and capped by Xcel at not $30,000 cost per their franchise agreement with the City. Temporary tree protection and extra SWPPP measures since we are $15,000 directly adjacent to the Regional Park. $45,000 Assumes 12' space with average height of 15ft to sound bedrock. If this moves forward, design team should engage a deep foundation $109,375 subcontractor to equipment access needs. Assumes 12' spacing with 15ft average height. 12"x12" square $262,500 encasement assumed.

$0 108.

$16,200

$0

1.

Assumes hand demo to protect adjacent. Includes 4 laborers x 40 hrs x $70/hr plus $10k materials/equipment. Assumes 1 day scaffold setup and safety, 3 days hand demo and 1 day cleanup. Assumes hand demo to limit risk of excessive damage. This is the wall at the southern end of the creek at Park C. We are assuming this would be concrete to ensure a good seal between the end of creek and piping structure. Concerned with water migration and long term stability if this was left as stacked stone or weather limestone. Concrete stairs at dimensions shown. Assumes thickened edge, not full frost footings. Grey concrete. Assumes salvaged stacked limestone per detail. I am uncertain how fractured the top several feet are as we get closer to the regional park, so I assumed reconstructed stacked limestone in lieu of carved limestone. A $20k allowance was added to clad the bedrock at the reconstructed falls itself. Its noted on plans, but uncertain what scope is.

$0 $16,200 $30,000 Lighting allowance. $0 Remove and reinstall existing fence.

Printed on: 6/11/2020 @ 8:32 AM


Ford Site - Alternate MRB Crossing - Concept Pricing Saint Paul, MN Job #: 5069-xxx Alt #1 L4

Component Description

G2060.225 Guard Rail G2060.295 Site Furnishings

PRICE

u/m

QTY

Cost

$40.00 $7,500.00

lf ls

110.

$1.00 $1.00 $700.00 $1.00

ls ls cy ea

G3030.190 Storm Sewer - 84" Diameter Drainage Structure

$10,000.00

ea

G3030.200 G3030.200 G3030.210 G3030.210 G3030.210 G3030.210 G3030.220

$20,000.00 $250.00 $5,000.00 $5,000.00 $28.00 $5.00 $15.00

G3030.150 G3030.160 G3030.170 G3030.180

Storm Sewer - DOBO Structure - Supply Storm Sewer - DOBO Structure - Installation Storm Sewer - DOBO Structure - Footing Storm Sewer JS-09- Skimmer Structure

Storm Sewer - New Drop Structure with Piping Storm Sewer 48" RCP Remove Existing RCP & Manhole Replace & Reroute Catchbasins Storm Piping Bedrock Removal Creek Synethic Liner Creek Sand Section

G3030.230 Creek Channel Rock Bottom G3030.330 Retention Skimmer & Rip-Rap

Alt #2 Excluding Boardwalk QTY Cost

Hidden Falls South QTY Cost

Comments

113. 1.

$4,520 $7,500 $47,020 $473,711

113. 1.

$4,520 $7,500 $47,020 $294,402

113. 1.

$4,520 $7,500 $47,020 $503,734

113,000. 100,000. 126.39 1.

$113,000 $100,000 $88,472 $1

204,000. 175,000. 162.5 1.

$204,000 $175,000 $113,750 $1

204,000. 175,000. 162.5 1.

$204,000 $175,000 $113,750 $1

90,000. 100,000. 1.

$90,000 $100,000 $0 $1

$0 $0 $0 $0

1.

$10,000

1.

$10,000

1.

$10,000

1.

$10,000

$0

ea lf ls ea cy sf cy

17. . . 80.59 4,128. 76.44

$0 $4,250 $0 $0 $2,257 $20,640 $1,147

1. 17. . . 80.59 4,807. 89.02

$20,000 $4,250 $0 $0 $2,257 $24,035 $1,335

1. 114. . . 540.44 1,440. 21.67

$20,000 $28,500 $0 $0 $15,132 $7,200 $325

193. 1. 2. 457.48 1,100. 20.37

$0 $48,250 $5,000 $10,000 $12,809 $5,500 $306

$0 $0 $0 $0 $0 $0 $0

$10,000.00

ls

1.

$10,000

1.

$10,000

.4

$4,000

.25

$2,500

$0

$1.00

ea

1.

$1 $349,767 $349,767 $733,985

1.

$1 $564,629 $564,629 $1,083,340

1.

$1 $577,909 $577,909 $917,311

1.

$1 $284,367 $284,367 $833,101

$0 $0 $0 $1,287,425

$1,072,619

$1,287,425

$150,000.00

ls

1.

$150,000 $150,000 $1,866 $1,866 $151,866 $126

X1090.125 Project Related Software

0.16%

%

1,166,528.74

X5010.115 Sitework (excav / fndtn / Landscape / paving / utilities) Terrorism / Flood Zone / Earthquake / Misc << click to open zone/tier details X5010.120 Non-Terrorism Zones X5010.121 Flood Zone 1 X5010.130 Liability Insurance & Added Performance Bond Costs

$0.043

yr

2,954.58

2.00% $0.070 2.05%

% yr %

125.57 8,113.73 1,350,150.46

$3 $568 $27,678 $28,374

X7010.100 Construction Contingency (means and methods) X7010.115 Inflation Adjustment

10.0% 3.0%

% %

1,211,747.92 1,211,747.92

$121,175 $36,352 $157,527

X8010.100 St. Paul. Permit Fee Structure effective 02/24/20 X8010.110 Plan Check / Review Fee X8010.120 MN State Surcharge effective 06/24/15 / updated 03/06/17

$1.00 65.0% $1.00

ls % ls

9,190.01 9,190. 653.78

$1,399,774

1. 1,692,466.33

5,075.26

$4 $790 $38,481 $39,490

1,682,769.23 1,682,769.23

$168,277 $50,483 $218,760

7.0%

%

1,318,376.05

$1,132,819

1. 1,369,691.54

5,096.55

$4 $654 $31,851 $32,726

1,393,698.09 1,393,698.09

$139,370 $41,811 $181,181

$11,715 $7,615 $870 $20,200

1. 1,296,903.54

3,061.46

$3 $623 $30,356 $31,112

1,328,509.44 1,328,509.44

$132,851 $39,855 $172,706

$10,166 $6,608 $737 $17,511

1.

1. 1,556,625.57

324.43

13.79 9,917.59 1,650,319.45

$31,112

$181,181 10,165.79 10,166. 737.31

$150,000 $150,000 $2,075 $2,075 $152,075 $130

130.11 8,898.73 1,480,777.48

$32,726

$218,760 11,715.22 11,715. 869.94

$150,000 $150,000 $2,192 $2,192 $152,192 $217

216.6 9,337. 1,553,706.29

$39,490

$157,527 $9,190 $5,974 $654 $15,817

$150,000 $150,000 $2,708 $2,708 $152,708 $216

215.7 11,280.47 1,877,105.51

$28,374

Y1010.105 Construction Overhead & Profit

Alt #4 Excluding Boardwalk QTY Cost

$4,400 $0 $39,400 $339,217

$964,791

X1010.002 General Conditions/Requirements (Costs / month)

Alt #3 Excluding Boardwalk QTY Cost

$9,816 $6,380 $707 $16,904

Lump sum allowance for items such as project management time, $75,000 field staff time, temp fencing, permits, sureties, etc. $75,000 $2,491 $2,491 $77,491 $14

$0 $694 $33,832 General Liability and Performance and Payment Bond $34,540 $148,005 Construction Contingency $44,402 Inflation assuming scope occurs in 2021. $192,407 $192,407

10,627.5 10,628. 776.83

$10,628 Estimated permit fees. $6,908 $777 $18,313

$15,817

$20,200

$17,511

$16,904

$18,313

$353,585

$431,158

$383,609

$372,796

$322,750

$1,318,376

$1,830,932

$1,516,428

$1,445,415

$1,610,175

$92,286 $92,286

1,830,931.83

$128,165 $128,165

1,516,427.84

$106,150 $106,150

1,445,415.4

$101,179 $101,179

1,610,175.02

$112,712 $112,712

$92,286

$128,165

$106,150

$101,179

$92,286

$128,165

$106,150

$101,179

$112,712

$1,410,662

$1,959,097

$1,622,578

$1,546,594

$1,722,887

Page 2 of 2

Contech supply only. Bolander installation only. Assumes pouring footings directly on bedrock. Assumes this the existing skimmer at south end of Park C Assumes this is a new structure to connect CP Rail and neighborhood to the new channel. New drop structure and piping for MRB catch basin. Added cost for bedrock removal for piping installation to new tunnel. Assumes existing RCP, so no added cost. Demo existing Remove, replace and reroute existing catch basins. Added bedrock removal for new storm piping routing. Synthetic liner per detail. Sand section above liner. Allowance to place unused limestone not needed for wall sections as creek bottom rock section. Assumes this is an existing structure previously installed as part of Ford stormwater system.

$34,540 1,480,054.11 1,480,054.11

$172,706 9,815.88 9,816. 707.36

$0 Furnish and install new guard rail. $7,500 $37,500 $98,350

$112,712


July 8, 2020 Board Meeting V. Action Item A) Approve Minutes of June 17, 2020 Regular Board Meeting (Sylvander)

Regular Meeting of the Capitol Region Watershed District (CRWD) Board of Managers, for Wednesday, June 17, 2020, 6:00 p.m. (Regular Meeting) via telephone and/or the web-based application Go To Meeting.

REGULAR MEETING MINUTES I.

A)

Call to Order of Regular Meeting (President Joe Collins)

Managers Joe Collins, remote Seitu Jones, remote Shawn Murphy, remote Rick Sanders, remote Mary Texer, remote

B)

Staff Present Mark Doneux, CRWD Anna Eleria, CRWD - remote Forrest Kelley, CRWD – remote Rachel Funke, CRWD - remote Michelle Sylvander, CRWD - remote

Public Attendees

Review, Amendments and Approval of the Agenda.

Motion 20-109: Approve the Agenda of June 17, 2020 with no changes. Murphy/Sanders Unanimously Approved II.

Public Comment

No public Comments. III.

Permit Applications and Program Updates A) 12-023 Ford Site Demolition - Closeout (Hosch)

Mr. Kelley stated permit # 12-023 Ford Site Demolition is complete. No permanent stormwater treatment was required for this portion of the project, as no impervious surface was being added or reconstructed. The site is currently undergoing mass grading activity through CRWD Permit #20-009. Final site stabilization will be ensured through permit #20-009. The $134,000 surety was replaced by the current owner, Ryan Companies, and will be held to meet Motion 20-110: Approve Certificate of Completion for permit #12-023, Ford Site Demo.


Murphy/Sanders Unanimously Approved B) 20-013 Ford Site Alternative Permit Process (Kelley)

Mr. Kelley reviewed permit #20-13 Ford Site Alternative Permit Process. Ryan Companies purchased the 122 acre Ford Site property in St. Paul. The property was transferred from Ford Motor Company to Ryan, and 30% design plans were reviewed by CRWD in January. Sixty percent design drawings were submitted on January 21st, 2020. Final stormwater design plans are currently under review, and CRWD staff expect to issue Rule C permits at the July 8th Board Meeting. The scale, complexity and duration of the project necessitate a modified approach to issuing permits for stormwater management and erosion and sediment control. Coordination with City department review, approval, inspection and close out will be critical to minimize potential conflicts and duplication. CRWD staff discussed the proposed process to break the 122acre site into 10 individual permits to increase flexibility. Erosion Control: Permit 12-023 Ford Site Demolition. Transferred to Ryan on 1/17/2020 and provides for surface demolition, stockpiling of materials, and minor grading for retaining wall removal. $134,000 surety check was received from Ryan, and a surety return check was issued back to Ford for the same amount. This was based on 67 acres of land disturbance. Does not include approval for site mass grading or utility installation work. Permit closeout requested by staff on 06/17/2020. Permit 20-009 Ford Site Mass Grading. Issued 05/01/2020 for mass grading of the site in preparation for utilities, right of way improvements, and building sites. Additional surety of $110,000 ($244,000 total) was submitted by Ryan Companies for the expanded land disturbance beyond the original 67 acres for plant demolition. Erosion control sureties can be returned in phases consistent with the Stormwater Management permits described in the section below. All work within permitted drainage areas must be complete for this surety to be returned. Stormwater Management: Permits 20-013A through 20-013H. Stormwater Management permits will be broken into 8 smaller areas based on drainage boundaries to site BMPs as shown in the attached exhibit. These permits will be issued concurrently, but closeout will be phased based on completion of each area. Surety will be collected at $5,000/acre of the impervious surfaces within the public Right of Way, Parks, and privately owned civic spaces. Surety will be returned upon completion of all Parks and ROW, and a combination of all private parcels achieving temporary stabilization, and/or gaining coverage under a new permit for which a separate surety has been collected. Permit 2X-0XX. Individual stormwater and erosion control permit for private development parcels will be applied for, reviewed, and approved following the standard permit application process. Surety will be collected at $5,000/impervious acre impervious and returned upon confirmation of completion and BMP function. Wetland Management Permit


Permit 20-015 Ford Site Redevelopment Wetlands. Approved at the 06/03/2020 Board Meeting, this permit covers wetland impacts and the required 2:1 mitigation. A surety of $37,986 will be collected as part of the financial assurances required by WCA and the City when wetland impacts are proposed to occur prior to beginning construction on wetland replacement. Surety will be returned upon completion of the required monitoring period documenting successful establishment of wetland hydrology and vegetation. Motion 20-111: Authorize Staff to Implement the Ford Site Alternative Permit Process Murphy/Sanders Unanimously Approved C) 20-013 Ford Site Stormwater Management Plan 60-Day Review Period Extension (Kelley) The current review period for Permit 20-013 Ford Site Stormwater Management Plan expires on June 19th, 2020. The applicant requested an extension to the 60-day review period prior to the expiration. Staff will review and request permit approvals at the July 8th Board Meeting. Motion 20-112: Approve 60-day Review Period Extension for Permit 20-013 Ford Site Stormwater Management Plan to expire August 18, 2020.

Murphy/Sanders Unanimously approved D) 20-016 Ayd Mill Road (Kelley) Mr. Kelley reviewed permit #20-016 Ayd Mill Road. The applicant, The City of St. Paul proposed work include mill and overlay of Ayd Mill Road, storm sewer improvements, and the construction of a 12’ trail throughout the corridor. The applicable rules are Stormwater Management (Rule C), Erosion and Sediment Control (Rule F). The disturbed area of this project is 3.75 acres with 2.09 acres impervious surface.

Motion 20-113: Approve withdrawal of 8,345 cubic feet of credits from the Public Works Volume Reduction Bank. Murphy/Sanders Unanimously approved Manager Texer asked about a creek bed in need of daylighting. Mr. Kelley replied that yes, there was a creek located near the adjacent rail road, but daylighting opportunities are not being explored as part of this project.

Motion 20-114: Approve permit # 20-016 Ayd Mill Road with 1 Condition. 1. Provide a copy of the NPDES permit. Murphy/Sanders Unanimously approved


IV.

Special Reports – Trout Brook Nature Sanctuary (Fossum)

Mr. Fossum provided a review of the Trout Brook Nature Sanctuary. The final steps of the project have just been completed with the lift station. Mr. Fossum reviewed a timeline with the project starting in 2004. Mr. Fossum reviewed photos of the area prior to the project development. The area was heavily contaminated from years of use by the railroad. The area is now used by numerous groups such as MN Dragon Fly Society, Great River Greening, and numerous school groups. The 42 Acre park has three iron enhanced filtration basins and a 3,000-foot stream channel. President Collins commented about the 2010 watershed plan included Bring water back to the surface and how this project demonstrates and achieves this goal. V.

Action Items A)

AR: Approve Minutes of the June 3, 2020 Workshop and Regular Meeting (Sylvander)

Motion 20-115: Approve the Minutes of the May 20, 2020 Regular Meeting. Murphy/Sanders Unanimously approved B)

AR: Approve Accounts Payable/Receivables of May (Sylvander)

Motion 20-116: Approve May 2020 Accounts Payable/Receivable and Budget Report and direct Board Treasurer and President to endorse and disperse checks for these payments. Murphy/Sanders Unanimously approved C)

AR: Approve MS4 Annual Report of 2019 (Funke)

Ms. Funke reviewed the Trout Brook Interceptor. As a regulated operator of a small municipal separate storm sewer system (MS4), CRWD is required to prepare and submit an annual report of activities and accomplishments associated with its stormwater pollution prevention program (SWPPP) by June 30th to MN Pollution Control Agency (MPCA). CRWD must solicit public comment on the MS4 annual report and hold an annual public meeting to present the SWPPP activities and accomplishments made in the previous year. The June 17th Board meeting serves as CRWD’s annual public meeting for its SWPPP. Ms. Funke provided a brief presentation of CRWD’s stormwater management accomplishments and accepted comments from the public. Any comments received at the meeting or in writing by June 28th will be considered and if appropriate, incorporated into the annual report.

Manager Murphy asked about illicit discharge that were identified in the report. Mr. Kelley responded with examples that he could recall. Manager Murphy inquired about stop work orders that were issued. Mr. Kelley responded that the permitting department completed 1,048 inspections in 2019. When the applicant does not respond to noncompliance issues a stop work order is issued. Mr. Kelley added that only few stop work orders have been issued.


Motion 20-117: Authorize Administrator to submit CRWD’s MS4 Annual Report for 2019 and to reasonably incorporate comments received during the public comment period. Murphy/Sanders Unanimously approved D)

AR: Approve TBI Work Order No.14 for TBI Repairs St. 28+65 to 50+72 (Eleria)

Mr. Eleria reviewed CRWD’s 11-year capital improvement plan (CIP) for TBI identifies two major CIP repairs in sections of tunnel that are in fair to poor condition. The first CIP project involves addressing areas with deteriorating concrete and exposed reinforcement, sealing holes, cracks and fractures, and removal of sediment in over 2,200 feet of tunnel near Phalen Boulevard and I-35E in Saint Paul. The estimated construction cost is $1,040,000. Barr Engineering prepared draft work order for designing repairs from TBI Station 28+65 to 50+72. The tasks include pre-design in-tunnel inspection to determine the estimated quantities for each type of repair, designing the tunnel repairs, estimating construction cost, preparing bidding/contract documents, and administrating the bidding process. Barr will utilize and modify where feasible existing repair details and specifications from previous TBI projects for the specific TBI profile, cross section and project conditions. The estimated engineering cost is $82,845. The 2020 budget for TBI Repairs is $566,250. Ms. Eleria shared an anticipated schedule for the entire project: 1) design of repairs from July – Dec. 2020; 2) bidding in late winter 2021; and 3) construction in fall 2021/winter 2022. President Collins asked for clarification of the location. Ms. Eleria replied that it is located just south of the new realignment work done in 2013. Motion 20-118: Approve TBI Work Order No. 14 in an amount not to exceed $82,845 and authorize Administrator to execute TBI Work Order No. 14 and amendments not to exceed $8,300. Murphy/Sanders Unanimously approved E)

AR: Approve St. Paul School of Northern Lights Stewardship Grant (Eleria)

Ms. Funke reviewed The St. Paul School of Northern Lights is seeking a $28,550 grant award from CRWD toward the development of clean water practices on their site. The St. Paul School of Northern Lights is located in the West 7th Neighborhood of Saint Paul, at 426 Osceola Ave S. The proposed project includes removing five parking stalls and replacing with a 750 square foot curb-cut rain garden that will capture 21,869 square feet of parking lot runoff annually. CRWD and RCD have provided a watershed analysis and developed construction site plans for the proposed rain garden. The 750 square foot rain garden will include two curb-cuts with pretreatment devices. The rain garden is sized to capture and infiltrate 0.6” rain events from the School’s parking lot. The rain garden will capture 11,146 cubic feet of water per year (a 73% reduction). Total suspended solids and total phosphorus will be reduced by 72% and 73%, respectively. The contractor estimates a project cost of $30,053.00. Using the Stewardship Grant Calculator, staff have calculated a total CRWD award not to exceed $28,550. This grant award is reflective of the water quality benefit this project would provide. CRWD also plans to provide educational signage for the rain garden. A minimum 5% match is required for non-profit grant applicants. The School will cover the remaining costs of the project.


Motion 20-119: Approve a grant award to the St. Paul School of Northern Lights for an amount not to exceed $28,550 and authorize the District Administrator to execute the grant agreement. Murphy/Sanders Unanimously approved Unfinished Business A)

George Floyd Statement (Doneux)

Administrator Doneux reviewed a statement for George Floyd to be posted on the website. Capitol Region Watershed District remembers George Floyd and stands with our Black staff, board members and residents against racism. Like many of you, we’re grieving, listening, and continuing to work towards a world that is equitable and just.

Manager Jones and Manager Sanders thanked Administrator Doneux and staff for putting together the statement. President Collins shared his appreciation for staff taking initiative in creating the statement and work on a diversity and inclusion plan. B) VI.

2021 Budget Update (Doneux)

General Information

Administrator Doneux provided a review of the 2021 budget. A detailed budget will be reviewed at the July 8th workshop. A) Board of Manager’s Updates Manager Murphy acknowledged Manager Jones for an article in the Star Tribune regarding a portrait of George Floyd that Manager Jones posted on his website that has gone virial. Trees along University Avenue were burned during rioting. CRWD staff are working with Ramsey County on getting the damaged trees replaced. Ms. Funke added that the raingardens were surprisingly in very good condition. Many volunteers have been out cleaning up trash and debris. A Community Meeting is planned for Thursday, June 18th at 1:00 PM regarding the watershed management plan. VII.

Next Meetings A) Wednesday, July 8, 2020 5:00 PM – Board Workshop - budget B) Wednesday, June 22, 2020 6:00 PM – Regular Board Meeting

VIII. Adjournment Motion 20-120: Adjournment of the June 17, 2020 Regular Board Meeting at 7:35 P.M.


Murphy/Sanders Unanimously approved Respectfully submitted, Michelle Sylvander


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.