Portfolio by Michail Bradinoff

Page 1

Sa mp l e Po r t fol i o

by

M i c h a i l Bra d i n of f

1


1.

2.

3.

Mixed use block in India

Street Pavillion

CinemaLab

Unlocking the potential of Calicut as a social network

renovation of small alley in St Davids

cinema & theatre house in St Davids

4.

5.

6.

Tree House

Work at LAGADO Architects

Llandaff Museum

team competition entry

fine art gallery in Llandaff

Content 2


Mixed use block in Kerala, India My final year design project was set in Calicut, India. Based on a literature review I developed a manifesto on the concept of social capital and its relationship to the cities we build. In the second stage, as a group we set out to identify the various issues Calicut is facing and gathered plenty of secondary data prior to our study trip to India. During our time there I actively participated in organising a debate on social capital, designing and distributing a social survey, and extensive mapping, sketching, interviewing and 3d scanning. We then analysed the identified issues and their interdependence to lay the foundation for a developed urban strategy. My specific focus was on hampering the uncontrolled urban sprawl through proposed land-use policies and identifying potential streets for pedestrianization using mathematical algorithm Space Syntax. Finally, I proposed a high-rise mixed use housing block, the design of which is to serve as a prototype for future developments and thus a catalyst for the wider city strategy. The building was imagined as funded by a local housing cooperative which was reflected in the design, incorporating a public ramp as a primary circulation route, modularity allowing adaptability, and fragmented volumetric aesthetics to harmonize with the eclectic Indian context. The project was chosen to represent the university work in the annual Dezeen publication. (link in CV)

3


4


500

6,000 GSEducationalVersion

3 bedroom apartments

1 bedroom apartments

2 bedroom apartments

commercial units

GSEducationalVersion

GSEducationalVersion

Design strategies: Social Capital and Streets in the sky 5


Section through courtyard 6


Design development: Public and Private 7


Section in perspective 8


1.8 km

0.65 km

1888

east-west orientation

veranda space at the entrance

3 km

1960 - 2000

internal courtyards

2000 -

louvers on internal walls

projecting roof eaves

‘‘roof ear’’

Analysis - the growth of Calicut and traditional Keralan architecture 9


Filmmaking: Tales from a rickshaw We were asked to create a 10-minute video presenting the unit’s goals and the work we had done throughout the year. I took the lead on this project after winning an internal competition based on initial ideas. My main idea was to present the issues in a more legible way that people outside of the architectural discipline could understand, unlike what had been done in previous years. As a result, the key concept revolves around presenting the challenges we identified in Calicut from the perspective of the common man - or the ultimate recipient of all issues we are discussing. The entire film is narrated by a rickshaw driver, which also allows for a visual introduction to the city from a street point of view, often lacking in produced diagrams. The script is divided into five sections, each of which introduces different issues that we have been focusing on. As team lead, I delegated tasks based on individuals’ skills, managed equipment usage, and planned the shooting schedule during our stay in Calicut. Despite a few concept adjustments, we successfully adapted to changing conditions and met our timeline. Watch the full film at:

drive.google.com/drive/u/1/folders/1RVHbO3X1rCy7-2xG-SaTUySeN-IviVAy

Movie: Tales from a Rickshaw 10


Social Capital and the City 11


35

100 wall tie metal element

52

wall tie metal element

200

400 brickwork support bracket

reinforced concrete column 100x100

reinforced concrete column 100x100

500

150

brickwork support bracket

GSEducationalVersion

0.5

0

300

0 GSEducationalVersion

GSEducationalVersion

Axonometric diagram of Elevated Street, Detail Sections 12


East elevation of propsal and consequent simillar developments 13


Street Pavilion small-scale urban intevention in St Davids The proposal celebrates the freedom of walking throughout the urban area of St Davids by converting a narrow alley in the city into a multi-levelled pavilion. The small intervention introduces a few elevated paths and spaces, which look over the urban street – this way, unlocking the area and creating an improvised stage.

Section & Axonometric view 14


CinemaLab cinema and theatre house in St Davids The proposal picks up on the themes explored in the Street Pavillion and investigates them on a larger urban scale, celebrating the freedom, spontaneity and surprises we experience when walking on the street. The design creates a Cinema and Theatre House which pays respect to the traditional architecture of St Davids, but also captures the peculiar colorful unconventionality of the cinema.

Physical models 15


Ground floor plan 16


Perspective view 17


Architecture is created, ‘invented anew,’ by each man who attempts her, who roams her space, climbs a stair, rests on a balustrade, lifts his head to look, open, close a door, who sits down or gets up and makes intimate contact with—and at the same time create ‘forms’ in—the space. Lina Bo Bardi

Exploded axonometric view 18


Competition entry: Treehouse After my second year of university, my colleague and I entered an architectural competition. Working together we developed a concept and design, responding to the brief which asked us to design a treehouse in proximity to a historic castle in France. Embedded in the immediate green surroundings of an imposing ancient castle the two modules, required by the competition, compile another Castle themselves. A simple combination between the towers of the Castle and the almost naive composition of playful colours, evokes nostalgic memories of times of simple days, filled with hiding in nature, building blanket forts and having the whole world to explore. The semi-transparent roof fully wrapped around the structure, combined with the hanging piece of fabric, full of vibrant colours just underneath it, create an abstract atmosphere, where the experience is highly personal and lets one pleasantly remember about the days of games and freedom. This sense of liberty is increased by the many interactive elements introduced in the construction, like the long curtains, hanging roof and rolling balcony, cover, creating architecture not frighteningly perfect, but spontaneously inviting and casual.

19


Detail Study and Exploded axonometric view of tree house 20


House in Schiedam

Impressie 1

Impressie 2 Design Development, Ground floor plan, Diagram

ONTWERPCONCEPT 22-02-2022

ONTWERPCONCEPT 22-02-2022

Begane grond

plattegrond

ONTWERPCONCEPT 22-02-2022

lagadoarchitects.com/portfolio/gateway-house/

Ontwerpconcept 3 poorten, steeds smaller 21


Pakketopbouw dak hellend

Pakketopbouw voor- en achtergevel metselwerk

houten balklaag in het zicht daartussen houten plafond isolatie RC 6,3 dakbedekking EPDM groen vegetatiedak (optigrun natuurdak o.g.) zonnepanelen met dummypanelen in hoeken indien benodigd maar liever zonder!

kalkzandsteen 120 mm isolatie RC 4,7 geventileerde spouw steens metselwerk buitenblad Hagemeister Weimar dunformaat (DF) 240 x 52 x 115 mm

Pakketopbouw dak plat uitbouw

House with a lift

Pakketopbouw zijgevels metselwerk

breedplaatvloer gereduceerde constructieve dikte isolatie RC 6,3 dakbedekking EPDM groen vegetatiedak (optigrun natuurdak o.g.)

5

4

3

2

1

betonnen onderste deel wand met daarop HSB wandelementen c.f. opgave constructeur buitengevelisolatiesysteem drukvaste isolatie RC 4,7 cementgebonden watervaste plaat keramische steenstrips verlijmd Hagemeister Weimar dunformaat (DF) - 240 x 52 x 115 mm lintvoeg 8 mm - lagenmaat 60 mm steen + voeg stootvoeg 10 mm koppenmaat 250 mm strek + voeg tegelverband

Pakketopbouw tweede verdiepingsvloer

lagadoarchitects.com/portfolio/wheelchair-house/

breedplaatvloer gepolijst beton afbouwpakketdikte 70 mm met vloerverwarming

lagadoarchitects.com/portfolio/wooden-house/

Pakketopbouw dak hellend

265

Pakketopbouw voor- en achtergevel metselwerk

5

145

A

houten balklaag in het zicht daartussen houten plafond isolatie RC 6,3 dakbedekking EPDM groen vegetatiedak (optigrun natuurdak o.g.) zonnepanelen met dummypanelen in hoeken indien benodigd maar liever zonder!

kalkzandsteen 120 mm 5 035 isolatie RC 4,7

1 800

5 335

KK NEER 16

1

15

2

0.4 | VR Opp: 29,60 m2

0

13

4

12 11 0

5

WC

7891

0.2 | BR Opp: 1,71 m2

6

5 5 240

5

D

Pakketopbouw dak hellend

Pakketopbouw voor- en achtergevel metselwerk

houten balklaag in het zicht daartussen houten plafond isolatie RC 6,3 dakbedekking EPDM groen vegetatiedak (optigrun natuurdak o.g.) zonnepanelen met dummypanelen in hoeken indien benodigd maar liever zonder!

0

Pakketopbouw begane grondvloer

10000 3. Dak

kalkzandsteen 120 mm isolatie RC 4,7 geventileerde spouw steens metselwerk buitenblad Hagemeister Weimar dunformaat (DF) 240 x 52 x 115 mm

Pakketopbouw dak plat uitbouw

Pakketopbouw zijgevels metselwerk

breedplaatvloer gereduceerde constructieve dikte isolatie RC 6,3 dakbedekking EPDM groen vegetatiedak (optigrun natuurdak o.g.)

1

betonnen onderste deel wand met daarop HSB wandelementen c.f. opgave constructeur buitengevelisolatiesysteem drukvaste isolatie RC 4,7 cementgebonden watervaste plaat keramische steenstrips verlijmd Hagemeister Weimar dunformaat (DF) - 240 x 52 x 115 mm lintvoeg 8 mm - lagenmaat 60 mm steen + voeg stootvoeg 10 mm koppenmaat 250 mm strek + voeg tegelverband

Pakketopbouw tweede verdiepingsvloer breedplaatvloer gepolijst beton afbouwpakketdikte 70 mm met vloerverwarming

2

1

2 7000

Voorgevel Zuidgevel

GSPublisherVersion 303.90.90.100

project Rolstoelwoning Grote Hondring Kavel A3

opdrachtgever Iverna en Armin

fase DO

formaat A3

datum

schaal 1:50

wijzigingsdatum

tekeningnummer

ABCD-

Voorhaven 23 C 3025 HC Rotterdam

3000 0

2

DEFINITIEF ONTWERP

740

365

145

Stompe deuren met uitzetscharnieren

2. verdieping

1. verdieping

1

Begane Grond koffie bar 900 hoog 600 diep

14

3

plantenbak aluminium gemoffeld in kleur bruin als kozijn, n.t.b.

leefkeuken

stalen trap 900 mm breed optrede 187,5 mm aantrede 220 mm gespoten in kleur n.t.b.

Kalkzandsteen 100 mm

betonnen heipalen (door gemeente) + extra t.b.v. uitbouw funderingsstroken geisoleerde ribbenvloer tegels en lamelparket, afbouwpakketdikte 70 mm met vloerverwarming

Stompe deuren met uitzetscharnieren

OP

pakket postbus

6000

Uitgangspunten binnenwanden

Pakketopbouw vloeren tegels breedplaatvloer tegels afbouwpakketdikte 70 mm met vloerverwarming spiegel

Kalkzandsteen 100 mm

betonnen heipalen (door gemeente) + extra t.b.v. uitbouw funderingsstroken geisoleerde ribbenvloer tegels en lamelparket, afbouwpakketdikte 70 mm met vloerverwarming

b.k. terrasvloer 10-P

Eigen tekst

1 661

2 145

c.f. kavel A4 na te gaan i.h.w.

Uitgangspunten binnenwanden Pakketopbouw vloeren tegels breedplaatvloer tegels afbouwpakketdikte 70 mm met vloerverwarming

Pakketopbouw begane grondvloer

Pakketopbouw gevel houten paneel tussen kozijnen kalkzandsteen 120 mm of onderdeel van kozijn isolatieentree RC 4,7 tegels op 0.1 | VKR P = 0 = NAP keramische cementgebonden watervaste Opp: 6,50 m2 ca. 0,20 + M.V.plaat

kalkzandsteen 120 mm of onderdeel van kozijn isolatie RC 4,7 keramische tegels op cementgebonden watervaste plaat

3 380

C

Pakketopbouw vloeren parket

Pakketopbouw gevel houten paneel tussen kozijnen

breedplaatvloer tegels en lamelparket, afbouwpakketdikte 70 mm met vloerverwarming

620

3 224 5 710

6 000

1 980

breedplaatvloer gepolijst beton afbouwpakketdikte 70 mm met vloerverwarming

breedplaatvloer tegels en lamelparket, vl. lk. afbouwpakketdikte 70 mm met vloerverwarming

7000 goot

Pakketopbouw tweede verdiepingsvloer

betonnen onderste deel wand met daarop HSB wandelementen c.f. opgave constructeur buitengevelisolatiesysteem drukvaste isolatie RC 4,7 cementgebonden watervaste plaat woonkamer keramische steenstrips 0.3 | VR verlijmd Hagemeister Weimar 2dunformaat (DF) - 240 x 52 x Opp: 22,81 m 115 mm lintvoeg 8 mm - lagenmaat 60 mm steen + voeg stootvoeg 10 mm koppenmaat 250 mm strek + voeg tegelverband

keukenblad 750 mm hoog ondiepe spoelbak geen onderkastjes 700 mm diep

760

B

V

breedplaatvloer gereduceerde constructieve dikte isolatie RC 6,3 dakbedekking EPDM groen vegetatiedak (optigrun natuurdak o.g.)

kastenwand plafondhoog inbouwkoelkast indeling n.t.b.

1 875

3. Dak

lift Thyssen type n.t.b. sparing 1680 x 1800 mm

Pakketopbouw zijgevels metselwerk

keukenblad 900 mm hoog inductiekookplaat onderkastjes bovenkastjes 700 mm diep

Pakketopbouw vloeren parket

490

740 Pakketopbouw dak plat uitbouw

10000

265

geventileerde spouw steens metselwerk buitenblad Hagemeister Weimar dunformaat (DF) 240 x 52 x 115 mm

Pakketopbouw vloeren parket

Pakketopbouw gevel houten paneel tussen kozijnen

breedplaatvloer tegels en lamelparket, afbouwpakketdikte 70 mm met vloerverwarming

kalkzandsteen 120 mm of onderdeel van kozijn isolatie RC 4,7 keramische tegels op cementgebonden watervaste plaat

goot

+31 - (0)6 54 600 440 www.lagadoarchitects.com victor@lagadoarchitects.com

Uitgangspunten binnenwanden

6000

Pakketopbouw vloeren tegels breedplaatvloer tegels afbouwpakketdikte 70 mm met vloerverwarming

Kalkzandsteen 100 mm Stompe deuren met uitzetscharnieren

2. verdieping

DEFINITIEF ONTWERP

0 0. begane grond

project Rolstoelwoning Grote Hondring Kavel A3

opdrachtgever Iverna en Armin

fase DO

formaat A3

datum

schaal 1:50

wijzigingsdatum

tekeningnummer

Pakketopbouw begane grondvloer betonnen heipalen (door gemeente) + extra t.b.v. uitbouw funderingsstroken geisoleerde ribbenvloer tegels en lamelparket, afbouwpakketdikte 70 mm met vloerverwarming

3000 1. verdieping

ABCD-

1 875

A

1 980

B

Voorhaven 23 C 3025 HC Rotterdam

2 145

C

0

1

2

Langsdoorsnede B DEFINITIEF ONTWERP

+31 - (0)6 54 600 440 www.lagadoarchitects.com victor@lagadoarchitects.com

0 0. begane grond

project Rolstoelwoning Grote Hondring Kavel A3

opdrachtgever Iverna en Armin

fase DO

formaat A3

datum

schaal 1:50

wijzigingsdatum

tekeningnummer

ABCD-

D

Voorhaven 23 C 3025 HC Rotterdam

+31 - (0)6 54 600 440 www.lagadoarchitects.com victor@lagadoarchitects.com

GSPublisherVersion 303.90.90.100

Front Elevation, Ground floor plan, Section 22


Roof Extension: House in a house lagadoarchitects.com/portfolio/zwaanshals-witte-zwaanhof-and-zaagmolenstraat/

13880

0

3. Dak

1

2

11380 3. Dak

8880 3. Dak

5920 2. verdieping

2960 1. verdieping

0 0. Begane Grond

0

1

2

Conceptual sketch, Old & new elevations, Proposed plans, Proposed section 23


Art Galley in Llandaff The gallery contains a series of pavillions each designed to house a specific work of art specified in the brief.

Beethoven ‘’Moonlight’’ sonata room 24


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.