“The task of implementing the sprawl-

2nd phase expansion. Similarly the CPP

♦ Foreign investment approval was

ing NALCO projects was enormous. Given

production capacity was raised to

accorded by Govt. of Indonesia in Sept’08

the time frame for construction and com-

1080MW in Aug’09 from 960 MW with

for setting up smelter and power plant in

missioning the units, with their multi-

start of commercial production of power

South Sumatra.

locations and multi-disciplines like min-

from one expansion unit of 120MW,” said

ing, chemical engineering, metallurgy

Srivastava.

Mineral and Metal (RMMI) of U.A.E. in

Other Ongoing Projects

Dec’08 to be minority partner (24per cent

and power generation, it required a high degree of planning and systematic monitoring. At the time of the formulation of

UTKAL – E (Project cost Rs.215 crore)

the Project, some of the best brains from

♦ The Company has been allotted a 70

within the Aluminium industry were given

mln TPA capacity coal block in Talcher

♦ MoU signed with Ras Al Khaimah

stake) in Smelter and Power Project. Coal Mine in Indonesia MoU signed in June’08 with SUGICO

NALCO HAS SUBSEQUENTLY COMPLETED TWO MAJOR EXPANSION RS. 8000 CRORE TO DOUBLE ITS ALUMINIUM ANNUAL CAPACITY FROM 2.30 LAKH TONNES TO 4.60 LAKH TONES. NALCO IS ALSO THE FIRST PUBLIC SECTOR IN THE COUNTRY TO VENTURE INTO INTERNATIONAL MARKET IN A BIG WAY. IN FACT, EXPORTS ACCOUNT FOR ALMOST 50% OF THE COMPANY’S SALES TURNOVER.

PROJECTS AT AN INVESTMENT OF

- A K SRIVASTAVA, CMD, NALCO

the task to prepare a blue print for the

coal fields by Min of Coal, GoI. For En-

growth of Aluminium industry. The project

vironmental Clearance, a presentation

was to primarily meet the domestic needs

was made before MoEF, New Delhi on

of Aluminium for 4-5 decades,” said

27.11.2008.

Handique.

♦ Other activities like, Mining Lease, land

Nalco signed an MoU with Nuclear

acquisition, rehabilitation and resettle-

Power Corporation of India Limited

ment, forest clearance etc are in full

(NPCIL) on 26th Nov’09 for setting up Nuclear Power Plants in India in JV. An

swing.

investment of Rs 8000 crore envisaged for a Nuclear Power Plant of capacity

Growth Projects (Abroad)

2nd Phase Expansion

South Sumatra for consideration as an independent coal asset. Smelter and Power Plant in Iran ♦ MOU signed with Kerman Development Organisation (KDO) for setting up of 0.31

million tpy Smelter Plant and

Power Plant in Iran in joint venture with ALPHA Co, a KDO group company.

Business Development

1,000MW

Group, a private coal mine owner in

Smelter and Power Plant in Indonesia

Growth Projects (India) Smelter

and

Power

Plant

at

Brajarajnagar Govt. of Orissa approved NALCO’s pro-

The 2nd phase expansion work with a

♦ Feasibility study report for setting up

posal for setting up of a 0.5 million tpy

0.5 million MT Smelter and 1250 MW

Smelter Plant and 1250 MW Captive

project cost of Rs 4402 crore is at the

Power Plant in South Sumatra province

Power Plant in Nov-08 subject to fulfill-

final stage and all set for completion. The

of Indonesia, received in Oct’08. Con-

ment of certain conditions.

Commissioning activities of various units

sultant has suggested two alternative lo-

has already started.

cations in South Sumatra.

“The production capacity of Aluminium

Mines and Refinery in Andhra Pradesh

Smelter was augmented to 4.60 lakh MT

♦ MoU signed in Sept’08 with PT

Govt of AP has accorded the mining

Nusantara Alam Pasifik, a private coal

from 3.45 lakh MT with successful start

lease approval in July’09 for GUDEM &

mine owner in South Sumatra, for sup-

up of all 240 pots by 17th Dec’09, under

KR Konda bauxite deposit having apprx

ply of coal to the proposed power plant.