Wurster Hall Sub-metering (2) - 2010 TGIF Project

Page 1

How low can we go? Wurster Hall Submetering Project

The G een Initiative Fund University of California, Berkeley Eliahu Perszyk Facilities Manager

Gita Khandagle Data Analysis & Layout

350 kW

300 kW

250 kW

ventilation heating kilns ramona’s cafe elevators studio plug loads

thanksgiving

reading/ review/ recitation week final studio reviews

final exams

first day of instruction (spring 2012)

150 kW

last day of instruction (fall 2011)

200 kW

administrative holiday

100 kW

126.7 kW

whole building

ventilation heating

kilns

50 kW

elevators

2.7 kW

7th floor studio 6th floor studio 5th floor studio 4th floor studio

November

December

2.5 kW 2.1 kW 0.8 kW 1.0 kW 1.7kW 6.0 kW

1.8 kW 1.9 kW 0.7 kW 0.8 kW 1.4 kW 3.9 kW

median

minimum

January

372.4 kW 46.4 kW 24.2` kW 9.4 kW 10.9 kW 7.7 kW 7.6 kW 5.8 kW 3.9 kW 11.7 kW 5.2 kW 9.5 kW maximum

Breakdown: Electric Usage Data from November 21, 2011 - January 22, 2012

Summer 2011

Spring 2011

400 kwh 4 ft /min

0 kW 2.8 kW

8th floor studio

25.7 10.6 kW 0 kW 3.9 kW 4.0 kW

0.5` kW

ramona’s

9th floor studio

0

16.8 kW

180.0 kW

Fall 2011

Spring 2012

350 kW 3.5 ft /min 300 kW 3 ft /min 250 kW 2.5 ft /min 200 kW 2 ft /min 150 kW 1.5 ft /min 100 kW 1 ft /min

Spring Break

50 kW .5 ft /min

Thanksgiving

0

January

February

March

Winter Recess

April

May

Whole Building Water & Electric Usage Data from January 22, 2011 to January 22, 2012

June

July

August

September

October

November

December

January


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.