Selected works

Page 1

architecture portfolio

2014

(selected works)

Max Fabris Delft, NL maxfabris@gmail.com (31)0625185788


Max Fabris nationality: Italian/Brazilian address: Vestpoort 9, Delft, NL mobile: (31) 06 25185788 email: maxfabris@gmail.com

EDUCATION 2001-04, Bachelor in Architecture and Urbanism, Universidade de Caxias do Sul, Caxias do Sul, Brazil. 2005-06, Bachelor in rchitecture and Urbanism, Fundação Armando Alvares Penteado, São Paulo, Brazil. 2008-10, Post-Graduation in O projeto de Arquitetura na Cidade Contemporânea, Universidade Presbiteriana Mackenzie, São Paulo, Brazil. 2011-14, Master of Science in Architecture, Urbanism and Building Sciences (MScArch), Technische Universiteit Delft, Delft, The Netherlands.

LANGUAGES Portuguese (native), Italian (upper intermediate), English (full professional proficiency), Spanish (professional proficiency), Dutch (beginner).

SKILLS AutoCAD, 3D Studio Max + V-Ray, Rhinoceros + V-Ray, Adobe Illustrator, Adobe InDesign, Adobe Photoshop, Adobe Lightroom, Corel Draw, Corel Photo-Paint, Revit (beginner).

LICENSED ARCHITECT Brazil (Jan, 2007) The Netherlands (April, 2014)


Experience Founder of Pigeon, Delft, The Netherlands (2013) (2013 - present)

Co-Founder Member of Pool, Rotterdam, The Netherlands (March 2014) (March 2014 - present)

Trainee at TomDavid Architecture, Rotterdam, The Netherlands (March 2011 - November 2011)

Architectural Coordninator at Debora Aguiar & Arquitetoes Associados, São Paulo, Brazil (January 2010 – September 2010)

Architect at Itamar Berezin Arquitetura, São Paulo, Brazil (March 2008 – January 2010)

Junior Architect at Debora Aguiar & Arquitetoes Associado, São Paulo, Brazil (January 2007 – March 2008)

Intern at ENACON / High-Tech, São Paulo, Brazil (November 2006 – January 2007)

Intern at Place Design, São Paulo, Brazil (March 2006 – October 2006)

Intern at Meirelles & Maksoud Arquitetos Associados, São Paulo, Brazil (August 2005 – March 2006)

Intern at Estúdio Arquitetônico, São Paulo, Brazil (March 2004 – December 2004)

Intern at Ricardo Julião Arquitetura e Urbanismo, Caxias do Sul, Brazil (July 2003 – August 2003)


SELECTED WORKS



Expans達o SENGE-RS

2014, Porto Alegre, Brazil

Main entrance view.

THE CHALLENGE Engineering is the science, art and

profession of acquiring and applying mathematical, scientific and technical knowledge in the creation, development and implementation

provement, subverting traditional standards of

design that takes over and reveals all the specif-

there is a need.

subversion of a traditional typology.

aesthetics, functionality and technology when

The expansion of SENGE-RS project

starts from very specific guidelines from local

of utilities that perform a particular function.

context, site and program. To propose a build-

plementation, engineering combines different

to parking lot, along with the impossibility of

into account society, technology, the economy

make the proposal a great investigative chal-

new building for the expansion of SENGE-RS

and structural parties start by understanding

for a technical, functional and economic im-

nical and financial aspects to concatenate into a

In the creation process, development and im-

ing whose 8.000m2 designates half of its area

expertise in order to enable the utilities, taking

large basements due to the high water level,

and the environment. Therefore, to design a

lenge. The development of the architectural

is to transcend pre-existing patterns seeking

these guidelines, adding to them zoning, tech-

icities of a unique building, in other words, the

PROPOSAL The programmatic distribution re-

verses the traditional logic commonly used in

this typology which has been alocated parking lot in the basement and in the first floors and the rest of the program on other floors.

In order to establish relations with

the urban life of the immediate surroundings the program was distributed in a way that programs with a more public character are located


Site Location

Legal Constraints

Traditional Typology

Subverting the Typology

A very high water level, a parking lot space that occupies more than 4.000m2 and the zoning laws issues do not allow the design of an traditional typology which is based on basement and lower levels exclusive for parking and upper levels cointaining the office spaces.

The programmatic inversion locates parking lot in a neutral region withi the tower itself. At the same time concentrated areas of courses rooms and gallery spaces in a greater dynamic relationship with the general public at the tower’s base. Taking advantage of the best visuals towards the city, natural light and ventilation the work rooms are placed in the top of the tower.

Program and Flows

in or close to the ground level, in order to fa-

of the tower, with the best views and natural

courses and exhibitions areas are placed within

building free from any other construction. It

cilitate the flow of the general public. Thus, the

the area with the largest urban dynamics, consequently stimulating the urban life of the site and its context. The ground floor also houses

an internal alley that enables the connection

between streets that face the site and creates a shortcut for pedestrians.

The parking lot is located in an inert

region of the tower, once it does not have urban relationships as the ground level nor privileged

views as the top of the building. Workrooms and the co-working area are arranged on top

light once they are located above the existing

became a hovering glass box. The distance from the ground level is desirable in order to avoid

visual and audible interference in a work environment.

The main access is by Visconde do

Herval Street which has a smaller cars flow and a scale more appropriate for the pedestrian. The footprint of the tower’s base is inflected

due the presence of a fig tree and thus providing room for a small pocket square that houses

the main entrance. At the same street there are

the shops, the book shop and the SENGE-RS memorial.

The car entrance and the loading area

faces Erico VerĂ­ssimo Avenue. The parking lot

access through an elevator is accessible from the old building, using an area that formerly was used to park few cars, in the back portion of the original building.

The programmatic articulation of

these spaces according to their needs clearly

distinguishes public spaces and areas with input control.


Structure

Bird’s eye view.


Co-Working space.

Classrooms.



Workrooms.


Bridging Paraisópolis

2014, São Paulo, Brazil

Perverting Modernism

Design proposal bridging both sides of the valley. PARAISÓPOLIS To understand the history of Paraisópolis it is needed

to go back to 1921. The area where the favela is located today

was part of Fazenda do Morumbi which was divided in 2200

plots by União Mútua Companhia Construtora e Crédito Pop-

city center

ular S.A. The infrastructure of the allotment has not been fully

implemented and many of those which purchased plots have never taken actual possession neither paid the taxes.

paraisópolis

That is, as has been verified many times in the history

of São Paulo, public or private developments which had not

been completed eventually become abandoned regions. For this reason they became a call for informal occupation.

Today Paraisópolis complex is considered the sec-

ond largest favela in the city of São Paulo with 55,590 people

and 20,832 properties (officially), plus a network of civil institutions working in social projects within the community. Paraisópolis is divided into 5 parts (Grotinho, Grotão, Brejo,

Antonico and Centro) and has two other adjacent favelas (Jardim Colombo and Porto Seguro) originated around the same time as Paraisópolis.

Favelas in the city of São Paulo


THE PROPOSAL

Paraisópolis has a peculiar characteristic which distinguishes

In Paraisópolis the “center”, not as geographic location but as

it from most of Brazilian favelas. The slum is located on a regular ur-

the hub of specific activities, is not limited to a single point as in the tra-

area. The idea of ​​creating a regular allotment ended up creating one of

throughout the area, specifically along the urban grid. Thus, virtually all

ban grid, which is reminiscent of the first urbanization project for the

the most paradoxical spatial conditions in the city, where formal and informal city layers overlap.

ditional city, not just to the edges like most of the slums, but it is found the blocks’ boundaries are “center”.

Re-connecting Paraisópolis Grid

The region of Grotão due topographical reasons interrupts the

The structure was designed so that its program can be modi-

continuity of the orthogonal urban fabric. That is, what should have been

fied easily with low cost. The project contains a school, a library, a sports

in risk areas with the largest urban, economic and social problems of the

any activity that does not require special infrastructure) plus a street for

divided into smaller blocks turned into a super cluster of shacks located whole community.

The design is concerned to reconnect the Grotão with the rest of

zone, green areas, spaces for temporary activities (fairs, exhibitions, or light vehicles. In a way, the bridge is part of the urban grid.

The bridge operates in a highly urban level. The connection can

the community. The proposal was to create a bridge that allows vertical

be used to improve other areas of Paraisópolis besides Grotão with the

the continuation of the grid that performs in a higher urban level.

the interesting point of the project is it to be a very flexible open structure.

connections that act in local level and a horizontal connection which is

least possible impact on existing buildings. In an architectural context,

context

valley’s specific connections

re-connect

deflect public space

add public space

open to Paraisópolis


South Elevation

Implantation

STRUCTURE, ENVELOPE AND FUNCTION MAP Structure can be evaluated emotionally; envelopes will surely

also be. Structure and envelope can be separated from each other. User’s emotions might change. However, structure (the skeleton) is the most

unchangeable component of the architectural artefact and can only be

changed with great difficulty. Envelopes can be changed relatively easily. The function map (which is concerned to the user of the building) is what can be changed most easily.

View from the multi-sport court. The court as an open space can be used for extra activities besides sports events. As the bleacher is covered it can be used to play movies and held lectures as well.


DIAGRID COMPONENTS - PIPES AND JOINTS

top view

front view

isometric

4x

4x

2x

1x

assembly

diagrid perspective

View from the stairs towards the bridge.

set up


Data Silos

GEN.1

2013, Groningen, The Netherlands

*part of a exhibition in the hall of the Gedempte

Excess Heat Enabling Civic-ness

Zuiderdiep 98 in Groningen

Europan 12 finalist

With the shift from manufacturing to

(global) service industries, the challenge is to sustain local benefits from this re-alignment

while simultaneously marketing the city competitively. Telecommunication services and the

infrastructure for supporting a digitally ena-

bled society is a booming industry, at the core of which are the data-centers. With a young, creative demographic and a forward-looking entrepreneurial spirit founded on a strong

quality of living, Groningen is ideally suited to host data-centers. Sitting on an abundant and

relatively cheap power source, in a cool climate, on pre-existing fiber optic lines, and boasting

an institutional framework supporting internet

innovations (Internet Valley, Mediacentrale, GN-IX, and the Center for Information Technology at RuG), Groningen is poised to expand its digital presence.

A decisive and stand-alone desti-

nation program of an infrastructural nature which nonetheless leaves options open for its

neighbours is called for. Its’ fate ought not be tied to the north, but wager instead on the more likely success of the southerly SuikerUnie site. Post-industrial and failing-retail sites are ideal

locations for new data-warehousing (Amazon has retrofitted a Food terminal as a data-center

in Dublin, Google a paper-mill in Norway, and Olivetti is exploring their viability in Turin). In the long-term it will form the nexus and hinge

between the west and south development parcels, and perhaps even engender an alternate

future for the failing furniture retail immediately north, making a virtue of its relative inaccessibility by retrofitting their shed-buildings as data-center annexes (Faltering retail outlets have been profitably converted to data-centers

with higher rent-income, notably by Sears and

Barns & Noble in North America). There is much to be gained by co-locating data-centers

with other uses. By plugging other uses into

the system, waste heat is capitalized upon, ef-

fectively creating a district heating system (In Vancouver Telus Communications has plugged

their downtown data-center into a new office

(Vertical format data-centers have been piloted

In the first phase (DataSilosGEN1) the holistic

Docklands where Telehouse has also plugged

headquarters and condominium development).

approach to waste heat sustains a public ther-

mal pool and greenhouse. Expanded as a model for rebranding the area over a 10 year period,

DataIsland2025 shares its excess heat as an incentive for development on all sides. A vertical

format for the data-center reserves ground level for occupied activities and ensures scalability of the servers above without compromising the configuration of the pools or greenhouse

across the globe, most successfully in London its excess heat into a district heating system

to achieve high environmental standards and planning approvals).

Initial investment is minimal as in-

dustrial-scaled power already arrives at SuikerUnie site, and a fiber optic connection has recently been made as part of the community metro ring. The data-center could be operated


Servers

Hot Air Manifold Heat Exchanger Netherlands 1,730 data providers

Cooling Plant

Data-Center

Hot Pool

Parking Servicing

Temperate Pool United Kingdom 2,660 data providers

Support Office

Cool Pool Germany 2,371 data providers

Promenade Cafe

Thermal Pools

Greenhouse Bridge

Greenhouse

Systems: a heat engine Traditional data-centers produce enough heat to supply a building three times its size. Diverting that heat flow through intermediate civic functions adds value and profile to the system without hindering its functioning, and offers sustainable operational cost recovery. While server technology continues to improve by reducing operating temperatures, turning waste-heat into a resource turns the problem on its head.

Inter-European and continental fiber-optic cables A small country with a big digital presence.

Zernike (11.500m2)

Eemshaven (18.000m2)

server room heat generation phase

hot air collection/ distribution phase

air conditioning phase

greenhouse phase

water purification phase

Metro Community Ring

DataSilos (22.000m2) Gen1

DataIsland2025 (42.200m2)

Rekenhal

murky water inlet

thermal pool phase

heat exchange phase

clean water outlet

Programming: a parasytic pool and greehouse

Fiber-optic cables and data-centers Traditional data-centers produce enough heat to supply a building three times its size. Diverting A new identity for the West builds on recent telecommunications investments.

The challenge of the data-center is its architectural and urban integration with the city. Condensing the servers vertically and parasitically linking amenity programs to its’ base amerliorates its impact, making it a genuinely desireable neighbour.

by a private hosting firm (one which leases out

the project is improved by its re-use of waste-

DataSilosGEN1 Groningen once again leads the

or Amazon), or be government run (to support

be negotiated as an additional incentive.

culture is balanced against traditional civicness

server space), a proprietary firm (like Google

start-ups or support state agencies)(Comparably sized and located cities in Canada have successfully attracted a government datacenters to support digitalization of healthcare databases

and services). The City has proven its viability

by three other data-centers in the area (the lat-

est at Eemshaven).The economic viability and the much sought-after positive public profile of

heat for which a monthly supply contract could

On a more abstract level, it is a man-

ifestation of the digital Cloud rendered in concrete and fabric, and builds on a long tradition

of architecture learning from industry/telecommunications (Peter Behrens’ AEG Turbine Factory (1909) set a path for Modernism. The

contemporary factory is the data-center). With

way by demonstrating a future where digital and communalism, invests in its competitive

future on a global scale, and re-confirms its’ pioneering spirit. The first generation of a new building type; the urbanistically responsive data center.


DATA-CENTER

ETFE VEIL

THE MARSH

GREENHOUSE BRIDGE

THE POOLS

THE BEACH

THE BOARDWALK

A viable alternate future to struggling furniture retail and post-industrial sites.

A new identity and landmark generously sharing its heat

The Boardwalk

Traditional and new forms of civic-ness


The Greenhouse

The Gateway

The Promenade Cafe

Thermal Pools

Jury Report The idea of a large data centre, using the surplus heat for thermal baths, is more realistic than appears at first sight. Groningen would definitely benefit from an eye-catching building on this site, but the architecture needs to be of a much higher standard than represented here. The plan is not suitable for a gradual development of the site.


Nova Biblioteca

2013, São Paulo, Brazil

A Estratégia de Densificar

In an Era that tends to be sceptical about the use

of collective spaces in the contemporary city and each person is more unique, exclusive and personalized than ever, the proposed library is a statement about its fundamental

and unique role as a building truly collective and public use.

The proposed library does not reinvent the tradi-

tional institution. Simply adapts it to new demands. Ceases to be true to the book and becomes concerned about

knowledge, independent of the way this is presented. The book frees space for collective use, but do not cease to exist.

The project densifies vertical/horizontal circu-

lations and services in a super-efficient core. The existent

pit for lighting and ventilation is maintained, however it

becomes a void that is now part of the building’s interior, a significant element that organizes the spaces.

The void divides the building into two larger

blocks. The front block will house the activities of collective

use, such as study rooms, administrative areas and workshops. These spaces were designed taking into account the

idea of ​​free plan, so their remodelling becomes very simple.

Any adjustments that need over the years can be easily implemented without changing the functional organization of the library as a whole. The same volume is subdivided into two parts. The bottom holds all administrative spaces

while the top ones are dedicated to students, teachers and the general public. The rear volume, in its turn, houses the

archive itself. It will be a fully automated block with nine stories high, using an automated library system (ALS).

The ground floor and the front part of the un-

derground will allocate spaces with public character such as the general service desk, gift shop, café, multipurpose

space and an auditorium for 100 people. The top terrace

will be holding a programless leisure area taking advantage of the magnificent views of the city.


The void that used to be a narrow courtyard which provides natural light and ventilation became a crucial organizing element bringing all the programs together. It also allows the automated archive to be seen from every point within the building. This type of archive comprises an immense collection using 1/7 of the space of normal shelves, liberating space for other activities.

The ground floor being itself as multifunctional spaces makes users aware of all the programs present in the building through different openings, void, glass floor, exposed elements (archive) and other strategic placed elements.


Different spaces of the library: typical study space, mediaroom, canteen, auditorium, all sharing the same features as visual porosity and flexibility.

The terrace placed at the top floor gives an singular opportunity to study, relax and organize events with an exclusive view towards São Paulo city’s center.


134.27

130.93

127.59

124.25

120.91

117.57

114.23

110.89

108.02

105.18

100.05

96.35

Section

Ground Floor


Intermediate Pavilion

2013, Rio de Janeiro, Brazil

Tying Bonds between Symbolism, City scales and Users

The use of fabric curtains, instead of traditional rigid walls, allows users and air to penetrate through it without any major effort. It gives fluidity to the space at the same time giving borders to the object. There is no fixed entrance or exit, thus the pavilion can be accessed by any point. SCALING UP THE OBJECT The pavilion will intermediate the scale of the Arcos da Lapa and the Square. The size required for the program had to be enlarged, thus allowing its critical mass to tie both scales. SCATTERING GRAM

LANDSCAPING THE ROOF The implementation of a canopy allows the pavilion’s footprint to be bigger and, at the same time, not changing the dimensions of the programs which are floating underneath. The shape of the roof has to do with the beauty of the sinuous natural landscape of Rio de Janeiro, as Niemeyer used to address in his works as being “the curves of the Brazilian women”. The roof once read as a landscape has vegetation. The plants used are species commonly found at Burle Marx’s works, which has become a traditional image of the modernist Brazilian landscape.

BORDERING ION

THE

THE

necessary in a tropical city as Rio de Janeiro. It is composed by a set o smaller pieces, or “blades”, which can be assembled in loco. This system is also really efficient for transportation. The café’s floor is projected to the canopy creating a glass roof on top of it, in order to protect the users during rainy days and other undesired events. It also has photovoltaic cells which will generate power that will be used in the pavilion. The blocks will follow the same material of the structure, wood painted in white.

The plaza where the pavilion is placed will be covered with artificial grass. The border lines will be exaggerated wider, comparing to what we would expect to find in a soccer field, in order to emphasize its limits. The screen and the lights, placed at the corners, give to the place the atmosphere of a soccer stadium.

PRO-

In order to not spatially oversize the program it had to be broken into different smaller blocks. Each new piece can be read as a distinct pavilion, but all of them within a single shared container.

THE FIELD The last element is the field. It will transcend the boundaries of the object, working at the city scale.

TYING ELEMENTS Once all the basic elements (the scattered program blocks, the curtains and the canopy) are placed, they are all connected in order to originate the final structure. The canopy goes down around the program blocks generating the columns. The floor of the café is elevated, becoming a solid block, which will work as the main foundation. Its multicolor mixed pattern represents each country which will be playing the World Cup 2014.

PAVIL-

With the addition of side borders the object itself has become a container ready to receive a variety of programs. In addition to that a clear distinction between inside and outside is created.

STRUCTURE The structural grid made out of wood allows air to flow within the pavilion. It also works as a sun shading, which is something

info 29.54m² shops 45.18m² adm

31.82m²

plant

21.97m²

café

261.65m²

toilets

18.31m²


arcos da lapa height

Section

Exterior view

Interior view


Event Tray

2012, Hamburg, Germany

Advancing Central Station Towards Public Space

Event Tray project is not a master plan neither an

tances through a busy station in order to reach the city. The uncovered

architectural object, rather, it contains basic genes of both.

space which the platforms are placed has an enormous potential to be-

In Hamburg around 1/3 of the train platforms are located out-

borders defined and with no doubts the vocation to become an open air

side Central Station’s main building. Those platforms have no straight

connections to city. Passengers must leave the train and walk long dis-

come a new entrance of the station. Furthermore, this space has all its

public space. The role of the designer, in this case, is the same as a cutter that from a rough stone gets a diamond.

NON-RETURN DIAGRAMS

city

city entrance plaza N

city train platform

1) horizontal method

train platform

central station N tunnel N tunnel

2) vertical method

city

central station

city

city

S tunnel

train platform

library

train platform

city

entrance plaza N

city

train platform

3) levels method elevated road 200 city 000 central station -150

train platform -830 railway -900

entrance plaza S

train platform

entrance plaza S

library

city 000 S tunnel -300

entrance plaza S -070

library -830


SURFACES

elevated road entrance tunnels city

city entrance plaza N

city train platform

surface’s connectors

train platform

central station N tunnel N tunnel

city

central station

city

city

S tunnel

train platform

entrance plaza S

train platform

library

train platform

verticals

city

entrance plaza N

city

train platform

entrance plaza S

library

flats elevated road 200 city 000 central station -150

train platform -830 railway -900

city 000 S tunnel -300

entrance plaza S -070

library -830


New connections enabling public space.

Platforms merge with city.


New perspectives from unexpected connections.

Public Space collides with infra-structure.


Olympic Games Info Pavilion

2010, London, England

xxxx

To design the Info Pavilion, for the Olympic Games in London

tral, in other words, it should not interfere on the qualities of the square.

tual line is related to the site where the Info Pavilion will be plotted. The

among different cultures, personal exchanges, meetings, celebration and

Trafalguar Square is much more than just a public square in the city of

London. It is a vital hub for the urban logistics and a pure example of a totally democratic space. The inserted pavilion should keep itself neu-

The second one is related to the object itself. It claims for integration

information. All these concepts will shape the Info Pavilion, a democratic building.

23m

2012, is necessary to put together two conceptual lines. The first concep-


222m²

BIG SCREEN

CONNECTION PLAN

20m²

CAFÉ

124m²

solar panels

TOILETS

21m² 50m²

STORE

14m²

INFO/TICKETS

21m² 35m²

PLANT ADMINISTRATION

15m

4,5m

PLANT

ADMINISTRATION

4,5m

I/T

STORE

I/T

4,5m 5,6m

TOILETS

8,9m

CAFÉ


Urban Condenser

2009, São Paulo, Brazil

Re-defining Berrini through Place as a Concept

MASTER PLAN Located in São Paulo, Berrini is an

is addressed to the local connections within the

Bandeirantes Av., and Roberto Marinho Av.

the attentions to the local environment. A shift

area clearly defined Pinheiros river, Berrini Av., From the 80’s it became one of the biggest corporate buildings cluster in Brazil. Today it can be seen as a part of the city which has two very

different but consolidated parts, one residential and one dedicated to worldwide business.

The hypothesis suggested in this work

area. Far from a city strategy it concentrates from the city to the peculiarities of the context.

That means a shift from Berrini Av. to its adjacent streets. There is a lack of connections

between public spaces and private buildings in Berrini. Both don’t perform collectively, rather as individuals. The ability to perform together

will improve the whole area consolidating a single identity.

The master plan proposed foresees 3

different phases to be implemented in the area. The first one is addressed to connection of all

public areas along the axis. The second phase aims to connect the train station directly to the

area through an open library. The third phase is the cultural center.

UNDERGROUND PARKING

CULTURAL CENTER LIBRARY


CULTURAL CENTER The cultural center is located at the Southern ending of the

The design porosity allows ground circulation in all directions.

master plan. Its program consists in a parking lot, art galleries (empty

The building was designed to be a structure that enables public activities

bitions), a plaza for public activities such as an open market, helipad, a

of programs straight to the public space. It allows public spaces to take

boxes that could be used for other temporary uses rather than art exhitheater, and a vertical park that runs through all the building.

plan connections

to its maximum. The vertical garden works as a loop connecting all sorts over the program, as consequence, all parts get benefits from this relationship.

South-North connection

East-West connection parking

Unfolding of the plane allows the South-North connection.

Connecting programs.

Addition of a Helipad. Highclass bussiness “parking lot”.

culture

“Z” repetion of the plane creates the parking lot.

Subtracting parts of the block enables open spaces and creates the Art Boxes.

Rotating parts for a better sunlight provision.

The teather is the piece which closes the circulation loop.

Vertical circulation placed in a strategics supporting both programs at once.

Addition of a Sight view box.

Possible future connection with the Library.


View from the event plaza, a true democratic space within a area dominated by the real estate market.


The street and sidewalks merge with the building. View from East-West connection.


Art Fund Pavilion

2009, Woking, England

xxxx

The adopted design allows this object

generated by filled spaces (blades) and empty

composed of blades, allows the assimilation to

space between blades disappears, so its volume

to be deployed in various sites. Its volumetric anywhere, mainly because its axes are axes of

symmetry and its production process makes it, visibly speaking, sometimes open, sometimes closed. This quality fade / appear mixes site and object.

Designed to be mounted in 48 hours

and sawed in 24 hours, the blade system, in this

way, becomes crucial in this process. Its logistics are facilitated through this system too. The object is formed / bounded by walls, which are

basic cube 50x50x50cm

set of cubes

spaces (between blades). For transport, the diminished considerably.

The materiality of the object is the

very site where it is deployed, since it is composed mostly of empty space. The site meets

these spaces between blades, changing the meaning of the pavilion in each place that it is

deployed. When disassembled for transport or storage, the object dissolves itself completely

into the space, it loses all meaning and remains only in memory. Thus, first the object bends

diagonals - structural stability

resultant blades

the space, than changes the space, and finally opens up the space for future possibilities.

These future possibilities on the site,

beginning to be developed as soon as the object is disassembled and evacuate the site. The empty spaces, that generate the object, before defined, again become the place of deployment in essence. A virgin place again, which was once

corrupted, to be re-explore and re-meaned. The

object finally comeback to become what it always was, a ghost that appears to reframe reality.

result

envelope


defining accesses and user interface

substraction creates entrances, while color highlights them

pavilion as pure envelope


Midiateca Matarazzo

PAULISTA AVENUE One of the most important developments facts of the city

2006, São Paulo, Brazil

THE SITE The delimitation of uses that was consolidated in the region is

of São Paulo was the occupation of the waters dividing area of the

evident. Along Paulista Avenue there are mostly corporate buildings and

as Paulista Avenue. Its opening date of 1891 and its occupation oc-

do Pinhal St. by one side and until Alameda Santos on the other side

Tietê and Pinheiros River basins, that is, the central spike known curred only due to private initiative which was in charge of projects and constructions.

The Paulista Avenue is a valuable and authentic docu-

ment of architectural and socio-economical evolution of the city.

Its buildings have been constructed throughout the century until

today. Furthermore it becomes a fully changeable axis, i.e., noth-

services. The area that stretches from Paulista Avenue until São Carlos

holds a mixed use program. Northern and Southern to this area there is

predominantly a residential zone. The site is located just in a buffer zone

between the corporate and residential area. The deployment of buildings in this zone sets activities related to services and trade close Paulista Avenue while residential and leisure ones by São Carlos do Pinhal St.

By analysing the site it is noticeable that the lots of the old

ing that is placed there has the guarantee to last for a long peri-

farms were divided into smaller plots. This form of land division gener-

which has always been in a constant process of metamorphosis. Its

ronistic deployment, in other words, classical lots with contemporary

od. Thus, it is impossible to set stages of evolution for this avenue burden is, undoubtedly, a reflection on the constant changes that characterizes São Paulo.

ated urban and architectural peculiarities in this area such as an anachbuildings.

The Paulista Avenue depends on other streets for its urban

Paulista Avenue is the largest financial business cluster

performance. São Carlos do Pinhal St. works as binary giving support for

in the world. A pole of decisions-makers compared to 5th Avenue

To make a turn in the avenue it is necessary to use the binary and a lot

in Latin America and hosts one of the largest hospital complexes

in New York. Its 2.8 kilometers are served by the metro with 450 thousands passengers a day in a peculiar rhythm, a characteristic pulse of life in São Paulo.

the avenue’s traffic. This vocational function is clearly noticed in loco. of buildings that face both streets use São Carlos do Pinhal St. as main entrance to their parking lots.


THE DESIGN The design was addressed to bring back to the light of discussion the importance

of public spaces along the avenue. Its main strategy consists on dedicating the street level of the site to the open air public activities and placing the rest of the program in higher and lower levels allowing the natural topography to be used with few changes. The buildings were

TRIANON

MASP

SITE

placed close to the avenue while “empty lands� were placed close to the residential zone.



Street level plan


ACADEMIC PROJECT’S LIST BACHELOR (UCS, Caxias do Sul)

2002, Burgo Project, Caxias do Sul, Brazil - Architecture

2002, House for an Artist, Caxias do Sul, Brazil - Architecture 2002, Housing Condo, Forqueta, Brazil - Urbanism

2002, Parque da Maesa, Caxias do Sul, Brazil - Landscape

2002, Student Housing, Caxias do Sul, Brazil - Architecture

2003, Antoninho Regional Network, Antonio Prado, Brazil - Urbanism 2003, Office Tower, Caxias do Sul, Brazil - Architecture

2003, Residential Tower, Caxias do Sul, Brazil - Architecture 2004, Nike Factory, Caxias do Sul, Brazil - Architecture BACHELOR (FAAP, São Paulo)

2005, Avenida Paulista, São Paulo, Brazil - Architecture

2005, Burle Marx Exhibition, São Paulo, Brazil - Architecture 2005, Chair, São Paulo, Brazil - Industrial Design 2005, Design Studio, São Paulo, Brazil - RMIT 2005, FUNARTE, São Paulo, Brazil - RMIT

2005, Hotel, São Paulo, Brazil - Architecture

2005, House, São Paulo, Brazil - Architecture

2005, Modular Cannopy, São Paulo, Brazil - Architecture 2005, Residential Tower, São Paulo, Brazil - Landscape 2005, Vila Itororó, São Paulo, Brazil - RMIT

2006, Midiateca Matarazzo, São Paulo, Brazil - Architecture POST-GRADUATION (Mackenzie, São Paulo)

2008, Berrini Dwells, São Paulo, Brazil - Architecture

2008, Urban Connections, São Paulo, Brazil - Architecture

2009, Urban Condenser, São Paulo, Brazil - Architecture 2009, Berrini: Um Novo Lugar na Cidade - Theory MASTER OF SCIENCE (TU Delft, Delft)

2011, Hybrid Building, Amsterdam, The Netherlands - Architecture 2012, Event Tray, Hamburg, Germany - Landscape

2012, Urban Catalysts: Towards an Optmized Envinronment - Theory

2013, Included You!: Social Inequalities Shaping Physical Spaces - Theory

2014, Bridging Paraisópolis: Perverting Modernism, São Paulo, Brazil - Architecture

WORKSHOPS

2010, Knowledge City, The Netherlands - Urbanism (The Berlage Institute, Wiel Arets)

COMPETITIONS

2004, VII ENEPEA, Caxias do Sul, Brazil - Architecture

2007, Ópera Prima, Brazil - best graduation in the country (*National Shortlist)


PROFESSIONAL PROJECT’S LIST COMPETITIONS 2009, Art

Fund Pavilion

Woking, England - Architecture 2010, Olympic

Games Info Pavilion

London, England - Architecture 2013, Nova

Biblioteca

2013, Data

Silos, Excess Heat Enabling Civic-ness

São Paulo, Brazil - RMIT

Groningen, The Netherlands - Architecture (*EUROPAN 12 - Final Shortlist) 2013, Intermediate

Pavilion

Rio de Janeiro, Brazil - Architecture


EXPERIENCE



Trainee at

TomDavid Architecten,

Rotterdam, The Netherlands

Rotterdam, The Netherlands

(March 2011 - November 2011)

*Architecture - Development of new projects from the initial design until technical drawings.

‘Dwardesign’ at NAi Rotterdam

Design proposal for an inspiration room on top off an indispensable fire escape. A room with a view, overlooking the city of Rotterdam at a glance.

Unsolicited research and design proposal for the McDonalds pavilion on the Coolsingel, Rotterdam. Current position of the building is inevitable, due to a long-term leasehold contract. A strategic study by TomDavid was initiated with the following question in mind: is it possible to find a healthy mix between an architectural attractive solution and a much needed urban improvement on a programmatic and esthetic level.

‘The Netherlands - Off the shelf’ at NAi. Re-design of the exhibition-landscape


Design proposal for pool, convertible roof and sliding doors

Concept idea for an elegant + multipurpose poolcover. A light weight structure containing all around industrial curtains providing shade in the summer and a comfortable climate during the winter. In autumn the cover will also protect the pool from getting silted by leaves.

PROJECT’S LIST Dwardesign at NAi, Rotterdam, The Netherlands

The Netherlands - Off the shelf at Nai, Rotterdam, The Netherlands Fire Escape, Rotterdam, The Netherlands

McDonald’s Pavillion, Rotterdam, The Netherlands Swimming Pool, Dongen, The Netherlands Pool Cover, The Netherlands Lifting Rotunda, Spain

Luggage Handling area at the Cruise Terminal, Rotterdam, The Netherlands


Architectural Coordninator at Debora Aguiar São Paulo, Brazil (January 2010 – September 2010)

& Arquitetos Associados,

*Architecture - Development of 15 houses from 600m2 up to 2500m2. Supervision of team with 10 architects inside the office plus external construction and technical drawings team. Close connection with the final client, including weekly meetings, construction supervision, contracts and costs.

Renato Martins House, Uberaba, Brazil

Carlos Lima House, Bragança Paulista, Brazil

Fernando Queipo, Jaguariúna, Brazil

São Paulo, Brazil


Lote 03 House, Guarujá, Brazil

José Alves Damasceno House, Guarujá, Brazil

Mauro Wulkan House, Guarujá, Brazil

Lote 03-13 House, Bragança Paulista, Brazil

PROJECT’S LIST Renato Martins House, Uberaba, Brazil

Lote 01 House, Bragança Paulista, Brazil

Lote 03-13 House, Bragança Paulista, Brazil Jetta House, Bragança Paulista, Brazil

Ariadne Latkani House, Guarujá, Brazil

Carlos Lima House, Bragança Paulista, Brazil Lote 03 House, Guarujá, Brazil

Danilo Ferraz House, Barueri, Brazil

Mauro Wulkan House, Guarujá, Brazil Jetta House, BragançaPaulista, Brazil

José Alves Damasceno House, Guarujá, Brazil


Architect at

Itamar Berezin Arquitetura,

São Paulo, Brazil *Architecture

(March 2008 – January 2010)

São Paulo, Brazil

- Development of more than 40 (residential, hotel, and commercial) towers’ façades and

ground floor, approval drawings, supervision of 3d perspectives for brochures and sales physical models. Close connection with the final client.

Time Offices, São Paulo, Brazil

Capital Corporate Office, São Paulo, Brazil

Mare Di Cesare, Guarujá, Brazil

Welcome, São Paulo, Brazil

Quality House Jd. Prudência, São Paulo, Brazil

L’Adresse, São Paulo, Brazil


BUILT PROJECT’S LIST (_client - development, location)

_AAM Incorporadora - Merano, São Paulo

_Barbara Engenharia e Construtora - Time Offices, São Paulo _Brookfield Incorporações - L’Adresse, São Paulo

_Corp Empreendimentos Imobiliários - Centro Empresarial Berrini, São Paulo _Cristal Engenharia - Diamond Diamond Tower, Manaus

_Cyrela Brazil Realty SA Emp - Escritórios Mooca, São Paulo _Cyrela Brazil Realty SA Emp - Menara, São Paulo

_Cyrela Brazil Realty SA Emp - Welcome, São Paulo _Esser - Neo Offices, São Paulo

_Eztec - Capital Corporate Office, São Paulo

_Eztec - Le Premier Ibirapuera Parc, São Paulo

_Eztec - Palais Les Champs, Campos do Jordão _Eztec - Prime House Vila Mascote, São Paulo

_Eztec - Quality House Jd Prudência, São Paulo _Eztec - Sky Campo Belo, São Paulo

_Fraiha Incorporadora - Platinum Tower Ibirapuera, São Paulo _Goldsztein - Louvre Gallerie, Porto Alegre _Goldsztein - Prado Gallerie, Porto Alegre _Habitcasa - Spalla, São Paulo

_Habitcasa - Toccata, São Paulo

_Incortel - La Plage Residencial Clube, Vila Velha

_JHSF Developments- Benedito Lapin, São Paulo

_JZM Planejamento Imobiliário e Construções - Mare Di Cesare, Guarujá _Kallas - Città Della Mooca, São Paulo Centro Empresarial Berrini, São Paulo, Brazil

_Kallas - Double Office Santana, São Paulo _R Yasbek - Onix Ibirapuera, São Paulo

_Rossi Residencial - Persona Libertate, Brasília _Rossi Residencial - Persona Ventura, Brasília _Rossi Residencial - Persona Ventura, Brasília _Sinco Engenharia - Wide View, São Paulo

_Taormina Incorporadora e Construtora - West Corporate, São Paulo _Teixeira Duarte - Quartier, São Paulo

_Zabo Engenharia - Maison Victoria, São Paulo _Zabo Engenharia - The One, São Paulo

_Zabo Engenharia - The Project, São Paulo

UNBUILT PROJECT’S LIST (_client - development, location / *secret)

_AAM Incorporadora - Belle Jardin, São Bernardo do Campo _AAM Incorporadora - Renato Paes Barros, São Paulo

_Barbara Eng e Construtora - Rua Maratona, São Paulo

_Corp Empreendimentos Imobiliários - Rua Jacerú, São Paulo _Cyrela Brazil Realty SA Emp - Costaneira, Belém do Pará *_Cyrela Brazil Realty SA Emp - EIT 18 Comercial

*_Cyrela Brazil Realty SA Emp - EIT 18 Residencial _Incortel - Espírito Santo

_AAM Incorporadora - Inside, São Bernardo do Campo _Magik Construtora - Av das Nações Unidas, São Paulo

Sky Campo Belo, São Paulo, Brazil

_SAB Group - Rua Araguari, São Paulo _Tecnisa - Rua Pamplona, São Paulo *_Marcos Lopes


Junior Architect at

Debora Aguiar & Arquitetos Associados,

São Paulo, Brazil (January 2007 – March 2008) *Architecture and Interiors

- Development of interiors projects for houses, sales show room for new

developments, stores, exhibitions and new residences, including meeting with clients, technical and approval drawings, 3d perspectives and physical models supervision, and preliminary design.

Samantha Muller, Rio de Janeiro, Brazil

Casa Cor 2007, Rio da Janeiro, Brazil

São Paulo, Brazil


Cristiane Cury, São Paulo, Brazil

PROJECT’S LIST

(_client - location / interiors or architecture) _Alessandra Almeida - Tatuí, Brazil / interiors

_Daniela Rolim - Ibiúna, Brazil / interiors

_Artefacto - São Paulo, Brazil / architecture

_Domingos Tufariello - São Paulo, Brazil / interiors

_Casa Cor 2007 - Rio da Janeiro, Brazil / interiors

_Eleonora Gomes - São Paulo, Brazil / interiors

_Cristiane Cury - São Paulo, Brazil / architecture

_Eliana Martins - São Paulo, Brazil / interiors

_Cristina Naegele - São Paulo, Brazil / interiors

_Gabriela Pessoa - Rio de Janeiro, Brazil / interiors

_Guilherme Rossi - São Paulo, Brazil / interiors

_João Zogbi - Campos do Jordão, Brazil / interiors

_Cristina Fretta - Criciúma, Brazil / interiors

_Noe Pinto - Bertioga, Brazil / interiors

_Gisela Navarro - São Paulo, Brazil / interiors

_Patricia DiCroci - São Paulo, Brazil / interiors

_Gilson Hochman - São Paulo, Brazil / interiors

_Tatiana Queiróz - São Paulo, Brazil / interiors

_Paola Benik - São Paulo, Brazil / interiors

_Rossanne Urquiza - São Paulo, Brazil / interiors

_Mara Pessanha - São Paulo, Brazil / interiors

_Sandro Alex Lahmann - Rio de Janeiro, Brazil / interiors

_Ana Regina Graciotti - São Paulo, Brazil / interiors

_Denise Martins - São Paulo, Brazil / interiors

_Carla Barcelos - São Paulo, Brazil / interiors

_Efraim Horn - Guarujá, Brazil / architecture and interiors

_Claudia Poblacion - São Paulo, Brazil / interiors

_Eliana Guedes - São Paulo, Brazil / interiors

_Cristina Comini - São Paulo, Brazil / interiors

_Elie Horn - São Paulo, Brazil / interiors

_Cyrela Via Ibirapuera - São Paulo, Brazil / interiors

_German Quiroga - São Paulo, Brazil / interiors

_Carlos Antunes - São Paulo, Brazil / interiors

_Lia Giaffone - São Paulo, Brazil / interiors

_Mirella Duarte - São Paulo, Brazil / interiors

_Patricia Arce - São Paulo, Brazil / interiors

_Cynthia Karystinos - São Paulo, Brazil / interiors

_Renata Biem - São Paulo, Brazil / interiors

_Rogério Zylberstjain - Rio de Janeiro, Brazil / interiors

_Ricardo Rosset - São Paulo, Brazil / interiors

_George Zausner - São Paulo, Brazil / interiors

_Samantha Muller - Rio de Janeiro, Brazil / interiors

_Aurea Lopes - São Paulo, Brazil / interiors

_Sergio Evangelista - São Paulo, Brazil / interiors

_Daniela Burti - São Paulo, Brazil / interiors


Max Fabris Delft, NL maxfabris@gmail.com (31)0625185788


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.