LOG.India February 2012

Page 61

Subscribe to LOG.IndIa and LW India’s only magazine and newspaper providing engaging stories on SCM and logistics. IndIa’s LeadIng LOgIstIcs MagazIne www.logisticsweek.com

IndIa’s LeadIng LOgIstIcs MagazIne www.logisticsweek.com

INDIA

zIne Maga LOgIstIcscsweek.com ng L Ing www.logisti

October 2011 Vol. 5 — No.2 October 2010 | Vol. 4 – No.2

No.8 Vol. 4 — No.2 April 2011 Vol. 4 – 2010 | October

A INDIA

`100

ation Educecial Sp

INDIA

com logisTic s 20

PAGE 11

` 100

`25 logisticsweek.com

November 16–30, 2011 Editor’s Note Enfant Terrible

amit mukherjee, Vicepresident (iT and supply chain) and group cio at rpg, has deployed exemplary supplychain strategies at spencer‘s retail >> page 34

waTErways 44 India is ignoring inland waterways at its own peril

Cover Price By Post By Courier Online (PDF)

1

`1200

`1080

`1320

$ 50

2

`2400

`2040

`2520

$ 90

3

`3600

`2880

`3600

$ 135

low adopTio N 24 ADV NEglEcT Why WMS ERSE REA Ed doesCTIO not have still GRE N: An ineffic waTErw enoug LIGH h takersEN ays 44 ient cold-c in India T: How Ericss VALUE India hain is is on India ignori OVER COS killing ng inland is reducwater children T: An ing ways in

its India...10 edited transc aty-cha its own peril suppl in carbon ript of ASC Summ footprint... it offers 18 key learni ngs...26

Bad logistics is often the cause for unhappiness and displeasure. It could be due to numerous reasons from traffic snarls, to delays in paper work or some little-known regulation that could cause delays in delivery. But to the receiver, it is bad logistics. Often, when you have asked for something to be delivered at a pre-decided destination and especially if you are eagerly awaiting the delivery, nine out of ten times it will never arrive on the scheduled date. This happens so often each time I order some books/CDs/appliances. The service provider will tell you that he has made more than one trip and there was no one home. And then you get into an argument. Is ensuring prompt delivery so tough? Don’t responsible people sitting in offices take stock of goods that have arrived and those that need to be delivered? Is the infrastructure in such doldrums? Surely, they are not short-staffed. Nor do people live in such remote areas (In the movie Il Postino, a make-shift postman delivers a letter with prompt regularity to his only customer who lives on the top of a hill) where they need to search out more deliveries within the area to justify their trip. And God help you if your parcel happens to be a passport.

Method In Motion

Year

THE

Move FOOD ment CRISI of teleco S 54 Annetwo m ISB Prof. rk equip shows ment a windo ensur howopens to e food w securi of oppor ty. tunity

Ms. Shagun Kapur Gogia, Director/Founder of Tuscan Ventures, has grand plans for the cold chain industry in India.

`100

Pg.3

`100

Jayakumar Krishnaswamy, AkzoNobel’s SCM

Britannia’s Replenishment Manager, Raviraj Rodrigues head, is managing a 24x7 supply-chain. Here’s DistributionNEglEcTEd Manager Sanjay low(right) and National how he plans to accomplish it. Page 16 Mukherjee the FMCG adopTioN 24 (left), manage the supply-chain waTErwaysof44 major the roadblocks and OLD ORDER: How clearing auto cos manage serviceIndia logistics for ensuring phased-out models...08 Why WMS stillwhile does is ignoring inland not have enough HAND: waterways at its own logistics... seamless logistics. sharp look. THE FOREIGN HowAFDI in Retail would change India’s 25 20 Page

TElEcom logisTics 20 GET SET, GO 38 Movement of telecom

network equipment opens The true story of supplyachain window of opportunity education in India. WALK IN THE PARK

COLOR OF

INNOVATION CRUNCH TIME

locatio need peril WMSDstill h GOO the right Why Warehouses choosing WATCH: have enoug goes into notSTOP TElE India ES: What takers in

RIGHT MOV

`100

PAGE 4

cation al Edupe S ci 8

Dr Ravi Prakash Mathur, Logi stics ami Director, , Dr.herj t muk Redee, dy’sVice desc Labo- rato SCM ribes pres how iden ries Ltd., t (iTthe its supp phar and maply and ly-ch sup gian t man cha like no othe pharmagroupain cio at rpg r India in)ages company deplow loye , has n NEglEcTEd d exe .

mpl chain adopTioN 24 ary supplystrategiPage es 36

In For The Long Haul

Varun Dhawan, VP-Taxation, Blue Dart Express Ltd., simplifies the issues with GST that have boggled many in the logistics industry.

tIcs www.logist MagazIne icsweek.co m

TM hee Right od In OF COLOR PM reostith cori nption INNOVATION

TElEcom logisTics 20

Interview

` 100

GET SET, GO 38 OLD ORDER: Movement of telecom Why WMS still does at spe retail ncer‘s Manager network equipment opens not >> have enough page 34 The true story of supplyTHE FOREIGN HAND: General achain window of opportunity takers in India education in India. Ed , Associate , runs a lean PRO-LIFE SCM: NEglEcT Ltd. Agarwal 44 ays ur India . 10 How Atul waTErw g inland weighs in... products hain), Dab industry ignorin 20 The over 300 low Page 24 (Supply-C way. is on its India Here’s why... at its own . ain for its ays ards. N 24 looks well stand waterw war ouse.. supply-ch adopTio does GST Bill n for a wareh to set labor TO GO:

ent of m opens TOWERING Movem teleco India’sent rk equipm netwo Unravelling oppor end.tunity of to cs,wend windo alogisti

October 2011 Vol. 5 — No.2 Vol. 5 — No.4 October 2010 | Vol. 4 – No.2

Ing LOgIs

amit mukherjee, Vicepresident (iT and supply chain) and group cio at rpg, has deployed exemplary supplychain strategies at spencer‘s retail >> page 34

PLY LIFE SUP TElEcom 20 s 38 logisTic ABOV telecoEm

IndIa’s Lead

Pg.38

Method In Motion

Viceherjee, chain) supply amit muk t (iT and presiden cio at rpg, has up plyand gro plary sup r‘s d exem spence deploye tegies at chain stra page 34 retail >>

INDIA INDIA

` 100

December 2011 ` 100

July 2011 Vol. 4 — October No.11 2010 | Vol. 4 – No.2

Method In Motion

LOG.IndIa

`100

takers in India

peril

PRO-LIFE SCM: Amid all the din around green logistics, some practical wisdom...30

44

BIGGER PICTURE: How supply-chain hurdles dent company bottom-line...14 RETAIL LACUNAE: Retail logistics managers rue lack of standardization....30 CII SUMMIT: Highlights from arguably the biggest congregation of SCM chiefs...36

A detailed analysis of India’s logistics parks

Your’s truly, Jayashree Mendes

Editor, LogisticsWeek

Firms Rethink Supply Chain Risks

Disasters in Japan, Thailand highlight need for continuity plan Bangkok As flooding in Thailand disrupts supply chains in many industries, the event—along with Japan’s March earthquake and tsunami—is prompting many to consider aspects of supply chain risk that might have been previously overlooked, says a recent report in Business Insurance. While many expect global sourcing to become an even larger factor for businesses going forward, recent events are prompting companies to consider the geographic concentrations of suppliers, the need for backup suppliers and reengineering processes to accommodate backup components should supply chains be disrupted. With an estimated 45 percent of the world’s hard-drive production located in Thailand and flooded plants affecting production by major manufacturers such as Seagate Technology Inc. and Western Digital Inc., some analysts say the disruption could affect PC production through the first half of 2012. The flooding also has had a major impact on the auto industry, where disruptions at Thai auto manufacturing plants and parts producers reportedly is expected to result in lost production of 250,000 vehicles worldwide. Many Japanese companies relocated production to facilities in Thailand after the March earthquake and tsunami. London-based law firm Reynolds Porter Chamberlain L.L.P. said the move to Thai facilities helped many Japanese companies mitigate their losses after the Japan disaster. But many now face further losses as a result of the floods in Thailand. “The problem for insurers who provide business interruption cover to Japanese manufacturers is that they have to cover the losses stemming from the Thai flooding because so many businesses moved some or all of their supply chain there,” Daniel Saville, legal director in the reinsurance and corporate insurance department of Reynolds Porter, said in a statement. “Moving production from Japan to Thailand was “Plan B.’ The question now is whether those businesses have a “Plan C,’” he said.

Source: cleveland.com

Lead IndIa’s

Car manufacturers across the world suffer delays as factories lie submerged. Gerry Alonso, senior VP of claims at Factory Mutual Insurance Co., noted that the “slow developing” nature of the Thai catastrophe makes it difficult to get a handle on the extent of losses. And, the duration of the flooding could exacerbate the losses. “We’ve had some clients that have been able to procure divers and go in there, but that gives you an idea of what you have.” Mr. Alonso said. “The frustrating part from a claims perspective, you can’t assess losses until the water’s gone.” William J. Montanez, director of risk management at Ace Hardware Corp. and a member of the board of the Risk & Insurance Management Society Inc., said his company hasn’t been affected by either catastrophe, though it relies on overseas suppliers. Mr. Montanez said, “At the back end, we have to look at safeguarding and how we can make it less risky to do it.” With the Thai floods raising awareness of the risk of geographical concentrations of suppliers, Linda Conrad, director of strategic business risk management at Zurich Financial Services Ltd. in New York, said her company has been working with clients to

identify where suppliers and industries are concentrated. “I think this illustrates the need for better continuity plans, including backup supplier arrangements, diversifying the locations of suppliers and using different backup suppliers than competitors.” Ms. Conrad also said companies are starting to ask existing suppliers about their own continuity plans. “People are also starting to do a lot more scenario analysis, including calculating the potential impact of having to re-engineer processes if alternative components or parts don’t match the specifications.” In general, the recent supply chain disruptions are leading many companies to embrace “that resiliency mindset of: Let’s try to think through some hypotheticals and plan for this when it costs us less than when we are in a crisis,” Ms. Conrad said. “At the end of the day I think the onus that’s going to be on risk management and management in general is how can we get a preview of what the future might look like and how will we respond to it,” Mr. Montanez said. “That’s what ERM is all about.”

LOG.India & LW

LW Year

Cover Price By Post

By Courier Online (PDF)

Year Cover Price By Post

1

`600

`550

`900

$ 30

1

`1800

2

`1200

`1000

`1720

$ 50

2

3

`1800

`1600

`2680

$ 75

3

Yes I am interested in the special offer for Fill in BLOCK LETTERS

3 yeares

By Courier

Online (PDF)

`1600

`2120

$ 75

`3200

`2900

`4040

$ 135

`5400

`4100

`6030

$ 200

2 years

1 year

Name:............................................................................................................Designation:................................................................................................... Company.Name:............................................................................................Industry:........................................................................................................ Address:.............................................................................................................................................................................................................................. . City................................................................................................................State...............................................Country................................................... . PIN:...................................................Tel:.No........................................................................................................Fax:......................................................... Mobile.No......................................................................................................E-mail:........................................................................................................... DD./.Cheque.No............................................................................................Drawn.on.(Bank):........................................................................................... Dated:........................................for.`.............................................................in.favour.of.“Hamburg Media Private Limited.” Account.Transfer:.Remittance.should.be.made.to:.1).Beneficiary.Account.:.Hamburg.Media.Private.Limited...2).Account.No.:.0561084000 3).Swift.No.:.DEUTINBBXXX..4).I.Ban.No.:.DE.84500700100953478500..5).IFSC.Code:.DEUT0784BBY..6).MICR.Code:.400200000 7).Information./.proof.of.transfer.with.swift.message.copy.shouldbe.mailed./.faxed.to.Hamburg.Media.Private.Limited.

You can also subcribe for your copies online at: http//logisticsweek.com/shop/

INDIA www.logisticsweek.com

Hamburg Media Pvt. Ltd., Building No.4/6, Sona Udyog, Parsi Panchayat Road (Old Nagardas Road), Andheri (East), Mumbai - 400 069 INDIA Ph: 022-61162345 Email: suhasini@logisticsweek.com


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.