UNIVERSITY OF ALASKA FAIRBANKS CONSTRUCTION PROJECTS – SUMMER 2011 Arctic Health SNRAS Research Greenhouse TPC: $5,325,000 This project will replace the West Ridge Greenhouse which will be removed from the proposed construction site for the Life Sciences Research and Teaching Facility. UAF will construct a new, multiͲlevel, 10,000 gsf research greenhouse connected to the southwest wing of the Arctic Health Research Building. The greenhouse will house the School of Natural Resources and Agricultural Sciences (SNRAS), to conduct northern climate plant research. Completion date is expected in early 2012. (DesignͲBuild) DesignͲBuild Contractor: GHEMM Company, Inc. Subcontractors: Accell Fire, Alaska Air Balancing, Alaska Concrete dba Fairbanks Concrete Pumping, Bucher Glass, Inc., Fullford Electric, Inc., Great Northwest, Inc., Griffard Steel, Inc., HVAC, Inc., Mappa, Inc. & Alaska Analytical Lab, Inc., Patrick Mechanical, Inc., Paving Products, Inc., Performa, Inc., PFK Enterprises, Quality Inspection, Skippy, Inc., Tilly & Company

Arctic Health CANHR Health Clinic TPC: $3,637,000 This project will build about 3200 gsf of new space and renovate another 2800 gsf to support initiatives under the Center for Alaska Native Health research. The facility will include a nutritional and physical assessment lab on the first floor and a shelled out space on the second floor which will be developed with future grants. Expected completion date is March 2012. (DesignͲBidͲBuild) General Contractor: Project award is in progress Subcontractors: TBD

Arctic Health West Parking Lot Improvements TPC: $1,000,000 This project will increase parking spaces in support of the new student population moving to West Ridge after the Life Sciences Facility is completed. Work includes grading and paving the existing dirt lot, and installing lights, headbolt outlets, and electrical panels. (DesignͲBidͲBuild) General Contractor: Exclusive Paving Subcontractors: KJ Enterprise, Paving Products, Inc., Alcan Electric, Inc., Black Gold, Alaska Industrial, Inc.

Page 1 of 5


UAF CTC Revitalization Phase 4 Third Floor Renewal TPC: $4,830,300 This project provides complete renewal of a significant portion of the third floor at UAF CTC. Work will consist of providing new computer classrooms and offices serving UAF CTC departments, demolition of existing mechanical and electrical systems, installation of new ventilation, cooling, heating, plumbing, digital controls, new power distribution, lighting, and new fire alarm distribution upgrades. Completion is expected the end of July 2012. (DesignͲBidͲBuild) General Contractor: Alaska Mechanical, Inc. Subcontractors: Central Environmental, Inc., Interior Mobile Welding and Services, Inc., Architectural Supply Co., Pioneer Glass, Inc., Far North Acoustics, Inc., Commercial Contractors, Gold Insulation, Chinook Fire Protection, Alaska Sheet Metal, Control Contractors, Outlet Electric, Siemens Industries, Inc.

Critical Electrical Distribution Renewal Phase 1B TPC: $10,000,000 Phase 1B scope consists of constructing a building that will house a new double breaker switchboard that will be installed in Phase 1C. The new building is separate from the existing Atkinson Power Plant, but it is located in close proximity to the plant and its associated utilidors. Completion date is to be determined. (Construction Manager at Risk – CM@R) CM@R: Kiewit Building Group Subcontractors: Fullford Electric, Inc., AAA Fence, Arctic Surveys, Overhead Door, Weber, Inc.

Critical Electrical Distribution Renewal Phase 1C TPC: $13,500,000 Phase 1C scope will install all the major electrical equipment in the building constructed in Phase 1B, including switchgear, transformers, switches, and cable for two electrical feeders to be energized. Additional feeders will be energized if funds are available. This project will also provide additional power in building hub rooms as required for VoiceͲOver Internet Protocol (VOIP). The VOIP work has just begun and completion is expected in the fall of 2012. Phase 1C – (Construction Manager at Risk – CM@R). VOIP work – (DesignͲBidͲBuild) Critical Electrical Phase 1C Ͳ CM@R: Kiewit Building Group Subcontractors: TBD Critical Electrical VOIP – General Contractor: Polar Power & Communications, Inc. Subcontractors: None

Page 2 of 5


Energy Technology Facility Phase 1A TPC: $4,700,000 This project, Phase 1A, will prepare the site for the Energy Technology Facility (project ETWP), and will construct the four alternative energy test bay modules for ACEP in advance of the construction of the main facility. Construction is expected to be complete by the end of 2011. (DesignͲBidͲBuild) General Contractor: Kiewit Building Group Subcontractors: A&A Roofing Co., Inc., Door Systems of Alaska, Inc., BEK of Alaska, Adams ’ Family Painting, Washington Crane and Hoist Co., Inc., SimplexGrinell, Aaron Plumbing and Heating Co., Marshall ’s Electric, Inc., Weber, Inc.

Harper Building Restroom Remodel TPC: $600,000 This project will increase the size of the women ’s restroom from three toilets and two sinks to five toilets and five sinks. The men ’s restroom will be upgraded from two urinals and one toilet to two toilets and one urinal. This project will also create an executive suite with an administrative support area, proximal financial support office, private meeting space, and a waiting area for guests. (DesignͲBidͲBuild) General Contractor: Armstrong Construction, Inc. Subcontractors: Aaron Plumbing and Heating Co., Alaska Ceiling Systems, Bush Painting, Inc., Chinook Fire Protection, Inc., International Electric, Nenana Lumber Company, Plambeck Floor Customs

Hess Village Vinyl Siding Phase 5 TPC: $260,000 This village will install vinyl siding, and replace porches and decks on three buildings in the Hess Village Complex. (DesignͲBidͲBuild) General Contractor: Project award is in progress Subcontractors: TBD

Irving 2 Room 133B Cleanroom TPC: $196,000 This project consists of modifying existing mechanical ventilation, plumbing, fire protection, electrical, and architectural finishes to serve a 115 square foot isolation room located in Irving 2, Room 133. (DesignͲBidͲ Build) General Contractor: Blanket Builders, Inc. Subcontractors: HoladayͲParks, Inc., Star Electric, Inc., Peak Mechanical, Florcraft, Inc. Page 3 of 5


UAF Life Sciences Research and Teaching Facility TPC: $88,275,000 Life Sciences will provide multiuse teaching and research labs, classrooms, and office space for life science research and academic purposes. The research portion will provide nearly 60,000 gsf lab space for biology research. The teaching portion will provide 40,000 gsf of academic classroom and lab space for biology and wildlife degree programs. The Life Sciences project also includes expansion of the West Ridge utilidor steam line, and a greenhouse replacement. Completion expected by fall 2013. (Construction Manager at Risk – CM@R) CM@R: Davis Constructors and Engineers, Inc. Subcontractors: Alaska Concrete Pumping, Inc., Edie ’s Boom Truck Service, Fullford Electric, Inc., HC Contractors, Inc., Iron, Inc., Mappa, Inc., North Star Terminal & Stevedore Co., LLC, Patrick Mechanical, Inc., Stutzmann Engineering, Swanson Steel Erectors, Inc., Voorhees Concrete Cutting Specialists

Residence Life Dormitory Carpet Replacement TPC: $294,030 This project removes old carpet and installs new carpet, tile and resilient tile flooring throughout the Lathrop Hall and Nerland Hall student dormitories. Stairways and landings will require demo and retrofitting for new resilient tile flooring, stair treads, risers, and stringers. (DesignͲBidͲBuild) General Contractor: Eastside Carpet Company, LLC Subcontractors: None

Reverse Osmosis Building Repair TPC: $140,000 This project consists of the demolition and replacement of approximately 400 square feet of structural slab and associated plumbing modifications in the Reverse Osmosis Building. (DesignͲBidͲBuild) General Contractor: Blanket Builders, Inc. Subcontractors: Interior Mobile Welding & Services, Inc., Peak Mechanical, Safeway Services, LLC, Voorhees, Inc.

Page 4 of 5


Stuart Hall Egress and Kitchen Remodel TPC: $310,000 This project will resize bedroom windows in all units. Ground floor apartment bedroom window improvements will require foundation wall modifications and installation of window wells. Remaining windows will be repaired or reglazed where necessary. (DesignͲBidͲBuild) General Contractor: City Construction Company Subcontractors: MacCheyne ’s Carpet Plus, Perfection Painting, Polar Power & Communications, Inc., Voorhees Concrete Cutting

Utilities Waste Line Repair – Lining from Lola Tilly to SRC TPC: $600,000 This project inspects, cleans and lines the sanitary sewer line from Lola Tilly Commons to the Student Recreational Center. (DesignͲBidͲBuild) General Contractor: Frawner Corporation Subcontractors: None

Utilities West Ridge Steam Capacity Expansion TPC: $15,000,000 This project installs a 10Ͳinch steam line and a 6Ͳinch condensate line from the Atkinson Power Plant to the West Ridge in the vicinity of the Arctic Health Building to increase the steam capacity for West Ridge and the new Life Sciences Facility. A new utilidor will also be constructed to house the steam piping and other utilities from the utilidor near the Lola Tilly Building to the Utilidor west of the Student Recreation Center. Completion expected fall 2012. (DesignͲBuild) DesignͲBuild Contractor: Kiewit Building Group, Inc. Subcontractors: Interior Alaska Roofing, Inc., Weber, Inc., Northern Reinforcing Placers, Inc., Patrick Mechanical, Inc., Miranda Electric, Inc.

Page 5 of 5