Rabobank Advice Centre Project information Owner Architect General Contractor Engineering Office Construction Period Location

Sint-Oedenrode, The Netherlands

Rabobank Architektenburo Roos en Ros BNI BNA Bouwbedrijf Gebr. van Stiphout b.v. Advies- en Ingenieursbureau voor Bouwconstructies Van de Laar From February 2010 to April 2011 Sint-Oedenrode, The Netherlands Short project description

Category 4: Industrialized Planning

This project concerns the engineering and fabrication of the prefabricated reinforced concrete structure for a new Rabobank Group office building in Sint-Oedenrode. The engineering included not only the making of the drawings of the elements, but also those for the detailing regarding the assembly of the elements. The fact that the assembly of the prefabricated concrete construction was possible in just 5 weeks was also the result of using Allplan Engineering. By visualizing the construction, including the steel construction, any possible problems were discovered in an early stadium.

4

Nemetschek Engineering User Contest 2011 - Category 4: Industrialized Planning

193


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.