Zhong Ren Huang

Page 1

SELECTED

WORK SAMPLES PROFESSIONAL /ACADEMIC

ZHONG REN HUANG

AIA, LEED BD+C, NCARB Columbia University New York Master of Science In Advanced Architectural Design California Polytechnic State University San Luis Obispo Bachelor Of Architecture


Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135

SELECTED

WORK SAMPLES PROFESSIONAL /ACADEMIC ZHONG REN HUANG

AIA, LEED BD+C, NCARB Columbia University New York Master of Science In Advanced Architectural Design California Polytechnic State University San Luis Obispo Bachelor Of Architecture

PROFESSIONAL PROJECTS Handel ARCHITECTS ASSOCIATE : July 2011 - Present

Port Imperial Site 12 Weehawken, NJ

Cathedral Church of Saint John the Divine North Site New York, NY

99 Hudson St Jersey City, NJ

180_2nd Ave New York, NY

STEVEN EHRLICH ARCHITECTS Internship : September 2009 - April 2010

Media Arts/Performing Arts Center Los Angeles Valley College, California.

the Federal National Council’s New Parliament Building Complex United Arab Emirates


01

Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135 Port Imperial Site 12 A302

0'-0" ORIGIN POINT

0'-0" ORIGIN POINT

PROPERTY LINE

Port imperial Site 12 Weehawken, New Jersey

SEE

SEE

SEE

SEE 02 A302

PROPERTY LINE

Team: Handel Architects

17

Phases involved in: Feasibility Study | Pre Design | Schematic Design | Design Development | Construction Document |Construction Admistration - New 7 story with 103 units residential tower. - Role: zoning compliance | code research | massings studies | presentational drawing and renderings for client meetings | design facade | detail facade | landscape design | unit planning and layouts | ADA compliance for kitchen and bath egress | coordination with consultants for tower core Respond to Requests for Information (RFI) | Issue Architect’s Supplemental Instructions (ASI) | Process shop drawings and submittals | Process Change Orders | Review and certify contractor’s application for payment | Review material test reports | Record changes to the contract documents | Provide substantial and final completion services

18

20

19

22

23

24

25

27

26

28

29

30

31

32

33

34

35

36

37

39

38

98

97

16

21

99

100 105 102

101 15

103

104

40

106

96 UP ST2 DN

14

41

COMM. CLOSET

115 ELEV. LOBBY

ST1 UP DN

PE1

114

13

113

112

111

110

109

107 108

PE2

42

02 A301

95

12

43

116 61

11

60

62 10

59

58

57

56

55

54

53

52

51

50

49

48

47

46

45

44

94

SEE DWG. A104A

63

117

SEE DWG. A104B

SEE DWG. A104C

09

SEE DWG. A104D

SEE DWG. A104E

64 93

08

67

65 07

68

69

70

71

72

73

118 66

06

74A

175 ELEC CL.

92

01

TRASH RM

UP ST4 DN

MEHC.ROOM

ELEV. LOBBY 119

DN UP ST3 04

03

120 75

123

124

02

A301

74

COMM. CLOSET PE3

05

90

121

122

76

77

01

87

84

83

82

81

79

80

78

PROPERTY LINE

89

Site SEE DWG. A104E

SEE DWG. A104E

SEE DWG. A104D

10"

8"

PROPERTY LINE

OWNER

LENNAR UST LENNAR PIS 12, LP 1 FERRY LANDING CIRCLE WEEHAWKEN, NJ 07086 T: 201.325.8611

1'-9"

9'-6"

8'-10"

ARCHITECT

RESIDENTIAL UNIT

RESIDENTIAL UNIT

9 A481

1

WEIDLINGER ASSOCIATES 40 Wall Street, 19th Floor New York, NY 10005 T: 212.367.3000

9'-6"

8'-10"

3'-7"

STRUCTURAL ENGINEER

1'-9"

3 A362

HANDEL ARCHITECTS, LLP 150 VARICK STREET 8TH NEW YORK, NY, 10013 T: 212.595.4112

4TH FLOOR PLAN

M.E.P. ENGINEER LKU GROUP, INC 241 MOLNAR DRIVE, SUITE ELMWOOD PARK, NJ 0740 T: 201.791.1210

26 A352

1/4"=1'-0"

CONCRETE PARAPET W/ MINERAL SILICATE COATING SYSTEM, MC-1 2'-0"

1'-0"

CIVIL ENGINEER

1'-0"

10"

1'-0"

8"

1'-0"

5'-0"

OMLAND ENGINEERING A 303 W. MAIN STREET SUITE 3 FREEHOLD, NJ 07728 T: 732-665-5500 INTERIOR DESIGNER

TYP.

1'-6"

CONT. 1/2" X1/2" DRIP EDGE, OCCURS ON ALL OPEN SIDES OF LEDGE

INTERIOR DESIGN ASSOC 618 CHURCH STREET, SUI NASHVILLE, TN 37219 T: 615-320-7550

8"

WINDOW TYPE 2.2, GL-2 SEE WINDOW TYPE DWG

10"

6" BATT INSULATION AT UNDERSIDE OF SLAB W/ IN RETAIL SPACE BRICK FINISH, BR-1 W/ RODDED MORTAR JOINTS SECURED TO BACKUP W/ ADJUSTABLE STEEL REINFORCEMENT

LANDSCAPE ARCHITECT

FOIL FACED - BATT INSULATION PINNED TO BACKUP WALL CONT. 1/2" X1/2" DRIP EDGE, OCCURS ON ALL OPEN SIDES OF LEDGE

4'-10"

GEOTECHNICAL ENGINEE McLAREN ENGINEERING G 100 SNAKE HILL ROAD WEST NYACK, NY 10994 T:845-353-6400

8'-10"

11'-0"

10'-4"

STRUCTURAL BEAM, SEE STRUCTURAL DWGS

RESIDENTIAL UNIT

MELILLO + BAUER ASSOC LANDSCAPE ARCHITECTU 200 UNION AVENUE BRIELLE, NEW JERSEY 08

CONCRETE BLOCK BACKUP

42" HEIGHT GLASS PANEL GLAV. STL GUARDRAIL, GL-3

PAINT EXPOSED LINTEL TO MATCH BRICK COLOR

DATE 03.17.14 05.05.14 07.11.14 10.15.14 11.07.14

FACE OF BRICK, BEYOND STRUCTURAL COLUMN, BEYOND

42" HEIGHT GLASS PANEL GLAV. STL GUARDRAIL, GL-3

STRUCTURAL COLUMN, BEYOND

INSULATED GLASS AND ALUM. SLIDING WINDOW UNIT, WINDOW TYPE 2.1, GL-1, SEE WINDOW TYPE DWG

COLUMN COVER, BEYOND

STRUCTURAL COLUMN, BEYOND

FINISHED FLOOR SEE SCEHDULE

FOUNDAT

ISSUE

BLDG. D

COLUMN COVER, BEYOND FINISHED FLOOR SEE SCEHDULE

PAINTED ALUM. PANEL, MTL-1

1'-6"

SEAL & SIGNATURE

6" 20'-11"

6" 8"

PAINTED ALUM. PANEL, MTL-1

RESIDENTIAL UNIT

9'-6"

8'-10"

RESIDENTIAL UNIT

10'-4"

9'-8"

PORT IMPERIAL AVENUE

13'-4"

10"

8"

CONCRETE LEDGE W/ MINERAL SILICATE COATING SYSTEM

10"

CONCRETE LEDGE W/ MINERAL SILICATE COATING SYSTEM

RESIDENTIAL UNIT

CONC. WALL W/MINERAL SILICATE COATING, MC-1, BEYOND

INSULATED GLASS AND ALUM. SLIDING WINDOW UNIT, WINDOW TYPE 2.2, GL-1, SEE WINDOW TYPE DWG

9'-6"

8'-10"

CONC. WALL W/MINERAL SILICATE COATING, MC-1, BEYOND

RETAIL B

INSULATED GLASS AND ALUM. STOREFRONT, WINDOW TYPE 4.3 FINISHED FLOOR, N.I.C GRANITE SILL, ST-15

A352

2'-0"

1, 2, 3 1'-0"

1'-0"

10"

10"

8"

8"

1'-0"

5'-0"

KEY PLAN

ANCHOR PLATE BOLTED TO CONC. CURB AND GRANITE SILL - SEAL ALL EDGES AND FASTENERS

26

SCALE: PROJECT NO: DRAWING TITLE:

6" BATT INSULATION AT UNDERSIDE OF SLAB W/ IN RETAIL SPACE BRICK FINISH, BR-1 W/ RODDED MORTAR JOINTS SECURED TO BACKUP W/ ADJUSTABLE STEEL REINFORCEMENT

3

WALL SECTION WEST FACADE @ RETAIL B LEVEL 6-ROOF Scale: 3/4"=1'-0"

2

WALL SECTION WEST FACADE @ RETAIL B LEVEL 3-5 Scale: 3/4"=1'-0"

1

WALL SECTION WEST FACADE @ RETAIL B LEVEL 1-2 Scale: 3/4"=1'-0"

DRAWING NO:

4

5


Site12

Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135 Port Imperial Site 12

Port imperial Site 12 Weehawken, New Jersey

OWNER LENNAR UST LENNAR PIS 12, LP 1 FERRY LANDING CIRCLE WEEHAWKEN, NJ 07086 T: 201.325.8611

Team: Handel Architects

ARCHITECT HANDEL ARCHITECTS, LLP 150 VARICK STREET 8TH FLOOR NEW YORK, NY, 10013 T: 212.595.4112

RESIDENTIAL UNIT 26

WOOD TRELLIS, WD-12

A352

STRUCTURAL ENGINEER WEIDLINGER ASSOCIATES, INC. 40 Wall Street, 19th Floor New York, NY 10005 T: 212.367.3000

5 A362

M.E.P. ENGINEER LKU GROUP, INC 241 MOLNAR DRIVE, SUITE 201 ELMWOOD PARK, NJ 07407 T: 201.791.1210 CIVIL ENGINEER OMLAND ENGINEERING ASSOCIATES, INC. 303 W. MAIN STREET SUITE 350 FREEHOLD, NJ 07728 T: 732-665-5500

2" RIGID INSULATION CLIPPED TO UNDERSIDE OF SLAB

INTERIOR DESIGNER

W/ ADJUSTABLE STEEL REINFORCEMENT

INTERIOR DESIGN ASSOCIATES, INC. 618 CHURCH STREET, SUITE 400 NASHVILLE, TN 37219 T: 615-320-7550

CONCRETE BLOCK BACKUP 6" BATT INSULATION AT UNDERSIDE OF SLAB

4'-10"

Phases involved in: Feasibility Study | Pre Design | Schematic Design | Design Development | Construction Document |Construction Admistration - New 7 story with 103 units residential tower. - Role: zoning compliance | code research | massings studies | presentational drawing and renderings for client meetings | design facade | detail facade | landscape design | unit planning and layouts | ADA compliance for kitchen and bath egress | coordination with consultants for tower core Respond to Requests for Information (RFI) | Issue Architect’s Supplemental Instructions (ASI) | Process shop drawings and submittals | Process Change Orders | Review and certify contractor’s application for payment | Review material test reports | Record changes to the contract documents | Provide substantial and final completion services

5/8" CEMENT BD ON 2 1/2" METAL FRAMING W/ FOIL FACED BAIT INSULATION FULL DEPTH OF STUD

STRUCTURAL BEAM, SEE STRUCTURAL DWGS CONT. PTD STL. RELIEVING ANGLE BOLTED TO CONCRETE LEDGE, SEE STRUCTURAL DWGS

LANDSCAPE ARCHITECT MELILLO + BAUER ASSOCIATES, INC. LANDSCAPE ARCHITECTURE 200 UNION AVENUE BRIELLE, NEW JERSEY 08730

7 A361

CONCEALED BRICK LINTEL SYSTEM ANCHORED TO CONCRETE BEAM

BRICK SOFFIT, BR-1

GEOTECHNICAL ENGINEER McLAREN ENGINEERING GROUP 100 SNAKE HILL ROAD WEST NYACK, NY 10994 T:845-353-6400

SEE I.D DWGS FOR CEILING LAYOUT

6 A361

HUNG STL. LINTEL W/ HANGER, SEE STRUCTURAL DWGS FOR SIZE AND LAYOUT

3'-7"

STRUCTURAL COLUMN, BEYOND SUSPENDED EXT. GRADE GWB CEILING, SEE RCP DWGS EXTERIOR LIGHTING FIXTURE, SEE RCP DWGS

DATE 03.17.14 05.05.14 07.11.14 11.07.14

11'-7"

PAINTED ALUM. PLATE COLUMN COVER, MTL-2

ISSUANCE FOUNDATION / WINDOW BID SET BUILDING PERMIT SET ISSUED FOR CONSTRUCTION BLDG. DEPT. CONFORMING SET

SEAL & SIGNATURE

PORT IMPERIAL AVENUE

8'-0"

LOBBY

REVOLVING DOOR, BEYOND TEMPERED GLASS STOREFRONT, WINDOW TYPE 5, GL-4, SEE WINDOW TYPE DWGS FINISHED FLOOR, NIC PAVING ON SETTING BED, ST-17 PAVING JOINTS TO ALIGN W/ INTERIOR PATTERN

ST. STL. HANDRAIL, MTL-3 SIM.

3

4'-7" 5 TREADS @ 11"

A410

ST-17 SOLID STONE TREAD, ST-17

KEY PLAN

Site12 OWNER

1

LENNAR UST LENNAR PIS 12, LP 1 FERRY LANDING CIRCLE WEEHAWKEN, NJ 07086 T: 201.325.8611 ARCHITECT

1/2" TEMPERED GLASS GUARDRAIL, GL-3

HANDEL ARCHITECTS, LLP 150 VARICK STREET 8TH FLOOR NEW YORK, NY, 10013 T: 212.595.4112

1 348

TERRACE CONCRETE CANOPY FRAMING W/ MINERAL SILICATE COATING SYSTEM, MC-1

RESIDENTIAL UNIT

SCALE: PROJECT NO:

4

10"

5" 7"

CIVIL ENGINEER 1'-0"

Scale: 3/4"=1'-0"

10"

1

DRAWING NO:

2" RIGID INSUL. AT UNDERSIDE OF SLAB BRICK FINISH, BR-1 W/ RODDED MORTAR JOINTS SECURED TO BACKUP W/ ADJUSTABLE STEEL REINFORCEMENT

OMLAND ENGINEERING ASSOCIATES, INC. 303 W. MAIN STREET SUITE 350 FREEHOLD, NJ 07728 T: 732-665-5500 INTERIOR DESIGNER

STRUCTURAL STL. TUBE, SEE STRUCTURAL DWG.

CONCRETE BLOCK BACKUP

INTERIOR DESIGN ASSOCIATES, INC. 618 CHURCH STREET, SUITE 400 NASHVILLE, TN 37219 T: 615-320-7550

4'-10"

6" BATT INSULATION AT UNDERSIDE OF SLAB W/ IN RETAIL SPACE

LANDSCAPE ARCHITECT

STRUCTURAL BEAM, SEE STRUCTURAL DWGS CONT. PTD STL. RELIEVING ANGLE BOLTED TO CONCRETE LEDGE, SEE STRUCTURAL DWGS

550

M.E.P. ENGINEER LKU GROUP, INC 241 MOLNAR DRIVE, SUITE 201 ELMWOOD PARK, NJ 07407 T: 201.791.1210

3

WALL SECTION WEST FACADE @ LOBBY ENTRY LEVEL 1-2

STRUCTURAL ENGINEER

WEIDLINGER ASSOCIATES, INC. DRAWING TITLE:40 Wall Street, 19th Floor New York, NY 10005 T: 212.367.3000

5

MELILLO + BAUER ASSOCIATES, INC. LANDSCAPE ARCHITECTURE 200 UNION AVENUE BRIELLE, NEW JERSEY 08730

PAINTED ALUM. LOUVER, MTL-2 PROVIDE INSULATED BLANK-OFF PANELS 2 A361

GEOTECHNICAL ENGINEER McLAREN ENGINEERING GROUP 100 SNAKE HILL ROAD WEST NYACK, NY 10994 T:845-353-6400

CONCEALED BRICK LINTEL SYSTEM ANCHORED TO CONCRETE BEAM

BRICK SOFFIT, BR-1 5/4" THK WOOD PANEL CEILING, WD-11 6

EXTERIOR LIGHTING FIXTURE, SEE RCP DWGS

ISSUANCE FOUNDATION / WINDOW BID SET BUILDING PERMIT SET ISSUED FOR CONSTRUCTION BLDG. DEPT. CONFORMING SET

19'-6"

20'-10"

DATE 03.17.14 05.05.14 07.11.14 11.07.14

SEAL & SIGNATURE

PORT IMPERIAL AVENUE

RETAIL A

STRUCTURAL COLUMN, BEYOND

INSULATED GLASS AND ALUM. STOREFRONT WINDOW TYPE 4.1, SEE WINDOW TYPE DWGS

BRICK PIER, BEYOND

FINISHED FLOOR, NIC

STOREFRONT, BEYOND WOOD BENCH, WD-12

1/8" MTL. PLATE CURB COVER, MTL-2 7 A362

SIDEWALK PAVING, SEE LANDSCAPE DWG

1

1'-0"

KEY PLAN

10"

4"

A410

1

SCALE: PROJECT NO:

550

DRAWING TITLE:

1

WALL SECTION WEST FACADE @ SET BACK AREA RETAIL A ENTRY LEVEL 1-2 Scale: 3/4"=1'-0"

DRAWING NO:

6

7


OWNER MORNINGSIDE ASSOCIATES 400 WEST 59TH STREET, 3R NEW YORK, NY 10019 T: 212.896.5565

Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135 Cathedral Church of Saint John the Divine North Site

Cathedral Church of Saint John the Divine North Site New York, New York .

ARCHITECT HANDEL ARCHITECTS LLP 150 VARICK STREET, 8TH FL NEW YORK, NY 10013 T: 212.595.4112

STRUCTURAL ENGINEER WSP 228 EAST 45TH STREET, 3R NEW YORK, NY 10017 T: 212.687.9888

MEP ENGINEER & LIGHTING COSENTINI ASSOCIATES TWO PENNSYLVANIA PLAZA NEW YORK, NY 10121 T: 212.615.3600

VERTICAL TRANSPORTATIO JOSEPH NETO & ASSOCIAT 1065 AVENUE OF AMERICAS NEW YORK, NY 10018 T: 212.596.4690

EXTERIOR WALL GILSANZ MURRAY STEFICE 129 WEST 27TH STREET, 5T NEW YORK, NY 10017 T: 212.254.0030

Team: Handel Architects

EL. +115.60'

WEST 113TH STREET EL. +124.04'

Phases involved in: Feasibility Study | Pre Design | Schematic Design | Design Development. - New 15 story with 122 units residential tower. - Role: zoning compliance | code research | massings studies | presentational drawing and renderings for client meetings | design facade | detail facade | landscape design | unit planning and layouts | ADA compliance for kitchen and bath.

EL. +126.16'

EL. +126.51'

EL. +125.47'

EL. +122.91'

EL. +118.72'

EL. +120.80'

EL. +124.84'

EL. +116.66'

EL. +115.77'

EL. +122.90'

EL. +126.84'

1

1

2

A301

A201

A302

3

EL. +

A301

EL. +122.22'

EL. +123.62'

EL. +123.00'

EL. +124.18'

EL. +124.77'

EL. +125.40'

EL. +126.07'

EL. +126.62'

EL. +126.97'

EL. +127.14'

EL. +126.86'

EL. +126.47'

EL. +125.69'

EL. +121.73'

EL. +124.1'

PARKING EXIT

PARKING ENTRY

10 502

DOCTOR'S OFFICE 101

3

64A

64B

17

VESTIBULE 114

3TRASH 501 ROOM 104

BATH ROOM 103

PACKAGE ROOM 117

LOBBY 118 2 STORY LOBBY EL. +125.0'

1

A202

2 A202

15

VESTIBULE EL. +122.5' 123

81

3

EL. +123.72'

EL. +123.72'

57

56

UNIT 113 UNIT 112 1 BR 1 BR 601 SF 583 SF

3

55

TOS EL.54 +125.5' TO PLANTING EL. +126.5'

53

52

UNIT 111 UNIT 110 1 BR 1 BR 597 SF 616 SF

51

50

49

48

47

UNIT 109 1 BR 598 SF

46

45

UNIT 108 UNIT 107 1 BR 1 BR 589 SF 595 SF

44

43

42

121

BATH ROOM 129

MULTIPURP. RM. 130

STORAGE 34

41

40

39

38

33

GROUND 37 COVER36

LOBBY

121

118

1

YOGA

MEETING ROOM 132

EL. +116.0'

LOBBY

120

EL. 116.0' A302

131

35 2

EL. 116.0'

CORRIDOR

CORRIDOR

117

133

EL. +112.32'

116

122

115

IS SCHEMATIC PROGR SUPERSTRU FOUNDATION, EL & WINDOWS 10.01.2013 D.O.B. FIL

EL. +113.10' 111

120

DATE 06.17.2013 07.31.2013 09.04.2013

2 A201

127 5

14

5

17

126

124 31

MAIL ROOM 119

83

GROUND COVER

BATH ROOM 128 17

EMR EL. +122.5'

24'-634"

60

LEASING OFFICE 125 PANTRY

5

106 3

EL. +113.92'

3

10

BATH 7 ROOM 115501

17

CORRIDOR

17

A201

EL. +115.50'

EL. +116.00'

502

UNIT 102 SUPERINTENDENT 2BR/2BA 1002 SF

3

EL. +116.60'

EL. +115.0'

8

501

EL. +125.00'

EL. +119.71'

14

GROUND COVER

11 12

EL. +120.72'

H.C. PLAZA ENTRY

RESIDENTIAL ENTRY

EL. +123.91'

ACOUSTICS CERAMI & ASSOCIATES 404 FIFTH AVENUE, 5#8 NEW YORK, NY 10018 T: 212.370.1776

EL. +111.5'

3 LOADING EL. +101.6' 502

114 DN

7

TAX LOT LIINE 1

1 A-126 EL. +125.0'

1

A202

1

A-127

A-128 EL. +128.02'

EL. +126.5'

1

1

A-129

A-130 EL. +120.01'

KEY PLAN

CLOISTER

EL.+132.0'

EL. +113.4' (LOWER LEVEL)

EL. +125.4'

AMSTERDAM AVENUE

W 113TH ST.

5 RISES @ 0.54'

EL. +113.54'

EL. +132.0'

W 110TH ST.

SYMBOL LEGEND: (SEE G SERIES FOR ADDITIONAL SYMBOLS)

FD HB

CMU WALL

1.

ALL CORRIDOR AND STAIR WALLS SHALL BE 2-HOUR RATED WALL

CAST IN PLACE CONCRETE

2.

ALL DEMISING WALLS BETWEEN RESIDENTIAL UNITS SHALL BE 1-HOUR RATED WALL, U.O.N.

INDICATES OPENING IN SLAB

3.

ALL RESIDENTIAL INTERIOR PARTITIONS SHALL BE NON-RATED WALL, U.O.N.

4.

ALL ENCLOSING WALLS AT MECHANICAL RISERS (EXHAUST AND VENTILATION) SHALL BE 2-HOUR RATED WALL, U.O.N.

FLOOR DRAIN HOSE BIB KITCHEN EXHAUST

KE TOILET EXHAUST TE HP

VERTICAL STACKED HEAT PUMP

W

WASHER

D

DRYER

5.

ALL WALLS AT TRASH CHUTE RISERS SHALL BE 2-HOUR RATED CONCRETE CONSTRUCTION OR MASONRY WALL.

6.

ALL FURRING WALLS AT EXTERIOR WALL SHALL BE NON-RATED WALL WITH 3" INSULATION

7.

ALL PLUMBING CHASE SHALL BE NON-RATED WALL, U.O.N.

8.

PROVIDE WATER RESISTANT GWB IN ALL AREAS HAVING A WATER SOURCE INCLUDING BUT NOT LIMITED TO BATHROOMS AND UTILITY CLOSETS.

9.

PROVIDE 16 GA. METAL GROUNDS FOR ATTACHMENT OF MILLWORK, GRAB BARS, BATHROOM ACCESSORIES AND OTHER SIMILAR ITEMS REQUIRING SUPPORT.

10.

ALL FLOOR DRAINS ARE TO BE FLUSH WITH THR FINISHED FLOOR, U.O.N.

11.

REFER TO DRAWING G004 FOR HANDICAP CLEARANCES

12.

ALL CLOSETS ARE 2'-0" DEEP MIN. WITH ONE HANG ROD AND STANDARD SHELF. CLOSETS SHOWN GREATER THAN 4'-8" DEEP HAVE TWO HANG RODS AND STANDARD SHELF.

13.

FIRESTOP ALL PLUMBING SLAB PENETRATIONS

1/

SCALE: PROJECT NO:

KEYED NOTES:

GENERAL NOTES:

1

CUSTOM FRONT DESK

11

METAL GRATING AIR INTAKE LOUVER, TYP.

2

PROVIDE MAIL BOX

12

TRENCH DRAIN

3

ROLL DOWN DOOR

13

METAL FENCE TO MATCH EXISTING CATHEDRAL SITE

4

NOT USED

14

PRECAST PAVERS

5

GRANITE FLOOR

15

PRECAST STEPS

6

SKY LIGHT ABOVE

16

EXHAUST

7

RETAINING WALL

17

8

SIAMESE CONNECTION

SEE G-004 8C-F & 6D-G FOR ACCESSIBLE MOUNTING HEIGHTS AND CLEARANCES

9

ENTRY CANOPY

10

RAILING

DRAWI

SEAL & SIGNATURE

THE NORTH GR DEVELOPM PROJEC

ON THE GROUNDS OF THE C OF SAINT JOHN THE D DRAWING NO:

A-101.

OWNER MORNINGSIDE ASSOCIAT 400 WEST 59TH STREET, NEW YORK, NY 10019 T: 212.896.5565

N

ARCHITECT 1 HANDEL ARCHITECTS LL 150 VARICK STREET, 8TH NEW YORK, NY 10013 T: 212.595.4112

STRUCTURAL ENGINEER WSP 228 EAST 45TH STREET, NEW YORK, NY 10017 T: 212.687.9888

MEP ENGINEER & LIGHTI COSENTINI ASSOCIATES TWO PENNSYLVANIA PLA NEW YORK, NY 10121 T: 212.615.3600

VERTICAL TRANSPORTA JOSEPH NETO & ASSOCI 1065 AVENUE OF AMERIC NEW YORK, NY 10018 T: 212.596.4690

1 2"'CHAMFER @ COLUMN EDGES

MTL-1 CONC-2

PAINTED WINDOW WALL MULLION

EXTERIOR WALL GILSANZ MURRAY STEFI 129 WEST 27TH STREET, NEW YORK, NY 10017 T: 212.254.0030

1 2"'CHAMFER @ COLUMN EDGES

ACOUSTICS CERAMI & ASSOCIATES 404 FIFTH AVENUE, 5#8 NEW YORK, NY 10018 T: 212.370.1776

CONC-1

CONCRETE COLUMN

GL-1

CASEMENT WINDOW REUSABLE CONC. ANCHOR FOR WINDOWWASHING ROLLER SHADE

GL-1

DATE 06.17.2013 07.31.2013 09.04.2013

FIXED LITE

SCHEMA PRO SUPERST FOUNDATION, & WINDOW D.O.B 10.01.2013

KEY PLAN

PARTIAL ELEVATION

3

1/2"=1'-0"

SECTION

W 113TH S

1/2"=1'-0"

AMSTERDAM AVENUE

2

3" SEMI-RIGID MINERAL FIBER INSULATION AT 4.2 R/INCH

CONC-2

W 110TH S SCALE: PROJECT NO: SEAL & SIGNATURE

SLAB EDGE

1

8

GENERAL NOTE: SEE A-240 & A-241 FOR WINDOW SCHEDULE SEE A-430 AND A-431 FOR WINDOW DETAILS SEE A440 &A-441 FOR TYPICAL ROOF DETAILS

DRA

S

DRAWING NO:

A-402

PARTIAL PLAN 1/2"=1'-0"

9


SELECTED

WORK SAMPLES PROFESSIONAL /ACADEMIC

ZHONG REN HUANG

AIA, LEED BD+C, NCARB Columbia University New York Master of Science In Advanced Architectural Design California Polytechnic State University San Luis Obispo Bachelor Of Architecture


2

BUILDING PROJECTION DIAGRAM 1/16" = 1'-0"

TAX LOT LINE

SEC. 24-51 (c) PERMITTED OBSTRUCTION BUILDING COLUMNS, HAVING AN AGGREGATE WIDTH EQUAL TO NOT MORE THAN 20 PERCENT OF THE AGGREGATE WIDTH OF STREET WALLS OF A BUILDING.

Cathedral Church of Saint John the Divine North Site New York, New York .

Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135 Cathedral Church of Saint John the Divine North Site

AGGREGATE WIDTH OF THE STREET WALL AT ANY ONE LEVEL = 474.1' .20 X 474.1' = 94.82' ALLOWABLE AGGREGATE WIDTH OF COLUMNS AT ANY ONE LEVEL = 65' (26 COLUMNS X 2.5' WIDE EACH). COMPLIES.

Team: Handel Architects Phases involved in: Feasibility Study | Pre Design | Schematic Design | Design Development. - New 15 story with 122 units residential tower. - Role: zoning compliance | code research | massings studies | presentational drawing and renderings for client meetings | design facade | detail facade | landscape design | unit planning and layouts | ADA compliance for kitchen and bath.

101.4'

68.5'

304.2' 474.1'

1

NORTH EXTERIOR ELEVATION DIAGRAM 1/16" = 1'-0"

T.O BULK HEAD EL. 272.95'

PROPERTY LINE

TAX LOT LINE

PROPERTY LINE

T.O. BULKHEAD EL. +272.95'

TAX LOT LINE

22.78'

T.O. ROOF EL. +264.33'

15TH FLOOR EL. +253.25' 14TH FLOOR EL. +244.17' 13TH FLOOR EL. +235.08' 12TH FLOOR EL. +226.00' 11TH FLOOR EL. +216.92' 10TH FLOOR EL. +207.83' 9TH FLOOR EL. +198.75' 8TH FLOOR EL. +189.67'

15.0'

7TH FLOOR EL. +180.58' 6TH FLOOR EL. +171.50' 5TH FLOOR EL. +162.42'

PERMITTED OBSTRUCTION

0.3' 15.0'

4TH FLOOR EL. +153.33' 3RD FLOOR EL. +144.25' PLAZA EL. 132'

2ND FLOOR EL. +135.17'

WEST 113TH STREET

WEST 113TH STREET

16.0'

THROUGH LOT PORTION 1 A.C.L.

GROUND EL. +125.00'

LOBBY EL. 116'

WE

14.5'

CORNER LOT A A.C.L. EL. +121.29'

CELLAR WEST EL. +106.00'

CELLAR EAST EL.101.5'

CELLAR EAST EL. +101.5'

6

SECTION AT THROUGH LOT 1/16" = 1'-0"

NOTE: ALL ELEVATIONS ABOVE MANHATTAN DATUM = 0.0'

5

SECTION AT WEST CORNER LOT A 1/16" = 1'-0"

NOTE: ALL ELEVATIONS ABOVE MANHATTAN DATUM = 0.0'

11

10

W. 113th STREET (NARROW STREET)


Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135 99 Hudson Street

99 Hudson street Jersey City, NJ .

1

Team: Handel Architects

A-201

2 A-301

Phases involved in: Pre Design | Schematic Design | Design Development | Construction Document. - New 52 story with 619 units residential tower. - Role: massings studies | presentational drawing and renderings for client meetings|landscape design | unit planning layouts | ADA compliance for kitchen and bath | egress | coordination with consultants for tower core.

1

2514 2 2 BED B5 948 SF

3

2512 STUDIO S5 412 SF

2510 1 BR A9 741 SF

4

2508 2 BED+ B2 1173 SF

5

2504 1 BED+ A10 803 SF

7

8

2502 1 BED+ A7 794 SF

9

10

27

26

25

2506 STUDIO+ S6 596 SF

6

AP

AP

AP

AP

AP

2

TX8

A-201

TX9

TX8

TX6 TX6

TX9

KX6 KX6

24

11

TX12 TX10

2501 3 BED C 1262 SF

TX11 TX11

UP

TX10

AP

DN

9 KX1

KX2 KX2

1 A-301

VERIFY SLEEVE LAYOUT W/ PLUMBING DRAWING

1

TX4

30

TX3

TX4

TX3

2

KX3

KX3

UP

32

29 DN

KX7

TX2 TX14 TX14

23

TX2

TX1

KX4

22

2515 2 BED B4 988 SF21

2513 2 BED+ B3 1114 SF

20

2511 1 BED A5 705 SF

19

2509 1 BED A4 622 SF

18

12

TX1

KX4

2507 STUDIO+ S3 548 SF

17

16

15

2505 1 BED A3 768 SF

13

14

1 A-164

1

Y = 0'-0"

PROPERTY LINE

A-202

X = 0'-0"

2

25TH-52ND FLOOR PLAN 3/32"=1'-0"

99'-10" FROM GREENE ST PROPERTY LINE

OWNER

99 HUDS 400 PLA SECAUC T: 201.3

ARCHIT HANDEL 150 VAR NEW YO T:.212.5

STRUCT DESIMO 18 WEST NEW YO T: 212.5

24'-0"

9"

T.O.SLAB

UNIT 2414 2 2 BED B5 948 SF

3

UNIT 2412 STUDIO S5 421 SF

UNIT 2410 1 BR A9 732 SF

4

UNIT 2408 5 2 BED+ B2-ALT 1163 SF

UNIT 2406 STUDIO+ S6 600 SF

6

UNIT 2404 1 BED+ A10

7

8

UNIT 2402 1 BED+ A7 794 SF

9

EXTENT OF COLUMN BEYOND, 803 SF SEE STRUCTURE DRAWINGS

AP

VERTIC VDA INC 5 REGE LIVINGS T: 973.9

AP

T.O.SLAB

AP

AP

9"

AP

LANDSC MELILL 2399 HIG MANASQ T: 732.5

PROVIDE ALTERNATE DEDUCT FOR FIXED WINDOW AT THIS LOCATION, TYP.

27

26

25

8'-11"

PTD. ALUM. FRAMED LOW-E IGU, OPERABLE FOR MAINTENANCE ONLY, GL-1

TX8

TX6

EXPOSED CONCRETE

UP

TX11

CODE C HUGHE 112 W 3 NEW YO T: 212.9

PTD. ALUM. FRAMED FRITTED SPANDREL GLASS, GL-3 PTD. ALUM. FRAMED SPANDREL GLASS, GL-2

KX2

30

TX3

KX1

9'-8"

DN

AP

TX4

11

TX12

TX10

INTERIO WILSON 119 FIFT NEW YO T: 212.2

KX3

UP

32

EXTERI IBA CON 5 HANO NEW YO T: 212.2

SUSTAI STEVEN 61 WAS NORWA T: 203.8

TX9

KX6

24

GEOTEC MELICK 117 CAN SOUTH T: 732.3

CIVIL EN DRESDN 371 WAR JERSEY T: 201.2

10

9'-8"

1

MEP EN EDWAR 315 PAR NEW YO T: 212.3

29

DN

KEY PLA

TX2 TX14

23

12

TX1

KX4

T.O.SLAB

DATE 05/17/20 9'-8"

PTD. ALUM. FRAMED LOW-E IGU, OPERABLE FOR VENTILATION, GL-1

22

1

UNIT 2415 2 BED B4 21 988 SF

20

UNIT 2413 2 BED+ B3 1114 SF

UNIT 2411 1 BED A5 705 SF

19

UNIT 2409 1 BED A4 622 SF

18

17

UNIT 2407 STUDIO+ S3 548 SF

UNIT 2405 1 BED A3- ALT 769 SF

16

15

UNIT 2401 3 BED C1- ALT 1253 SF

14

13 T.O.SLAB

A-164

SEAL &

Y = 0'-0"

X = 0'-0"

1

EXT. WALL ELEVATION

1

SCALE: 1/2" = 1'-0"

EXT. WALL SECTION SCALE: 1/2" = 1'-0"

ACOUSTIC INSULATION

24TH FLOOR PLAN

RIGID INSULATION

3/32"=1'-0"

WOOD SILL

99'-10" FROM GREENE ST PROPERTY LINE

F.O. COLUMN 4" 7"

PROPERTY LINE

3

2'-9" CL

1'-9" CL

4'-6" CL

4"

2'-8" 3'-0"

CL

CL

1'-8"

3'-0" CL

SCALE: PROJEC

F.O. GLAZING

DRAWIN

E.O. SLAB NORTH, WEST AND SOUTH E.O. SLAB EAST ONLY

12

2

EXT. WALL PLAN SCALE: 1/2" = 1'-0"

13

DRAWIN


Y

PROPERTY

X = 0'-0"

2

3/32"=1'-0"

99'-10" FROM GREENE ST PROPERTY LINE

Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135 99 Hudson Street

1

UNIT 2414 2 2 BED B5 948 SF

3

UNIT 2412 STUDIO S5 421 SF

4

UNIT 2410 1 BR A9 732 SF

UNIT 2408 5 2 BED+ B2-ALT 1163 SF

UNIT 2404 1 BED+ A10 803 SF

7

8

UNIT 2402 1 BED+ A7 794 SF

9

10

27

26

25

UNIT 2406 STUDIO+ S6 600 SF

6

AP

AP

AP

AP

AP

TX8

TX6

TX9

KX6

24

11

TX12 TX11

UP

TX10

DN

AP

TX4

KX1

KX2

30

TX3

KX3

UP

32

DN

29

TX2 TX14

23

22

1

UNIT 2415 2 BED B4 21 988 SF

UNIT 2413 2 BED+ B3 1114 SF

20

UNIT 2411 1 BED A5 705 SF

19

18

UNIT 2409 1 BED A4 622 SF

UNIT 2407 STUDIO+ S3 548 SF

17

12

TX1

KX4

UNIT 2405 1 BED A3- ALT 769 SF

16

15

UNIT 2401 3 BED C1- ALT 1253 SF

14

13

A-164

Y = 0'-0"

PROPERTY LINE

OWNER

X = 0'-0"

1

99 HUDSO 400 PLAZA SECAUCUS T: 201.348.

24TH FLOOR PLAN 3/32"=1'-0"

ARCHITEC HANDEL A 150 VARICK NEW YORK T:.212.595.

99'-10" FROM GREENE ST PROPERTY LINE

STRUCTUR DESIMONE 18 WEST 1 NEW YORK T: 212.531.

24'-0"

MEP ENGIN EDWARDS 315 PARK A NEW YORK T: 212.330.

T.O.SLAB 9"

GEOTECHN MELICK-TU 117 CANAL SOUTH BO T: 732.356.

CIVIL ENGI DRESDNER 371 WARRE JERSEY CI T: 201.217.

LANDSCAP MELILLO+B 2399 HIGH MANASQU T: 732.528.

9'-8"

8'-2"

PROVIDE ALTERNATE DEDUCT FOR FIXED WINDOW AT THIS LOCATION, TYP. PTD. ALUM. FRAMED LOW-E IGU, OPERABLE FOR MAINTENANCE ONLY, GL-1

VERTICAL VDA INC 5 REGENT LIVINGSTO T: 973.994.

METAL SILL

EXTERIOR IBA CONSU 5 HANOVE NEW YORK T: 212.232.

T.O.SLAB

1'-6"

RIGID INSULATION

1

2"

SUSTAINA STEVEN W 61 WASHIN NORWALK T: 203.857.

CODE CON HUGHES A 112 W 34TH NEW YORK T: 212.946.

9'-8"

8'-2"

BRICK IN RUNNING BOND, ANCHORED TO SUBSTRATE WITH ADJUSTABLE REINFORCEMENT WALL TIES (TYPICAL), BRK-1

INTERIOR WILSON A 119 FIFTH NEW YORK T: 212.213.

METAL PANEL, MTL-1

21 4"

KEY PLAN

1'-6"

T.O.SLAB

PTD. ALUM. FRAMED LOW-E IGU, OPERABLE FOR VENTILATION, GL-1 6'-11 2"

METAL PANEL BEYOND

DATE 05/17/2013 9'-8"

FACE BRICK BEYOND

TRANSOM

2'-0"

CL

91 2"

METAL PTAC GRILLE

T.O.SLAB

SEAL & SIG

3

EXT. WALL ELEVATION

1

SCALE: 1/2" = 1'-0"

EXT. WALL SECTION SCALE: 1/2" = 1'-0"

ACOUSTIC INSULATION RIGID INSULATION WOOD SILL

SCALE: PROJECT

23 4"

2'-51

EQ. 2'-111

2"

CL

1'-7" 1'-81

2"

CL

EQ.

EQ. 4'-63

2"

CL

2'-73 4" 2'-91

4"

CL

F.O. BRICK

DRAWING

EQ. 4'-63

4"

CL

1'-81

4"

CL

2'-111

2"

CL

31

2"

2"

CL

2

14

81 4"

2"

E.O. SLAB / F.O COLUMN 2'-73 4"

EXT. WALL PLAN SCALE: 1/2" = 1'-0"

DRAWING

15


Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135 180 2nd Ave

180 2nd Ave New York, NY Team: Handel Architects Phases involved in: Feasibility Study - New 28 story with 100 units luxury residential tower. - Role: Developing a marketing book for the client use, which includes zoning compliance | code research | massing studies | presentational drawings and renderings.

E

K AL E 98th Street W

N

5

M IN UT

E 97th Street

Lexington Avenue

1st Avenue

2nd Avenue

Park Avenue

3rd Avenue

E 97th Street

E 95th Street

E 94th Street

E 94th Street

ive

Dr

E 95th Street

R

E 96th Street

FD

E 96th Street

E 92nd Street

E 92nd Street

E 91st Street

E 91st Street

York Avenue

E 93rd Street

5M IN UT EW ALK

E 93rd Street

2nd Avenue

Lexington Avenue

SITE

E 90th Street 1st Avenue

Park Avenue

3rd Avenue

E 90th Street

PERMITTED OPENINGS FOR LIGHT AND AIR

TOWER FLOOR PLATE AREA TO BE GREATER THAN 30% AND LESS THAN 52% (42% +10% FROM TRANSIT LAND USE DISTRICT) OF TOTAL ZONING LOT AREA

N

N T

T

E

E

E

E

R

R

T

T

S

S H

T

94

T

T

S

S A

A E

E

94

T

H

8B

T R D

93

R T

S

S

A

A

E

E

T

93

R

D

S

T S

T

R

E

E E

E

T

T E E R T S D R 93 T S A

60'-0"

60'-0"

T D

S

T

R

E

E

T E E R T S D

R

R

93

93

T

T

S

S

A

A E

64'-0"

64'-0"

E

84 R

T E E

T E

R

E

T

R

S D R 93 T S

E

A

C

T T S H T 94 T S E

A

N

85'-0"

60'-0"

T

E

E R

T

S H T 94

N

N T E E R T S H T

94

T

S

S

A

A

E

E

8B 84

R

55'-0" 60'-0"

T E T S A

93 E

A

S

T

E

R

D

S

94

T

T

R

H

E

S

E

T

T

T

H

S

T

R

E

64'-0"

E

T

N

R

E

E

4 8-

8 2C -4 8 C 8 24 8C

U

C

N

E

8

C

2-

C

V A

R

D

2N

C

E

E

E

U

U

N

N

E

E

U

U

N

N

E

E

NO PERMITTED NO PERMITTED OPENINGS OPENINGS

E

E

V A

V A

94

NOOPENINGS PERMITTED OPENINGS NO PERMITTED

NO PERMITTED NO PERMITTED OPENINGS OPENINGS

D

T

10% OPENING10% PER STORY PER STORY OPENING PERMITTED -PERMITTED DOES NOT - DOES NOT CONTRIBUTECONTRIBUTE TO LIGHT TO LIGHT AND AIR REQUIREMENTS AND AIR REQUIREMENTS

"

30'-0

D

S

"

30'-0

2N

E

V A

A

"

2N

U

D

V A

8B R -8 2 C 8B R -8 2 C

N

E

2N

D

2N

10% OPENING10% PER OPENING STORY PER STORY PERMITTED -PERMITTED NOT - NOT APPLICABLE APPLICABLE TO LIGHT TO LIGHT AND AIR REQUIREMENTS AND AIR REQUIREMENTS

30'-0

8B

8B

V A

IN

A

R

T

D

2N

,T

Q

UNLIMITED OPENINGS UNLIMITED OPENINGS FOR AIR ANDFOR LIGHT AIR AND LIGHT HEIGHT OF STREET WALL REQUIREMENTS REQUIREMENTS ALONG NARROW STREET TO BE BETWEEN HT. 60'-0" MIN., 85'-0" MAX. IN C2-8 ZONE

"

8 2-

C

R

R 8 2-

"

50'-0

"

55'-0

30'-0

C

E

E

U

N

E

E

"

55'-0

10% OPENING10% PER OPENING PER STORY PERMITTED STORY-PERMITTED DOES NOT CONTRIBUTE DOES NOT CONTRIBUTE TO LIGHT AND TOAIR LIGHT AND AIR REQUIREMENTS REQUIREMENTS

15'-0" SETBACK ALONG NARROW STREET

8B R -8 2 C

R

U

V A

NO PERMITTED OPENINGS UNLIMITED OPENINGS UNLIMITED OPENINGS FOR AIR ANDFOR LIGHT AIR AND LIGHT REQUIREMENTS -11 1 REQUIREMENTS 8" " 75'-0 25'-8 1 NO PERMITTED 2" OPENINGS

124'

T

HEIGHT OF STREET WALL ALONG WIDE STREET TO BE BETWEEN HT. 60'-0" MIN., 85'-0" MAX. IN C2-8 ZONE

02

D

8B R -8 2 C

2N

10% OPENING PER STORY PERMITTED - NOT APPLICABLE TO LIGHT AND AIR REQUIREMENTS

NO PERMITTED OPENINGS

18

UNLIMITED OPENINGS FOR AIR AND LIGHT REQUIREMENTS

U F

UNLIMITED OPENINGS FOR AIR AND LIGHT REQUIREMENTS

" TO BE BETWEEN " BASE 55'-0 55'-0 15'-0HT. 55'-0" 15 MIN. '-0" 60'-0" MAX. " WITH 15'-0" SETBACK FROM STREET AND 10'-0" SETBACK FROM REAR YARD LINE IN R8B ZONE.

C 8 R -4 8B C 8 R -4 8B

8 2-

8 2-

8B

R

8 2-

C N

4 8-

C

C

8 2-

C 4 8-

C

4

C

8-

C

C 8 R -4 8B

"

" UNLIMITED OPENINGS UNLIMITED OPENINGS '-0" 10'-0 FOR AIR ANDFOR LIGHT AIR AND LIGHT 10 REQUIREMENTS REQUIREMENTS 10% OPENING PER STORY PERMITTED - DOES NOT " CONTRIBUTE TO LIGHT 30'-0 AND AIR REQUIREMENTS

30'-0 10'-0" SETBACK " ALONG WIDE STREET

8B

60'-0"

"

55'-0

10% OPENING PER STORY PERMITTED DOES NOT CONTRIBUTE TO LIGHT AND AIR REQUIREMENTS

84

8

C 8 R -4 8B

2-

C

55'-0 15'-0 "

"

10'-0

75% OPENING75% PER STORY PER STORY OPENING PERMITTED WITH EASEMENT PERMITTED WITH- EASEMENT DOES NOT CONTRIBUTE TO LIGHT TO LIGHT DOES NOT CONTRIBUTE AND AIR REQUIREMENTS AND AIR REQUIREMENTS

UNLIMITED OPENINGS UNLIMITED OPENINGS FOR AIR ANDFOR LIGHT AIR AND LIGHT REQUIREMENTS REQUIREMENTS

75% OPENINGS 75%FOR OPENINGS FOR AIR AND LIGHT MAX BUILDING HEIGHT AIR AND LIGHT REQUIREMENTS REQUIREMENTS 75'-0" IN R8B ZONE

4 8-

"

UNLIMITED OPENINGS FOR AIR AND LIGHT REQUIREMENTS

15'-0

C

75% OPENING PER STORY PERMITTED WITH EASEMENT DOES NOT CONTRIBUTE TO LIGHT AND AIR REQUIREMENTS

C

55% OF TOTAL ZFA TO UNLIMITED OPENINGSBE ALLOCATED BELOW FOR AIR AND LIGHT EL.+150'-0" WHEN TOWER REQUIREMENTS FLOOR PLATE IS GREATER THAN 40% OF ZONE LOT

75% OPENINGS FOR AIR AND LIGHT REQUIREMENTS

17

16

44

MERCHANTS HOSPITALITY

HANDEL ARCHITECTS LLP

43

HANDEL ARCHITECTS LLP

45


5'-0" 5'-0"

DN

DN

DUPLEX Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135 DUPLEXUNIT UNITPLAN PLAN 180 2nd Ave

DN

DN

27'-6" 5'-0" 27'-6" 5'-0"

BR 1 BR 1

DEN / BR 3 DEN / BR 3

1 OPEN TOBR BELOW 1 OPEN TOBR BELOW

MASTER BR MASTER BR

DEN / BR 3 DEN / BR 3

OPEN TO BELOW OPEN TO BELOW

27'-6" 27'-6"

MASTER BR MASTER BR

12'-0" 12'-0"

12'-0" 12'-0"

12'-0" 12'-0"

12'-0" 12'-0"

12'-0" 12'-0"

12'-0" 12'-0"

5'-0" 5'-0"

UPPER LEVEL UPPER LEVEL

UP

UP

MAID'S ROOM MAID'S ROOM W/D

W/D

27'-6" 5'-0" 27'-6" 5'-0"

W/D

W/D

UP

UP

MAID'S ROOM MAID'S ROOM W/D

LIB / BR 1 LIB / BR 1

W/D W/D

27'-6" 27'-6"

W/D

LIB / BR 1 LIB / BR 1

HANDEL ARCHITECTS LLP

18

Book Final.indd 29

29

9/17/2013 2:37:10 PM

12'-0" 12'-0"

LOWER LEVEL LOWER LEVEL

12'-0" 12'-0"

12'-0" 12'-0"

19


Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135

Media Arts/Performing Arts Center 50,000 square feet

Sections and Sectional physical model

Los Angeles Valley College, California.

H G.8

G

Internship with STEVEN EHRLICH ARCHITECTS

F.7

F

SMALL CONFERENCE ROOM

September 2009-April 2010

I was involved in the schematic design and design phase of the project working directly under the chief designer. Using Revit, my tasks were to accordinate room data sheets to make sure to communicate with consultants.

SPEAKER CLOSET

1

PROJECTION BOOTH

SCREENING THEATER

L1 LOBBY

CONTROL ROOM

E

FACULTY OFFICE 4

DESIGN LAB CLASSROOM

C

LAB THEATRE

CIRCULATION

B

A Roof 2 40' - 0" Top of Parapet - R1 33' - 6" Roof 1 30' - 0" Level 4 28' - 0" Level 3 (Fly Gallery) 25' - 0" Top of Parapet - L1 18' - 6" Level 2 15' - 0" Level 1 0' - 0"

REHEARSAL STUDIO #2

CLASSROOM

LAB THEATRE DRESSING / WAITING ROOMS

SCREENING MECHANICAL ROOM

SCREENING ROOM PLENUM

D

DYE / LAUNDRY

REHEARSAL STUDIO #1

COSTUME SHOP

BDF

Basement -11' -Pit 6" Orchestra Elevator -8' - 0" -15' 6"

North/South Building Section 1 - Through Screening Theater 1/16" = 1'-0"

H G.8

G

F.7

F

E

D

C

B

A Top of Fly 65' - 0" Level 5 (Loading Gallery) 51' - 0" Roof 2 40' - 0" Top of Parapet - R1 33' - 6" Roof 1 30' - 0" Level 4 28' - 0"

BALCONY

L2 LOBBY

BOX OFFICE / SCHEDULING ROOM

L1 LOBBY

CONTROL SUITE (MT)

MAIN THEATER ORCHESTRA SEATING

ORCHESTRA SHELL CIRCULATION STORAGE

MAIN THEATER STAGE/APRON ORCHESTRA PIT

MAIN THEATER PLENUM

CIRCULATION

2

CIRCULATION

TRAP ROOM

BACKSTAGE STORAGE

LIGHTING STORAGE

CIRCULATION

Level 3 (Fly Gallery) 25' - 0" Top of Parapet - L1 18' - 6" Level 2 15' - 0" Level 1 0' - 0" Basement Orchestra Pit -11' -Pit 6" Elevator -8' -- 0" -15' 6"

North/South Building Section 2 - Through Main Theater 1/16" = 1'-0"

K

J

I

H G.8

G

F.7

F

E

D

C

B

A Top of Fly 65' - 0" Level 5 (Loading Gallery) 51' - 0" Roof 2 40' - 0"

FACULTY L2 LOBBY OFFICE 12 EDIT BAY 1

EDITING LAB 1 (35)

RADIO RADIO NEWS EQUIPMENT ENGINEERING STORAGE ROOM OFFICE

NEWSROOM

RADIO LOBBY PODCAST ROOM 2

FACULTY KITCHEN / LOUNGE

MEN'S RESTROOM

L2 LOBBY

L1 LOBBY

CIRCULATION

HORSESHOE THEATRE

STAGE

CIRCULATION

FILM PROC 2

3

Ehrlich Architects

Top of Parapet - R1 33' - 6" Roof 1 30' - 0" Level 4 28' - 0" Level 3 (Fly Gallery) 25' - 0" Top of Parapet - L1 18' - 6" Level 2 15' - 0" Level 1 0' - 0"

SCENE SHOP

PHOTOGRAPHY WET LAB

PHOTOGRAPHY WET LAB

Basement Orchestra Pit -11' 6" -8' -Pit 0" Elevator -15' - 6"

North/South Building Section 3 - Through Horseshoe Theater 1/16" = 1'-0" PROJECT NAME:

LAVC MEDIA ARTS + PERFORMING ARTS COMPLEX

SHEET NAME:

Building Sections

X-1 DATE / TIME STAMP:

11/24/2009

south elevation

west elevation

20

21


Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135

the Federal National Council’s New Parliament Building Complex 50,000 square feet

Physical Model

THE NEW BUILDING FOR FEDERAL NATIONAL COUNCIL,

United Arab Emirates

ABU DHABI-UNITED ARAB EMIRATES

SOLAR (THERMAL GENERATION) PANEL ARRAYS

B U S I N E S S OF F I C E S

B U S I N E S S OF F I C E S

DIRECTORATES OF THE FNC

PRESS / TV AREA

SECTION OF THE COMMITTEES

KINDERGARTEN

PRESS BOX

OFFICE OF FNC SPEAKER VISITORS SEATING

LOBBY

LOBBY

OPEN TO BELOW

MINISTERS OFFICE

LOBBY

MINISTERS OFFICE

B U S I N E S S OF F I C E S

DIRECTORATES OF THE FNC

B U S I N E S S OF F I C E S

DIRECTORATES OF THE FNC

MINISTERS LOBBY

PRAYER HALL

LEVEL 4 - ASSEMBLY HALL CHAMBER MAIN FLOOR •

The Speaker of the FNC, Ministers and Members enter the Assembly Hall at the perimeter and descend to their seats in the stepped chamber. The pulpit for the Speaker of the FNC is located at the lower portion of this level. A private lobby for the President and Speaker of the FNC is located on the south side of the Assembly Hall, with direct access to their positions in the chamber.

5m

10m

PRAYER HALL

OPEN OFFICE

0m

REST HALL

OPEN OFFICE

OPEN OFFICE

OPEN OFFICE

September 2009-April 2010 I was involved in the design phase of the competition working directly under the chief designer, my tasks were to produce schematic sections and elevations for the project.

LOBBY

MINISTERS OFFICE

MEETING

OPEN OFFICE

OPEN OFFICE

Internship with STEVEN EHRLICH ARCHITECTS

VIP / DIPLOMATS LOBBY

MINISTERS OFFICE

OPEN TO BELOW

MEETING

PRESIDENTS LOBBY

FNC SPEAKERS SUITE

MEETING

MEETING

VIP BALCONY

PARL. LOBBY

DIPLOMATS BALCONY

ASSEMBLY HALL

BUSINESS OFFICES

LOBBY

PARL. LOBBY

LOBBY

The TV Rooms are located at the north side of the Assembly Hall, with views into the chamber.

Parliamentary Building West contains The Section of the Directorates. It includes: of ces suites, open of ce, meeting rooms, server rooms, the Section of Printing and Binding and the kindergarten.

Parliamentary Building East contains 36 suites for the Section of the Business Of ces for the Members.

LEVEL 6 - ASSEMBLY HALL CHAMBER, VISITORS’ BALCONY AND MINISTERS’ OFFICES

LEVEL 5 - ASSEMBLY HALL CHAMBER, VIP + DIPLOMAT’S BALCONY AND PRESS BOX

Both Parliamentary Buildings have terraces facing north and south, taking advantage of the views and allowing occupants to take in fresh air and views of greenery.

VIPs and Diplomats enter the Assembly Hall Chamber from the west and east, respectively, the Press enters from the north through a separate lobby.

Both Parliamentary Buildings have a sky-lit atrium, ve stories tall on the south side of the building, which brings in natural light to all levels and enhances the working environment of the occupants.

Parliamentary Building West contains the Section of the Committees and for the Section of Directorates. It includes of ces and exible halls.

The Parliamentary Building East contains 32 suites for the Section of the Business Of ces for the Members.

Both Parliamentary Buildings have terraces facing north, taking advantage of the views and allowing occupants to take in fresh air and views of greenery.

Both Parliamentary Buildings have a sky-lit atrium, ve stories tall on the south side of the building, which brings in natural light to all levels and enhances the working environment of the occupants.

20m

Visitors (the Public) enter the Assembly Hall chamber from the north.

Ministers’ of ces and meeting rooms make up the balance of the level (with separate circulation from the Visitors).

Parliamentary Building west contains Prayer Halls for the Section of the Directorates and a rest hall. The helipad is on the roof.

Both Parliamentary Buildings have a sky-lit atrium, ve stories tall on the south side of the building, which brings in natural light to all levels and enhances the working environment of the occupants.

The ceiling of the Assembly Hall Chamber is domed with an oculus at the center, allowing natural light to penetrate into the space.

Collectors for Solar Thermal Generation, using evacuated heat tubes occupy the open area on the Parliamentary Building roofs, providing hot water for

Parliamentary Building East contains the of ce suite (and private terrace facing the Gulf) for the Speaker of the FNC and the balance of the program of the Section of the Secretariat General.

Skylights are proposed at the perimeter of the Assembly Hall building to bring natural light into the Ministers’ of ces and meeting rooms below. Kitchen support the President’s Suite on the level above.

There are also 17 suites for the Section of the Business Of ces for the Members on the south side building.

The Minister’s of ces have close proximity to the President’s Suite and are connected with an open day-lit stair.

use in the absorption chiller and/or domestic hot water requirements for the building.

The Federal National Council’s New Parliament Building Complex Competition(1st place)

PRES. REC. HALL

ASSEMBLY HALL CHAMBER

TV ROOM

EXISTING ROADWAY

SECTION A

PARKING FOR EXISTING ASSEMBLY HALL AND NEW GOVERNMENT BUILDINGS ON SITE 2

EXISTING ASSEMBLY HALL BUILDING

VIP ENTRANCE LOBBY

CEREMONIAL YARD

VIP OPEN PARKING

VISITORS SEATING PRESS BOX

LOBBY

LOBBY

PEDESTRIAN BRIDGE OVER EXISTING ROADWAY

PRESIDENT’S TERRACE

VISITORS ENTRANCE LOBBY GRAND STAIR

SERVICES

BLDG SERVICE

PARKING PARKING

WATER STORAGE

PARKING

BLDG SERVICE

PARKING

2 - EAST ELEVATION

22

23


Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135

ACADEMIC PROJECTS TEDx Performance Center The Seventh Regiment Armory, New York

LANDSCRAPER

Fashion District, Los Angeles, California

SATELLITE AUTOMOBILE ASSEMBLY FACTORY Pasadena, California

THERMAL BATH Copenhagen, Denmark

URBAN AVAIRY Central Park, New York

COMMUNAL HOUSE Copenhagen, Denmark

SHED PROJECT Bruton, England

KAYAK CLUB

Copenhagen, Denmark

PIXILATED WALL San Luis Obispo, California

FURNITURE:THE COUCH San Luis Obispo, California


Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135

TEDx Performance Center Project Title: TEDx Head Seventh Armory, New York Size: 500 people Auditorium

BRIEF:

The concept for this performance center is to enchance the audience members experience in three different ways; The first experience is the experience of audience of one, which is outside of the auditorium. The second is the experience in simulcast room as a small group. The third is that the experience in auditorium as a large collective group. We believe each has its unique vaule to TEDx experience

TEAM:

David Anderson Louis Kohel Critics [ Josh Prince-Ramus ] Columbia Spring 2011

The Focus: Stage

Third Experrience: Formal

Second Experience: Informal

First Experience: Intimate

Simulcast Area Back of House

Auditorium Projection Screen Stage

26

27


Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135

AUDITORIUM

Typically, the way to bring audience members closer is to introduce balconies.

CONVENTIONAL

28

The problem with conventional balcony is that audience members are somewhat isolated, people in the lower level are not aware of the audience member above.

OUR iNVENTION

We rethink the typical auditorium; the intension is to make the audience members more connected as a collective group visually and physically.

Instead of the isolated balconies, we create levels that are connected with circulations and seating

29


Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135

FINAL MODEL Scale= 1:75 Size = 30”X 42” Material = Basswood

30

31


STUDY MODEL

Scale= 1:100 Size = 12”X 8” Material = White Museum Broad

Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135

FINAL MODEL

WITH SKIN

WITHOUT SKIN

32

33


Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135

34

35


URBAN AVAIRY

Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135

Central Park, New York, NY Square Footage: 1,050,000 sqft Type: Leisure

BRIEF: The idea is to create subliminal experience through rethinking an new typology of skycrapers in the city of New York. The purposal is to purpose a skyscraper which differs from its tradition housing humans, this skyscraper purposes to house bird and reduce their dead rate. In New York city, birds are in danger due our current technology which make possible for buildings to get taller and glass facade more reflective. Taller building and more reflective glass window endanger birds because birds conceive the reflection of sky on the glass facades of tall skyscrapers as true sky, they were injured or died by crashing into the glass window. The height of the skyscraper is as tall as the Time Warner building and it opens to air which want serve as a home for birds. The skyscraper attractors through a strong beam of light, which will grow at night to the sky. Food and vegetation to create nests are available this building.

Critics [ Florian Idenburg/ Jing Lui ] Columbia Summer 2010

DESIGN PROGRESSION Nest

Visitor Circulation path The Protected Circulation Path which goes from the bottom to the top and serves as one of the options circulating

Compressed The Cirulation changes

visitors’ perception on the length of path

Second Path

is added to look at the potential of the interaction of the paths.

Interwined The

Paths which creates transitional points between paths

Inspiration Image

Combined Circulation &

Nest wich blends the human and the birds into one place.

DESIGN PROGRESSION Nest

Visitor Circulation path

1.1

The Protected Circulation Path which goes from the bottom to the top and serves as one of the options circulating

1.1

36

Compressed The Cirulation changes

visitors’ perception on the length of path

1.2

Second Path

is added to look at the potential of the interaction of the paths.

1.3

Interwined The

Paths which creates transitional points between paths

1.4

Inspiration Image

1.5

1.2

1.3

1.4

1.5

1.6

1.7

Combined Circulation &

Nest wich blends the human and the birds into one place.

1.6

1.7

37

37


Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135

DIAGRAMS OF BIRD HABITS

DIAGRAMS OF BIRD BEHAVIORS

Fish Eater/ Summer And Winter Quarter Fish Eater/

Birds which obtain food at the water’s surface Summer And Winter Quarter fulmar red-necked phalarope grey phalarope long-tailed skua arctic skua pomarine skua great skua sabine’s gull kittiwake black tern arctic tern little auk

Piratical Pursuit

Pick Food While In Flight

Black Tern Arctic Tern

manx shearwater great shearwater sooty shearwater red-throated diver black-throated diver white biller dive great crested grebe red-necked grebe goosander razorbill guillemot black guillemot puffin

Skuas

osprey Summer And Winter Quarter black kite manx shearwater osprey lesser black-backed gullL: small great shearwater black kite caspian tern sooty shearwater lesser black-backed gullL: small common tern diver caspian tern littlered-throated tern black-throated diver common tern white biller dive little tern great crested grebe red-necked grebe goosander razorbill guillemot black guillemot puffin

Surface Feeders

Terns Storm Petrels

Fulmar Great Skua

Underwater Feeder (Purse Fish Under Water)

Surface Feeders

Pick Food While Swimming (occasionally Dive)

Little Gull Kittiwake Sabine’s Gull Skuas

distant itself away from the pond, stand still

Phalaropes

Often Dive Little Auke

Osprey Terns

Gannets

Shearwaters

Osprey 30 meter

Gannets

Auks Cornorants Divers Sawbills Grebes

Kingfisher Auks

Grey Heron Bittern Kingfisher

Grey H Bittern

30 meter

dive down 15 meter

38

Birds that feed in rivers, by shore vegetation (perch/stand still and await prey) Birds that feed in rivers, by shore veg (perch/stand still and await prey)

Underwater Feeder (Purse Fish Under Water) Cornorants Divers Sawbills Shearwaters Grebes

distant itself away from the pond, stand still

dive down 15 meter

39


MUSEUM FOR CHANG DAI-CHIEN

Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135 Body Position Studies

Project Title: New Mountain Face Neijiang, China

Square Footage: 50,000 sqft Type: Museum

BRIEF:

Chang Dai Chien is a renown painter in China who has left us an extraordinary and precious ink arts. He has travelled to many continents to archieve arts and get inspirations. One of the place he has been to get inspirations was Dunhuang Art Cave in China, where he has solely lived and painted for a couple years. In the Cave, he has produced many of his famous pieces. The purpose for this museum is to provide the very same experience that Chien has experienced during the years he spent in the Hieroglyphics Art. The spacital paths experience throughout the museum are executed through a study of his drawing positions as he ages. Thus, some sequence of the paths are tilted in the same degree similar to the degree where he drew in certain age of his. His art collections are not just being hung from the ceilings, they are also engraved into wall as hieroglyphics. Architecturally, the building is recessed into the mountain and mediated with the exisiting landscape and creates and a new face of the mountain for the city of Neijiang. Critics [ Benedetta Tagliabue/ Lydia Kallipoliti ] Columbia Fall 2010

Selected to publish in Columbia’s yearly Abstract Book -- Spring 2012

40

41


Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135

generation of the platforms

1. Define the tree locations

2. Giving proper diameter to trees

3. Defining a new curves pattern

4. Merge the existing topo curves to new topo curves .

Museum 1976-1985 Art Exhibitions

Museum 1952-1953 1954-1968 Art Exhibitions

Mediatation Area Public Talk Area Top of Hill

Chinese Opera Theater

Amphitheather Garden

Garden

1976-1985 1969-1975

9 years

6 years

1954-1968 1952-1953

14 years

1950-1951 1949-1950 1946-1948

1 year 1 year 1 year 2 year 1 year 2 year

1944-1945 1941-1943

20 years

1919-1939 1917-1919 1899-1916

Restaurant/Cafe Musuem 1944-1945 1946-1948 1950-1951 Art Exhibitions

Library

Studios Ink Class Practice Rooms Exhibitions

Reception/Gift Shop Entry/Bottom

1919-1939 Art Exhibitions

5. Composite drawing showing all the possible programs 42

43

2 year 7 year


L.A. LANDSCRAPER

Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135

Fashion District, Los Angeles, California Square Footage: 1,050,000 sqft Type: Mixed used: Education Factory, Retail

BRIEF: Fashion garments exist momentarily, being discarded as the fashions change or the garment wares out. Ironically, architecture, despite its inventible eventual decay, are often conceived as monuments which exists beyond temporal constraints. Yet architecture and fashion both provide protection and shelter to the human body, and each has the potential to lend an identity to the people who occupy or wear them. This project focuses on the territory where fashion and architecture share similar fabrication techniques. While fashion fabrication is at a relatively micro scale, architecture makes very similar moves but at a larger scale. This research and design project explores new possibilities of construction techniques from cloth fiber at the architectural scale. Exhibited at Cal Poly NAAB Accreditation Exhibition March 2011 Exhibited at Chumash Thesis Show June 2009 Exhibited at Los Angeles Forum for Architecture and Urban Design May 2009 RECEIVED: AIA CCC HONOR DESIGN AWARD

44

45


Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135

ANALOG MODEL AND DIAGRAMS Green Landscape

Spring 2009

Horizontal and Vertical Circulation

Envelope

Structural Bay

Program Distribution

Cat Walks Production Exhibition Space Commercial Retail Institution Underground Parking

Foundation Structural Grid

BASSWOOD MODEL 30” X 60” X 9” A physical model to study the contextual relationship

01_program diagram

46 Project I

02_structure grid

03_circulation

Landscraper 47


Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135

SATELLITE AUTOMOBILE ASSEMBLY FACTORY

Pasadena, California

Square Footage: 100,000 sqft Type: Commercial

BRIEF:

Like the assemblage of automobiles, this project’s architectonic is conceived as a kit of parts. The building’s three main programs are the assembly line, exhibition hall and design studio. The building inverts the normally private space of car manufactory to a public, urban spectacle. As such, the public can view the construction of the car – the major driver of today’s urbanism. Finally, the design studios are also connected to the assembly line are, so that design process is visually connected to the car assembly space.

Exhibited At Cal Poly Architectural Admission Office

48

49


Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135

SITE ANALYSIS

Spring 2007

Montage of Site Forces

Building Influence

Transportation Influence

+

Noise Influence

+

Spring 2007

Analog Models

Combo

=

Interpretation of the Image Collage

Magazine Collages

BASSWOOD MODEL 18” X 12” X 9”

It is a design technique to quickly identify the programs and circulation during design process through the use of colors.

SITE ANALYSIS First Floor

Section

Second Floor

Grid System

50

Programs Diagram

Main Hallways

Automobile Satellite Assembly Factory 51


Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135

THERMAL BATH Copenhagen, Denmark

Square Footage: 16,000 sqft Type: Leisure

BRIEF: The design intention is to contrast the noisy and busy environment of Copenhagen by creating a calm and relaxing atmosphere on the lake. Situating and submerging the bath in the middle of lake, it creates a disconnection from society, which allows one to escape from stress and enjoy the calm and quiet space.

52

53


Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135

RELAXATION AREA IMMERSIVE

01 bathroom

54 Project III

01. avoid leaking system

Fall 2008

02. relax area

03. island within island

04. switch point between hot and cold bath

05. concrete meets the water

06. entry way

07. light penetration

08. light penetration from the bottom

09.beams of light on the 10. island within island shower area

Thermal Bath 55


COMMUNAL HOUSE

Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135

Copenhagen, Denmark

Square Footage: 3000 sqft Type: Residential BRIEF: The concepts is to create a house to bring neighbors together and breakdown isolation between them and provide an environment for social activities in and for the neighborhood. The form of the building is an expression and is deriving by joining community.

N

56 Project IV

57


Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135

DESIGN DEVELOPMENT

ELEVATIONS

Spring 2008

Shade Study Throughout a Year

The site is very narrow and between two existing residential units. The site is always under the shadow due the fact it is next to a taller residential building. MAIN CIRCULATION

OUTDOOR ROOF SPACE EMERGENCY STAIRCASE 4TH FLOOR

VIEW CONNECTION TO THE CITY

3RD FLOOR 1ST FLOOR

VIEW TO STREET

EXIT

Form Studies

Section B

Section A

The form generated base on the site constraints where lighting is limited.

DRIVEN LIGHT VOID

MAIN CIRCULATION

CIRCULATION DISTRIBUTION

ADJACENT BUILDING UNIT 4TH FLOOR 3RD FLOOR DOUBLE HIGH LOBBY

VIEW CONNECTION TO THE CITY OFFICE

VIEW TO STREET

VENTILATION

DIRECT SUN LIGHT BEDROOM LIVNG ROOM KITCHEN LOBBY

DIFFUSED LIGHT

BATHROOM BATHROOM BEDROOM

Adding Square Footage

Subtract Mass

Add Porosity

DIAGRAMS

Lighten The Mass

ATRIUM

VENTILATION

EXIT

ENTRY

Section C

North Elevation

EXPLODED AXON Kitchen Office Living Room Bedroom Master Bedroom

Programs are organized into two main parts; private program, such as bedrooms and working offices, are all in the right side of the house which have the view to the skyline of the city. The public programs are all in the left side of the house; they are the shared rooms within the house.

The house consists a curtain wall system on the four sides. Channel glass will be fabricated the same height as the floor heights.

EAST FACDE STRUCTURAL STEEL MAIN STRUCTURAL CORE TITANIUM WINDOW FRAME CHANNEL GLASS

NORTH FACADE

CHANNEL GLASS TITANIUM WINDOW FRAME FROSTED GLASS DOOR FRAME

private publ ic

SOUTH FACDE

CHANNEL GLASS CONCRETE SLABS STRUCTURAL STEEL TITANIUM WINDOW FRAME

FROSTED GLASS DOOR FRAME MAIN CIRCULATION DISTRIBUTION

58 Project IV

59


Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135

SHED PROJECT Bruton, England

Square Footage: 600 sqft Type: Artist Retreat

10 m

BRIEF: Our design concept proposes an artist retreat constructed using sustainable materials and methods. The ambition of the project is to take advantage of the serene atmosphere and introduce a structure dedicated to experiencing tranquility, reflection and inspiration through perceptive, contemplative, tactile and sensory space. While maintaining the original footprint to maximize floor area, lines of forces were also extrapolated from the existing diagram to arrive at four exclusive spaces - three pavilions and an outdoor space unified by a covered path – each embodying unique qualities that trigger different senses that facilitate contemplation.

0

1

2.5

5

10 m 2.5

These experiences are housed in an energy and acoustical efficient cordwood masonry structure, which not only help maintain low energy usage due to its effective insulative property, but also filters out noise from the adjacent roads giving the artist a sense of being in a sacred space.

5

The playful arrangement of the windows which was influenced by the relationship of the windows on the existing adjacent house transforms the architecture into a multi-lens that frames and visually connects the artist to the surrounding landscape. Each space employs particular natural elements to offer the artist a diversity of atmospheres to connect with their inner thoughts through sound, touch, smell and sight. A play of light is overlaid to add to the effects.

0

1

Cordwood masonry construction is an economical use for log ends and fallen trees. It consists of stacking whole wood log of various diameters in a bed of mortar, which inherently yields characteristics that blend with the surrounding environment.

60

61


Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135

SECTION EAST-WEST 0

25

50

100

0

25

50

200 cm

100

200 cm

SECTION NORTH-SOUTH 62

63


KAYAK CLUB

Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135

Wilders Plads, Copenhagen, Denmark Square Footage: 6000 sqft Type: Sport Leisure

BRIEF: It is located next to a water front in a cozy district, Copenhagen. The design process is to investigate on kayakers ritual processes of kayaking. A loop is designed to accommodate the process; enter, get changed, get equipped, and kayak out.

64

65


Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135

DESIGN DEVELOPMENT

Spring 2008

Form Development Bend To Gain Views

Conventional Program

The Division of The Kayak Club Program: Leaving and Entering

Twisted To Contact with Water

Skin Development Diamond Penetration Modules Trial 1

Trial 2

Trial 3

Trial 4

60 pairs of modules

15 pairs of modules

15 pairs of modules

30 pairs of modules

B

66 Project V

Kayak Club 67


PIXILATED WALL

Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135 STRATEGY

Spring 2007

On-site material influences used to develop varied patterning density and surface relief.

San Luis Obispo, California

BRIEF: Develop a pre-cast concrete wall to serve as anchor point for future tensile structure and as memorial for patrons, alumni, and donors. Partner with Jai Kumaran

01

02

03

04

DIGITAL WORK

Evolves early formal language and allows for assembly of fabrication drawings.

SITE

Concrete Testing Yard, Cal Poly

68 Project VI

Pixilated Wall

69


UNDER CONSTRUCTION:

Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135

The self consolidated concrete was poured into the 8’ X 8 MDF mold. The black pipes were used to make cavities for threading wall to the concrete columns, which help stabilize the wall in place.

70 Project VI

Pixilated Wall

71


Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135

FURNITURE : THE COUCH Furniture Competition : Vellum 2008

MATERIAL: STEEL

72

73


Zhong Ren Huang,Registered Architect, AIA, LEED BD+C, NCARB 460 West 46th Street #2, New York, NY 10036 USA // (510)590-2135 // zhong.ren.huang@icloud.com // Nationality: United States

//RESUME// - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - EDUCATION 06/2010- 05/2011

Columbia University - New York, NY, USA Master of Science In Advanced Architectural Design

09/2005 - 06/2009

California Polytechnic State University - San Luis Obispo, California, USA Bachelor of Architecture

08/2007- 05/2008

Danish Institute for Study Abroad - Copenhagen, Denmark International Education In Scandinavian Architecture

SKILLS

General: Strong communication and interpersonal skills, strong work ethic and team player, detail oriented with ability to multi-task while meeting various deadlines. Design - Architecture / Interior Renovations /Planning / Graphics/ Research/ Drafting/ 3D modeling/ Rendering/Presentations / Model-making/ Lasercut/ CNC Milling / 3D print / Waterjet Software: Mac/ PC / Adobe Creative Suite / Microsoft Office / AutoCAD / Rhinoceros/ 3DS Max / V-Ray/ Maxwell Languages: Fluent in English, Mandarin and Cantonese.

WORK EXPERIENCE 07/2011 - present

Handel Architects - New York, New York, USA Architect // Work include: high-end condominum/rental buildings and residential towers from the ground up construction. Notable Project[s]: Port Imperial Site 12: Weahawken, NJ: 7-story Condominium/ 103 units- 2/3 Bedroom+ Retail +Parking// Involvment: SD-CA Cathedral - New York, NY : 15-Story Condominium/110 Units - 2/3 Bedrooms + Penthouse + Retail // Involvement: SD-CD 99 Hudson- Jersey City, NJ : 52-Story Rental Apartment+ Penthouse + Retail + Parking // Involvement: SD-CD 180 2nd Ave - New York, NY: 28-story Condominium Renovation/Restoration // Involvement: Feasiblility study + zoning

08/2009 - 04/2010

References: Supervisors:

Rick Kearns Senior Assoicate @ Handel Architects (212) 595-4112 rkearns@handelarchitects.com Note: Rick is my current Project Manager at Handel Architects, please do not contact Rick without my permission as it migh jeopardize the trustworthy relationship I have developed with the firm. Patti Rhee Partner @ Ehrlich Architects (310)237-0885 prhee@ehrlicharchitects.com

Co-workers: Lucas Chung Experiential/Architectural Designer (917)620-3276 lkkchung@gmail.com Rinaldo Perez Architectural Designer (646)239-0229 therinaldoperez@gmail.com

Steven Ehrlich Architects - Culver City, California, USA Intern Architect // Work include: mixed-use development and waterfront resort from the ground up construction Notable Project[s]: Media Arts And Performing Arts Building - Los Angeles, CA : office spaces, a theater, black box theater, // Involvement: SD-DD The Federal National Council’s New Parliament Building Complex: Offices, meeting halls, and visitors’ program// Involvement: SD Haeundae Beach Resort - Busan, Korea: Mixed-use Development - Shopping Mall, Offices, Hotel and Condo // Involvement: SD-DD

05/2008 - 09/2008

Eric Owen Moss Architects - Culver City, California, USA Intern Architect // Work include: theater on parking structure. Notable Project[s]: Warner Parking Structure and Retail, Culver City, CA / Involvement: SD

06/2006 - 09/2006

KTGY Group - Oakland, California, USA Intern Architect // Work include: single family houses and townhouses. Notable Project[s]: Single-Family home, Isleton, CA One Quarry townhouse, Brisbane,CA

HONORS/AWARDS 2011 2009 2005

Animal Architecture Award Third Runner Up Award Recipient for ‘Birdscraper’

AIA CCC Design Competition Award Honorable Mention Award Recipient for ‘L.A. Landscraper’

Bus Shelter Design Competition Award First Place Award Recipient

PUBLICATIONS

74

2011

Abstract: Columbia Yearly Publication_ Museum for Zhang Di-Chien

2011

TEDx East Salon: Presented TEDx Performance Center

2011

Studio Ambition: L.A. Landscraper

2009

AIA CCC:

2004

Laney College Newspaper: Bus Shelter Design Competition Award

Design Honor Award

CONTACT ZHONG REN HUANG 460 W. 46TH STREET APT.2 New York, NY 10036 (510)590-2135 ZHONG.REN.HUANG@ICLOUD.COM


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.