FUND FACT SHEET Utah Department of Transportation, Program Development & STIP
Spring 2014
Pavement Rehabilitation Program The Pavement Rehabilita on Program supports a prescrip ve and cost-effec ve resurfacing, restora on and rehabilita on strategy that prolongs the service life and enhances the safety of exis ng roadways. Projects are limited to pavement surface treatments only, and do not include drainage, roadway realignment, curb, gu er and sidewalk or signal work, with the excep on of replacing signal detec on removed as a result of resurfacing. UDOT’s Central Asset Management division analyzes UDOT’s roadway network condi on each year to determine the percentage of funding allocated to the program.
FUNDING Federal year: October 1
Programmed funding 2013: $149.2 million 2014: $107.2 million Proposed: $107.6 million
CONTACT Region Program Managers and William Lawrence 801 964-4468 billlawrence@Utah.gov
The Regions iden fy pavement rehabilita on projects during the annual STIP workshop, and then present the program amount and project list to the Utah Transporta on Commission for approval at the March or April commission mee ng.
ACCOMPLISHMENTS UDOT maintains 90 to 95 percent of Level 1 roads as Good or Fair and 80 to 90 percent of Level 2 roads as Good or Fair. State roads categories: Level 1, carrying more than 1,000 vehicles or 200 trucks per day or Level 2, carrying less than 1,000 vehicles per day.
Ride quality is evaluated using the International Roughness Index (IRI).
PIN: 88073, 8074, 10031, 11731