UDOT Fund Fact Sheets 2014

Page 17

FUND FACT SHEET Utah Department of Transportation, Program Development & STIP

Spring 2014

Pavement Rehabilitation Program The Pavement Rehabilita on Program supports a prescrip ve and cost-effec ve resurfacing, restora on and rehabilita on strategy that prolongs the service life and enhances the safety of exis ng roadways. Projects are limited to pavement surface treatments only, and do not include drainage, roadway realignment, curb, gu er and sidewalk or signal work, with the excep on of replacing signal detec on removed as a result of resurfacing. UDOT’s Central Asset Management division analyzes UDOT’s roadway network condi on each year to determine the percentage of funding allocated to the program.

FUNDING Federal year: October 1

Programmed funding 2013: $149.2 million 2014: $107.2 million Proposed: $107.6 million

CONTACT Region Program Managers and William Lawrence 801 964-4468 billlawrence@Utah.gov

The Regions iden fy pavement rehabilita on projects during the annual STIP workshop, and then present the program amount and project list to the Utah Transporta on Commission for approval at the March or April commission mee ng.

ACCOMPLISHMENTS UDOT maintains 90 to 95 percent of Level 1 roads as Good or Fair and 80 to 90 percent of Level 2 roads as Good or Fair. State roads categories: Level 1, carrying more than 1,000 vehicles or 200 trucks per day or Level 2, carrying less than 1,000 vehicles per day.

Ride quality is evaluated using the International Roughness Index (IRI).

PIN: 88073, 8074, 10031, 11731

page 17


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.