Univ of Dayton Learning Teaching Center (LTC) Newsletter, Fall 2012

Page 24

Ryan C. Harris Learning Teaching Center Ground Floor - Roesch Library +1302

ROESCH LIBRARY CONSTRUCTION There’s one way in and out of Roesch Library (and the LTC) for the next year. Plan accordingly! The only entrance to Roesch Library is on the first floor, the doors that face campus. The LTC entrance and sidewalk between Roesch and Keller Hall are fenced off. Construction on the exterior of Roesch Library will continue through the academic year. Brick facade will be attached to the exterior stone walls and new, energy efficient windows will be installed. Construction noise is expected during the daytime. A website with up-to-date construction status information is available at: http://www. udayton.edu/libraries/events/libraries_ construction.php

RESERVATIONS IN THE LTC

TRY ANY GRANDE SPECIALTY DRINK ONLY $2.75! Redeemable at The Blend (In the LTC, Ground Floor of Roesch Library) or The Blend Express (Miriam Hall) Offer expires 12/15/12

The LTC’s innovative architecture is designed to encourage discovery, learning, reflection, and conversation. With seminar and meeting spaces, a classroom, a cozy fireplace, and several conversation areas, the LTC is simultaneously a functional meeting space and an experimental, impromptu gathering place. The LTC spaces are available for reservation during our normal operating hours (some restrictions apply). Space is available to non-LTC residents based on the same dates that Kennedy Union uses for scheduling. Spring 2013 reservations begin November 1. Contact 937-229-4898 or use the reservation link at http://LTC.udayton.edu to schedule your events.


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.