829 park avenue apt4b presaleproposal

Page 1

A DESIGN | BUILD PRE-SALE PROPOSAL 829 PARK AVENUE | APT 4/5B | NEW YORK, NY | 10021

THE RENOVATED HOME THE DESIGN | RENOVATION AUTHORITY

TM


PRE-SALE PROPOSAL

8 2 9 PA R K AV E N U E A P T 4 /5 B N E W YO R K , N Y | 1 0 0 2 1


PRE-SALE PROPOSAL

EXCLU SI V E L I ST I N G O F:

LAUREN MUSS & MICHAEL ORME


EXISTING FLOOR PLAN FOYER

MAID'S ROOM

ELEVATOR VESTIBULE

DEN

CL.

CL.

CL.

BEDROOM

DN

REF

CL.

DW

KITCHEN BEDROOM P UP CL.

CL.

LIVING / DINING ROOM

CL.

FP

BEDROOM

CL.

CL.


PROPOSED

FLOOR PLAN

FOYER

WIC ELEVATOR VESTIBULE

BEDROOM / STUDY

MASTER BATH

DRESSING ROOM

CL.

DN

CL.

MASTER BEDROOM

TRASH P/O MIELE DW

MIELE DW

KITCHEN

UC W

UP

UC D

PULLOUT PANTRY

SUB ZERO REF / FRZ

BEDROOM DINING ROOM

LIVING ROOM

FP

CL.

CL.


BUDGETARY GUIDANCE TRADESPEOPLE / CONTRACTORS

CATEGORY PERCENTAGE

TOTAL CATEGORY

Site Safety, Protection, Site Management

1.35%

$16,017.75

Demolition

3.24%

$38,442.60

Carting, Debris, & Site Removals throughout the project

2.66%

$31,560.90

Rough & Trim Electrical

8.35%

$99,072.75

Lighting Package

2.01%

$23,848.65

Fireproofing

PENDING

PENDING

Plumbing

7.49%

$88,868.85

Wood Flooring / Stairs / Soundproofing / Underlayment

4.75%

$56,358.75

HVAC and all associated to this line item

7.67%

$91,004.55

Wood Doors, Jambs, Casings & Installation

3.63%

$43,069.95

Architectural Millwork, Trim and Installation throughout

4.42%

$52,443.30

Rough Carpentry, Trim Carpentry & all associated trades

7.58%

$89,936.70

Building Materials/ Deliveries

2.49%

$29,543.85

Custom Kitchen Cabinets, Bathroom Millwork, & Installation

9.47%

$112,361.55

Painting, Coating, Finishing, Plaster, & Skim Coating

7.35%

$87,207.75

Closet Interiors

2.10%

$24,916.50

Stone, Marble, & Tile Installation

6.78%

$80,444.70

Project & Site Setup

0.89%

$10,559.85

Project Administration Reimbursable

0.16%

$1,898.40


BUDGETARY

GUIDANCE

VENDORS / CLIENT PAYS DIRECT

CATEGORY PERCENTAGE

TOTAL CATEGORY

Plumbing Fixtures, Fittings, Accessories

3.08%

$36,544.20

Mirrors, Glass, & Glazing

1.45%

$17,204.25

Appliances (Allowance)

2.54%

$30,137.10

Windows & Exterior Doors

PENDING

PENDING

Hardware & Decorative

1.62%

$19,221.30

Stone, Marble, & Tile Material throughout project

7.76%

$92,072.40

Fireplaces

1.16%

$13,763.40

Audio & Video Systems, Motorized Shades, & Security Systems

PENDING

PENDING


BUDGETARY GUIDANCE CATEGORY

CATEGORY PERCENTAGE

TOTAL CATEGORY

Total Tradespeople / Vendors Total Square Footage of Residence

2,100

Per Square Foot Value of Renovation

$565.00 100.00%

$1,186,500.00

TRH Architectural (which includes): Drafting, Design, Architecture, Permitting

4.50%

$53,392.50

TRH Construction / General Conditions

20.00%

$237,300.00

TRH Insurance

1.25%

$14,831.25

Total The Renovated Home

25.75%

$305,523.75

Total Construction Costs

The Renovated Home

Total Project Cost

$1,492,023.75