tacomaweekly

Page 3

-YPKH` 1HU\HY` ‹ tacomaweekly.com ‹ :LJ[PVU ( ‹ 7HNL

1909

 â€¨â€ŠRrEeGgAaLl

 â€¨â€Š30 By Steve Dunkelberger stevedunkel@tacomaweekly.com

The Regal Motor Car Company of Detroit built automobiles from 1907 through 1914. The car maker was one of the pioneers in what was once a “cottage industry� filled with dozens of automotive builders that dotted the nation after the turn of the last century. Regal shipped its first 175 cars in 1908, but that launch was less than successful as many of the new car owners immediately began reporting engine troubles. In fact, the cars were so bad that the company recalled the entire line in 1908, marking the first automotive recall in history. This led to their motto “honest with itself, honest with its product, and honest in its dealings with its distributors and owners� as the company struggled to turn a profit while fixing cars it had already sold. Mechanical problems, however,

POTHOLE OF THE WEEK

PHOTO BY STEVE DUNKELBERGER

were quickly corrected and more than 2,000 copies of the updated cars were shipped in 1909. The Regal in the LeMay collection was the 1,411th to come off the assembly line. And they proved reliable. A transcontinental journey of 4,031 miles was set by George Wilcox by

driving the route in just 38 days. The same car repeated the trip five more times, accumulating more than 22,000 miles. The 1909 Regal Model 30 was a five-passenger car that was powered by a four-cylinder engine that produced just 30 horsepower, hence the name.

Murray Morgan Bridge opening delayed a month By Steve Dunkelberger stevedunkel@tacomaweekly.com

Some bad weather earlier this month and some minor repairs found during the renovation have delayed the official opening of the Murray Morgan Bridge another month. It was set to be open before the end of 2012. The new opening date is Feb. 1, with a grand opening ceremony on Feb. 14 complete with fireworks and a car parade. The actual ceremony will happen two weeks after the bridge is open to traffic. The first day won’t have much fanfare, with crews simply set to move the concrete safety barriers and construction signs to the side of the road and let cars drive to the tideflats. There are no plans to have a ceremonial “first car� across the bridge. “A lot of people have asked me that,� City of Tacoma engineer Tom Rutherford said. “I guess it will be whoever is there when we take the barriers down.� The $57.4 million restoration project has been under way since May 2007. “We still have a lot of work to do on the bridge,� Rutherford said, noting that the work includes finishing the seismic retrofit and the installation of the elevator. “It really is a tight quarters out there with all the staging of equipment and things. This way we will be able to work fullbore without having to dodge people driving on the bridge.� About 50 people are working on the bridge site at any given time. Even after the span opens crews will continue working on the bridge to add additional seismic re-enforcements to bring the span up to current standards. The city started work on the bridge after it took ownership of the span from Washington State Department of Transportation, which had been pondering simply removing that link between downtown Tacoma and the waterfront. The agreement called for the state to pay the city $37 million to go toward repairing the aging

Pothole pig’s

PHOTO BY STEVE DUNKELBERGER

:7(5 The Murray Morgan Bridge that connects

11th Street to the Tideflats has been closed since TPK I\[ PZ ZL[ [V YLVWLU I` [OL [PTL [OL ZWHU [\YUZ `LHYZ VSK PU -LIY\HY`

span and support city efforts to gain state and federal grants to further cover the repair costs. Initial estimates put the total repair cost of the bridge at about $62 million. That is less than half of the original $160 million it was expected to cost for a new bridge along the same route. Tacoma argued that the bridge should be saved not only as an iconic city landmark but as a vital roadway between downtown and the Tideflats as the city seeks ways to boost economic development and access to the Center for Urban Waters, existing businesses on the Tideflats, and the proposed developments on the east side of Thea Foss Waterway. The current funding for the bridge will get the span operational for vehicle traffic, but more work will need to be done in future phases, as money allows, to fully bring the span to current standards. In bridge engineering terms, the bridge was closed when it received a safety rating of two on a 100-point scale. Phase I work brought that rating up to about 80. Phase II would increase that rating to about 90. A new bridge is rated at 100. That phase II work will include more seismic upgrades, construction of a new bridge deck, new electrical systems and a fresh coat of black paint, the original color of the bridge. Newer estimates put the cost of that work at between $10 million and $15 million. The drop

in projected costs for the work came after research done after the city first released its initial estimate. Since the additional work is not yet funded, the projects might be split into separate contracts to allow the work to be done as money is available. No time line is available. The first bridge at the location, a swing span over the waterway from South 11th Street, opened in 1894 and provided the only route for Tacomans to take between their homes in the city and the shipping operations on the Tideflats. The current span was designed by the Kansas City firm of Waddell and

Harrington, which also designed Portland’s Hawthorne bridge, and opened in 1915. It was upgraded in 1957, when it became a section of SR-509 between Tacoma and King County. The route was then shifted to the current SR-509 bridge at South 21st Street with the creation of that cable-stay bridge in 1997, which dramatically dropped the traffic along the span from South 11th Street. What followed was a decade of on-and-off discussions about whether to repair, replace or simply remove the bridge. It has been closed to vehicle traffic since 2007 after it failed a safety inspection. The span had gained the name Murray Morgan in 1998, to honor the Tacoma historian who had worked as a bridge tender along the span and even did some of his writing for “Skid Road� there. He died in 2000. At its peak, the bridge handled some 15,000 cars a day. The SR-509 shift dropped that usage to about 4,500 cars a day, a rate that will likely return once it reopens. Allowing vehicles over the bridge again will also save the city some $2 million a year in staffing changes of emergency responders.

PORTABLE

STORAGE of america ...affordable storage is at home!

RENT TO OWN (206) 963-3363 or (800) 206-6983 Fax: (206) 932-8869 JHengtgen@hotmail.com 2233 California Ave. SW Seattle, WA 98116 Visit PSA Today @ www.psathome.com

72nd and Wilkeson Street Tacoma has a tremendous pothole problem, and the city knows it. During the past couple of years, the city has acknowledged this issue by spending millions of dollars in major arterial repairs with the council’s “pothole initiative,� and in 2010, routine maintenance by Tacoma’s Grounds and Maintenance Division completed street repairs on 229,638 square feet of road. In 2011, the city repaired about 150,000 more square feet of road riddled with holiness, and is continuing those efforts well in to 2012. And while that may sound like a lot of ground, new holes pop up – or return – each and every day, which means a pothole-free road might never exist in Tacoma. Tacoma Weekly’s Pothole Pig “Perceval� gained his name after one of King Arthur’s legendary Knights of the Round Table. Perceval is the earliest recorded account of what has gone down in legend as the “Quest for the Holy Grail,� a mythical golden chalice used by Jesus during the Last Supper that is believed to have special powers. Our Perceval Pig, however, is on an endless quest for the “perfect pothole� and runs into many along his adventures through Tacoma. With the help of our readers and our dedicated Pothole Pig, we will continue to showcase some of the city’s biggest and best potholes through our weekly homage to one of T-Town’s most unnerving attributes. Help the Pothole Pig by e-mailing your worst pothole suggestions to SaveOurStreets@tacomaweekly.com. Potholes in need of repair can be reported to the City of Tacoma by calling (253) 591-5495.

http://ow.ly/enL6O

TACOMAWEEKLY 24 YE A R S O F SE R V I C E BE C A U S E CO M M U N I T Y MAT T E R S

Pierce County Community Newspaper Group, LLC

2588 Pacific Highway, Fife, WA 98424 ‹ -(?! 7\ISPZOLY! John Weymer / jweymer@tacomaweekly.com 5L^Z +LZR! news@tacomaweekly.com 4HUHNPUN ,KP[VY! Matt Nagle / matt@tacomaweekly.com :[HMM >YP[LYZ! John Larson / jlarson@tacomaweekly.com Kate Burrows / kburrows@tacomaweekly.com Steve Dunkelberger / stevedunkel@tacomaweekly.com Kathleen Merryman / kathleen@tacomaweekly.com Ernest Jasmin / ejasmin@tacomaweekly.com :WVY[Z ,KP[VY! Jeremy Helling/ jhelling@tacomaweekly.com 7HNPUH[PVU! Tim Meikle / tim@tacomaweekly.com; Kim Pyle, Dave Davison, Tammy Vince Cruz >LI +L]LSVWLYZ! Cedric Leggin, Ed Curran 7OV[VNYHWOLY! Rocky Ross *VU[YPI\[PUN >YP[LYZ! Karen Westeen, Steve Mullen, David B. Hardt, Dave Davison (K]LY[PZPUN! Rose Theile / rose@tacomaweekly.com Nicole Boote / nicole@tacomaweekly.com

Tacoma Weekly is interested in what is happening in our community. Please send your news and story ideas to the above address or e-mail us at news@tacomaweekly.com. Tacoma Weekly welcomes letters to the editor, your opinions and viewpoints. Anonymous letters will not be published. Tacoma Weekly reserves the right to edit letters for length, content and potentially libelous material. Please send them to above address or e-mail us at letters@tacomaweekly.com.


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.