Sports Architecture

Page 1

2001 SAN S IRO

E O

UT

H

CO

LL E

G

AD ST

DA

98 GUAN G

/A M

EN

I

VE ME NT S

A AZ PL

KE

IC E

CO

CT

PORTS WORK 1 S S 99 GG 7 20 09

K

BA LL PA R AN

98 GREAT AME RIC

A ST T.

98

-9

9

S NT

ER

98-9 9 I OW AE VE

ZHO UO LYM PIC VIL LA I T A GE N N 9 9INCI 0 C 1 F O WE AND SPORTS C MB OMP ARENA ITY LEX LE KEN RS O E B Y V O I ST H N U AD 99 EIU G A N A M L RE CH A IL S P R LI IS IL TO PH 8 9 -

H

VA R

CE

SI

TY

NT

V

ER

20 00

AT &T

PA R

K

PR A

IND IAN A OF

ES TI

IMP RO

P

99 U NIVE RSIT Y

CO

20 02

GY

MN AS IU

M

RT M

01 20

RY NT E V

STAD IUM

IUM

97

S BA

L AL EB

M IU AD T S


IA RN L FO A I L N CA IO @ T A GN RN SI E E T D AL , UCLA, ART INSTITUT T RSITY E E N V I E UN M Y N BUR OD O W EC EN RI E P EX VI R

G

G

IN H AC

O

E

CO LL EG UR E-

PR O

CH JEC TS RI ST O ER

A ST T. PORTS WORK 1 S S 99 GG 7 20 09

PECIALIZED ECO TECH AND S E U NO IQ LO UN G

CREDITED-MULTIP D AC LE LEE LEE D

H

IES

EX P

AR

ER IE

CH

NC

E

ITE

CT

TE

F

EN

TH E

N ‘O

SITY, POMONA IC UNIVER

P

BACH ELO RO F

N TECH POLY

O

RO U

N

D

’I

N

CE I EN R PE EX


2001 SAN S IRO

E O

UT

H

CO

LL E

G

AD ST

CO

ES TI

A AZ PL

07 20

/A M KE

CO K

PA R AT &T

VE ME NT S

K

ZHO UO LYM PIC VIL LA I T A GE N N 9 9INCI 0 C 1 F O WE AND SPORTS C MB OMP ARENA ITY LEX LE KEN RS O E B Y V O I ST H N U AD 99 EIU G A N A M L RE A IL S P LI IL PH 8 -9

BA LL PA R

9

-9

98 GREAT AME RIC

AN

98

NT

S

VA R

CE

SI

TY

NT

V

ER

20 00

98-9 9 I OW AE VE

IMP RO

STADIUM REMODEL PROPO SAL ALIAN T I A ALI T I AD I ST

98 GUAN G

EN

I

20 02

DA

RT M

01 20

RY NT E V

STAD IUM

IUM

9 7

S BA

L AL EB

M IU AD T S


South Elevations/Entry Perspective

Birdseye Perspective

DATA

18,000 SEAT ARENA, ONE OF KIND ENTRY/TICKET AREA/UNIQUE BOWL (ALL SUITES STACKED TO ONE SIDE)

NARRATIVE

AS THE EXTERIOR SKIN ARCHITECT, RESPONSIBILITIES INCLUDED COORDINATION WITH ASSOCIATE ARCHITECT, CURTAINWALL SPECIALISTS, ENGINEERING TEAM AND INTERNAL TEAM OF DESIGNERS TO WORK THROUGH THE COMPLEXITIES OF VARIOUS GEOMETRIES AND SYSTEMS. THESE CHALLENGES INCLUDED DETAILING INTERFACE, RESEARCH AND CHOICE OF MATERIALS, AND COORDINATION FOR A GMP PACKAGE OF DOCUMENTS.

97-98

Phillips Arena, Atlanta

(Christopher Staggs-Project Design and Documents (Exterior/Skin/Details) w/HOK Sport)


2001 SAN S IRO

CO

ES TI

TR

Y

D IU

A AZ PL

07 20

/A M KE

CO K

PA R AT &T

VE ME NT S

K

ZHO UO LYM PIC VIL LA I T A GE N N 9 9INCI 0 C 1 F O WE AND SPORTS C MB OMP ARENA ITY LEX LE KEN RS O E B Y V O I ST H N U AD 99 EIU G A N A M L RE A IL S P LI IL PH 8 -9

BA LL PA R

98 GREAT AME RIC

AN

98

-9

9

S

VA R

CE

SI

TY

NT

V

ER

20 00

NT

IMP RO

STADIUM REMODEL PROPO SAL ALIAN T I A ALI T I AD I ST

98 GUAN G

98-9 9 I OW AE VE

STAD IUM

M

EN

I

20 02

DA

20

01

N VE

A ST

97

RT M

O

UT

H

CO

LL E

G

E

S BA

L AL EB

M IU AD T S


DATA NARRATIVE

LANDSCAPE PLAZA SPACE | 50,000 SEATS | 120 SUITES | REMOVABLE PITCH ON TRACKS AS A DYNAMIC FEATURE IN THE CENTRAL ENGLISH FLAT LANDS, THE NEW STADIUM SIGNIFIES A NEW ERA IN AMENITIES ORIENTED FOOTBALL. THE STADIUM IS DIRECTLY LINKED WITH PUBLIC TRAIN TRANSPORTATION, FEATURES COVERED SEATING AND FULL VIP AMENITIES INCLUDING RESTAURANTS

2001

Coventry Stadium, Birmingham, UK

(Christopher Staggs-Project Designer w/ HOK Sport, London)


2001 SAN S IRO

E O

UT

H

CO

LL E

G

AD ST

DA

I

98 GUAN G

/A M

EN

ES TI

IMP RO

VE ME NT S

A AZ PL

KE

IC E

CO

CT

K

ZHO UO LYM PIC VIL LA I T A GE N N 9 9INCI 0 C 1 F O WE AND SPORTS C MB OMP ARENA ITY LEX LE KEN RS O E B Y V O I ST H N U AD 99 EIU G A N A M L RE A IL S P LI IL PH 8 -9

BA LL PA R

9

-9

98 GREAT AME RIC

AN

98

98-9 9 I OW AE VE

NT

S

VA R

CE

SI

TY

NT

V

ER

20 00

AT &T

PA R

K

PR A

IND IAN A OF

99 U NIVE RSIT Y

CO

20 02

GY

MN AS IU

M

RT M

01 20

RY NT E V

STAD IUM

IUM

97

S BA

L AL EB

M IU AD T S


Terraced Football Fields

Fieldhouse

Administration Building

DATA

25 ACRES; ADMINISTRATION, FIELDHOUSE, GYMNASIUM, COMPETITION TENNIS STADIUM, ATHLETE HOUSING, WELLNESS CENTER, BASEBALL STADIUM

NARRATIVE

THE VARSITY VILLAGE WAS CONCEIVED AS A COLLECTIVE LOCATION FOR ALL CAMPUS SPORTS ACTIVITIES INTO ONE CENTRAL PLACE. PLANNED AT THE LINK BETWEEN THE EAST AND WEST CAMPUS THE NEW VILLAGE WOULD CONTINUE THE CAMPUS “BRAID” AND SIGNIFICANTLY ENHANCE THE ATHLETICS PROGRAM IN ITS CONFERENCE. RESPONSIBLE FOR OVERALL MASTER PLANNING, BUILDING DESIGN, CONSTRUCTION COST COORDINATION, PROMOTIONAL MATERIAL.

99

Varsity Village, University of Cincinnati

(Christopher Staggs-Project Planner, Designer, Coordination and Design of promotional film; w/ HOK Sport)


Gymnasium Administration|Hall of Champions Tennis Center Entry Plaza Fieldhouse 2000 Seat Baseball Stadium Burnett Woods

Existing EPA Building

Wellness Center

Concept Entry View

Schematic Watercolor Rendering

Varsity Village, University of Cincinnati

Birdseye Perspective

(Christopher Staggs-Project Planner, Programming, Designer w/ HOK Sport, London)


DA

M

20 02

Y TR EN V CO

98 GUAN G

ZHO UO LYM PIC VI LL AG ATI N N I E C 9 9N I 01 C F O W S P ND O A RTS CO Y EM ENA MPL N AR BL SIT EX EY OKE ER B V O I H ST N 9 AD 9 -U E IU G A N A M E L R A L I PS I L IL PH 8 -9

SI BA TY LL V PA RK

VA R 9

-9

RI C AN

AME 98 GREAT

98-9 9 I OW AE V

EN TS

CE NT

ER

20 00

AT &T

PA RK

CO

KE /A

S IE IT EN

VE ME NT S

A AZ PL

97

UT O

99 U NIVE RSIT

YO F

IND IAN AP RA

CT IC E

GY MN AS IU

M

RT M

01 20

IMP RO

IUM AD ST

98

CO

2001 SAN S IRO S TADI UM

H

E EG L L

LL BA E S BA

UM DI A ST


Bowl View

Main Concourse View

Bowl View

DATA

42,000 Seats; URBAN PLAZA/FAN ZONE; 20 SUITES

NARRATIVE

AN URBAN STADIUM WITH CONNECTIONS TO DOWNTOWN CINCINNATI AND THE RIVERFRONT, THE PARK WAS PLANNED TO PRESERVE IMPORTANT CIVIC VIEWS.

98

Great American Ballpark, Cincinnati

(Christopher Staggs-Project Master Planning w/ HOK Sport)


2001 SAN S IRO

E

ES TI

IMP RO

VE ME NT S

A AZ PL 98 GUAN G

KE

/A M

EN

I

RY NT E V

STAD IUM

IUM

CO

K

ZHO UO LYM PIC VIL LA I T A GE N N 9 9INCI 0 C 1 F O WE AND SPORTS C MB OMP ARENA ITY LEX LE KEN RS O E B Y V O I ST H N U AD 99 EIU G A N A M L RE A IL S P LI IL PH 8 -9

BA LL PA R

9

-9

98 GREAT AME RIC

AN

98

98-9 9 I OW AE VE

NT

S

VA R

CE

SI

TY

NT

V

ER

20 00

AT &T

PA R

K

PR NA IA

IN D OF

99 U NIV ERS I TY

CO

20 02

DA

RT M

01 20

AC

TI CE GY MN AS

IU

M

O

UT

H

CO

LL E

G

AD ST

97

S BA

L AL EB

M IU AD T S


South Entry

Entry Plaza View

South Entry

DATA

COMPETITION SIZE PRACTICE GYMNASIUM; TEAM STORE; LOCKER ROOMS AND SPORTS TRAINING FACILITIES; BELOW GRADE CONNECTION BETWEEN ARENA AND FIELDHOUSE.

NARRATIVE

AS A CONNECTOR THE NEW GYM BRINGS TOGETHER THREE BUILDINGS YET PRESERVES IMPORTANT VIEWS THROUGH CAMPUS THROUGH A LOW PROFILE AND TRANSPARENCY, WHILE BUILDING ON THE EXISTING INDIANA LIMESTONE BEDROCK.

99

University of Indiana Practice Gymnasium

(Christopher Staggs-Project Planner, Programming, Design w/ HOK Sport, Kansas City)


2001 SAN S IRO

E O

UT

H

CO

LL E

G

AD ST

DA

I

98 GUAN G

/A M

EN

ES TI

IMP RO

VE ME NT S

A AZ PL

KE

IC E

CO

CT

K

ZHO UO LYM PIC VIL LA I T A GE N N 9 9INCI 0 C 1 F O WE A AND SPORTS C MB ITY OM AREN PLE LE EN RS K E O Y X V B I ST O N H U AD 9 E9 IU G A N A M L RE A IL S P LI IL PH 8 -9

BA LL PA R

9

-9

98 GREAT AME RIC

AN

98

98-9 9 I OW AE VE

NT

S

VA R

CE

SI

TY

NT

V

ER

20 00

AT &T

PA R

K

PR A

IND IAN A OF

99 U NIVE RSIT Y

CO

20 02

GY

MN AS IU

M

RT M

01 20

RY NT E V

STAD IUM

IUM

97

S BA

L AL EB

M IU AD T S


Arena Section @ The Great Hall of Transportation

Concept Sketch

DATA

18,000 SEAT ARENA; 250 ROOM HOTEL; 2500 CAR PARK; HALL OF TRANSPORTATION; RESIDENTIAL, RESTAURANT AND RETAIL.

NARRATIVE

POSITIONED AT A TRANSPORTATION CROSSROADS THE PROPOSED NEW HOME FOR THE NEW JERSEY NETS AND DEVILS SITS ADJACENT TO THE HUDSON RIVER. THE ARENA AND ENTIRE COMPLEX TRANSITION FROM THE LOWER SCALE URBAN FABRIC OF HOBOKEN TO THE MANHATTAN SKYLINE WITH MATERIALS AND TEXTURE THAT SPEAK TO THE HISTORIC CONTEXT.

99

Hoboken Arena and Sports Complex, New Jersey

(Christopher Staggs-Project Planner, Programming, Design w/ HOK Sport, Kansas City)


2001 SAN S IRO

E

S BA

L AL EB

M IU AD T S

O

UT

H

CO

LL E

G

AD ST

DA

I

VE ME NT S

A AZ PL 98 GUANG ZHO U

CO K

PA R AT &T

K

BA LL PA R

9

-9

98 GREAT AME RIC

AN

98

98-9 9 I OW AE VE

NT

S

VA R

CE

SI

TY

NT

V

ER

20 00

OLY

MP IC VI LL AG NATI N I C 9 9 IN -01 E C F O WE Y ENA AND SPORTS COM R T M A I BL S PLE KEN X EY ER BO IV ST HO N 9 U AD 9 EIU G A N A M L RE A IL S P LI IL PH 8 -9 97

/A M

EN

ES TI

IMP RO

IUM

KE

IC E CT PR A

IND IAN A OF

99 U NIVE RSIT Y

CO

20 02

GY

MN AS IU

M

RT M

01 20

RY NT E V

STAD IUM


3d Arena View

Overall Planning

Concept Digital Model

DATA

12,000 SEAT ARENA; COMPETITION POOL AND DIVING; OLYMPIC PLAZA; ATHLETE HOUSING AND TRAINING CENTER; PRACTICE GYMNASIUM

NARRATIVE

CONCEPTUAL PLANNING AND DESIGN ORIGINATED WITH THE CHINESE CHARACTER; THE ‘RADICAL’ AND THE ‘STROKE’ FORM THE GEOMETRIC BASIS OF DESIGN-THE LANGUAGE OF THE DESIGN. SECOND PLACE IN INVITED COMPETITION

98

Guangzhou Olympic Village, China

(Christopher Staggs-Project Planner, Programming, Design w/ HOK Sport)


2001 SAN S IRO

E O

UT

H

CO

LL E

G

AD ST

DA

20 02

IMP RO

VE ME NT S

A AZ PL

S IE T I

98 GUAN G

K E/

A

IC E

CO

CT

RK

PR A

K

ZHO UO LYM PIC VIL LA I T A GE N N 9 9INCI 0 C 1 F O WE AND SPORTS C MB OMP ARENA ITY LEX LE KEN RS O E B Y V O I ST H N U AD 99 EIU G A N A M L RE A IL S P LI IL PH 8 -9

BA LL PA R

9

-9

98 GREAT AME RIC

AN

98

98-9 9 I OW AE VE

NT

S

VA R

CE

SI

TY

NT

V

ER

20

00

AT

&T

PA

IND IAN A OF

99 U NIVE RSIT Y

CO

M

EN

GY

MN AS IU

M

RT M

01 20

RY NT E V

STAD IUM

IUM

97

S BA

L AL EB

M IU AD T S


Realized Project

Schematic Design Study Model

Concept Sketch

DATA

GIANT COKE BOTTLE AND GLOVE, W/KIOSKS

NARRATIVE

THE COCA COLA PLAZA COMPREHENSIVE ENTERTAINMENT ZONE WITH KIOSKS, HISTORIC PLAYER SCRIMS, A GIANT COKE BOTTLE FABRICATED FROM ALASKAN CEDAR GLULAM AND POINT SUPPORTED GLASS SYSTEM, AND TECHNOLOGY RICH AMENITIES.

2000

AT&T Park | Coca-Cola Amenities Plaza, San Francisco

(Christopher Staggs-Project Planner, Programming, Design w/ HOK Sport, Kansas City)


2001 SAN S IRO

E O

UT

H

CO

LL E

G

AD ST

DA

I

98 GUAN G

/A M

EN

ES TI

IMP RO

VE ME NT S

A AZ PL

KE

IC E

CO

CT

K

ZHO UO LYM PIC VIL LA I T A GE N N 99-0 INCI 1 C F W O AND SPORTS C EM OMP ARENA ITY BL LEX KEN RS EY O E B V O I H ST N 9 U AD 9 EG IU A N A L RE M A IL S IP L IL PH 8 -9

BA LL PA R

9

-9

98 GREAT AME RIC

AN

98

98-9 9 I OW AE VE

NT

S

VA R

CE

SI

TY

NT

V

ER

20 00

AT &T

PA R

K

PR A

IND IAN A OF

99 U NIVE RSIT Y

CO

20 02

GY

MN AS IU

M

RT M

01 20

RY NT E V

STAD IUM

IUM

97

S BA

L AL EB

M IU AD T S


Bowl/Video Screen

Exterior view

Seating Bowl/Pitch

Birdseye View

DATA

LARGEST COVERED STADIUM IN THE WORLD WITH THE WEMBLEY ARCH AT 300’ TALL AND A MOVABLE ROOF COVERING ALL SEATS CONVERTIBLE TO ATHLETICS STADIUM, THE PITCH IS CONFIGURED FOR EUROPEAN FOOTBALL; 50 SUITES.

NARRATIVE

THE WEMBLEY BOWL WAS CONFIGURED FOR OPTIMAL SITELINES AND DISTANCE TO THE GAME OF FOOTBALL; THE INTERIOR “BOWL” SPACE IS FULLY ENCLOSED WITH A COVERED ROOF THAT IS INTEGRATED WITH THE BOWL AND ITS SUPPORTING STRUCTURE. MR. STAGGS SERVED AS PROJECT BOWL ARCHITECT LEADING A TEAM OF (4) FROM THE US IN LONDON. THE ENTIRE 50+ A/E TEAM DESIGNED THE PROJECT FROM AN ON SITE OFFICE IN WEMBLEY. EXTENSIVE INTERACTION WITH THE BUILDER AND SUBTRADES IN SD/DD TO MORE ACCURATELY COORDINATE DRAWINGS WITH ACTUAL CONSTRUCTION METHODS.

99-01

New English National Stadium, Wembley, London, UK

(Christopher Staggs-Project Bowl Planner, Programming, Design w/ World Stadium Team/HOK Sport, London)


Bowl/Structure Interface Study

Bowl/Structure Interface Study

Bowl/Structure Construction

Athletics Events Layout

Bowl/Roof Structure Interface Study

Terrace Siteline Analysis

DATA

BOWL-90,000 SEATS; STEEL SUPERSTRUCTURE SUPPORTED BY CIRCULAR TUBE SECTION WING STRUCTURE; PRE-CAST CONCRETE TERRACING; PAINTED STEEL GUARDRAIL/HANDRAILS AND METALWORK; 5MX20M LED VIDEO SCREENS AT EITHER END OF BOWL; ADJUSTABLE CROWD BARRIERS AT PITCH; SITELINES AND BOWL CONFIGURED FOR FOOTBALL; STADIUM CAN BE CONVERTED TO ATHLETICS BY RAISING PITCH (REDUCTION IN SEATING TO 70,000); ALL SEATS COVERED BY MOVABLE ROOF

NARRATIVE

EXTENSIVE SITLINE AND ATHLETICS STUDIES WERE PERFORMED (EVIDENCE OF ATHLETICS CONVERSION)

New English National Stadium, Wembley, London, UK

Bowl/Structure Geometry/Plan Study

(Christopher Staggs-Project Bowl Planner, Programming, Design w/ World Stadium Team/HOK Sport, London)

99-01


CH RI ST O

P

H

ER

A ST T.

PORTS WORK 1 S S 99 GG 7 20 09


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.