ideasCollaborative Large Building Qualifications

Page 1

資格的聲明

large scale poetry Statement of Qualifications

ideas Collaborative LEACH ITANI STAGGS


c

ideas Collaborative


Table of Contents Vision Statement Experience Project Team Project Approach

c

ideas Collaborative


愿景声明 Vision Statement January 2011 | Large Building Projects

We enthusiastically present our qualifications demonstrating our innovative experience with large building design and execution. The design intent of this document is to illustrate our capabilities as a multi faceted design organization, demonstrate select project experience in large and tall buildings, and express our enthusiasm and commitment to integrated design, making exceptional spaces, and working collaboratively. With a significant history and foundation of design and building internationally embedded in our architecture team, we are intimately familiar with the opportunities and constraints in the development of large, complex building projects and the associated logistics. Large building planning and design require attention to very specific issues and compel the project team towards certain strategies and design decision considerations in response to the urban fabric, social and demographic context, form and language, structure, and environmental impact. These include efficiency of space planning, rational structural strategies and solutions, attention to the urban impact, coordination with local agencies, interest groups, and constituents, and most importantly, attention to human comfort and sustainable strategies. In short, ideasCollaborative understands the commercial, social, and civic impact of this project type and has demonstrated experience in successful completion of large projects. We possess both the design sensibility and technical nimbleness suited to this process. We will engage you and your team with great optimism and high expectations with a thorough, invigorating, and personalized design and construction process. We look forward to building relationships with groups and people who have a thirst and vision for exceptional places - a passion for exceptional architecture. This is our vision-to create places which touch the human spirit.

我们热情地介绍我们的资格证明了我们与大型建筑的设计和 执行创新的经验。这份文件的设计意图是想说明作为一个多 方位的设计机构的能力,展示在大,高楼大厦选择项目的经 验,并表达我们的热情和承诺,综合设计,制造特殊的空 间,并积极开展合作。 具有重大历史和国际上的设计和嵌入在我们的建筑团队建设 的基础,我们正密切与机遇以及在大型,复杂建设项目和与 之相关的物流发展的制约因素熟悉。 大型建筑的规划和设计需要注意非常具体的问题,如城市, 迫使织物,社会和人口方面,形式和语言,结构和环境的影 响对某些战略决策的考虑和设计的项目团队。这些措施包括 效率的空间规划,合理的结构战略和解决方案,重视城市的 影响与当地机构,利益集团,协调和成分,最重要的是,重 视人的舒适度和可持续发展战略。总之, ideasCollaborative理解这一项目类型的商业,社会和公民的 影响,并显示了在大项目的成功完成的经验。 我们在设计具有的感性和技术敏捷适合这一进程。我们将聘 请你和你的非常乐观和彻底,更加振奋人心,和个性化的设 计和施工过程中的团队抱有很高的期望。 我们期待着与群体和人民谁有特殊的地方,一个特殊建筑的 热情和理想的渴望建立关系。这是我们的视觉触摸的地方, 创造了人类的精神。

With Great Optimism We Greet You, Christopher T. Staggs AIA Assoc., LEED AP Partner | Director of Design

H. Randall Leach AIA Partner | Managing Principal

Nadim Itani Partner | Design and Culture

ideasCollaborative | 1385 N. Michigan Ave | Pasadena, California 91104 | T 951.236.9628 | F 626.403.9569

1


ideasCollaborative

想法協作

design services

創作理念

總體規劃

編程

建築設計

施工文件

建設的協調

顧問協調

idea creation

master planning

programming

building design

construction documents

construction coordination

consultant coordination

c

ideas Collaborative

BACKGROUND IMAGE: SOMERSET STUDENT RESIDENCE TOWER, BOSTON (W/CANNON DESIGN) 2001-2003


dublin gateway

专业经验

experience

我们拥有建筑,规划,并 与私营部门和公共部门客 户六十多年的室内设计经 验,在国际上。下面的部 分详细介绍我们的有关经 验,在规划,设计,配套 设施和大型项目建设。

We have over sixty years of architecture, planning, and interior design experience with private and public sector clients, internationally. The following section details our relevant experience in the planning, design, and construction of large project facilties.

suffolk

dublin gateway

c

ideas Collaborative

wembley


chancellor ’s office

phillips arena

riverfront ymca

c

ideas Collaborative

hudson view

guangzhou sports


c

ideas Collaborative


Relevant Experience Project

Location

Stories

Long Beach, California

6

Chris Staggs

LPA

Dublin, Ireland

20

Chris Staggs

U2 Studio

Novotel Hotel Hollywood

Hollywood, California

10

Chris Staggs

LPA

Hoboken Arena

Hoboken, New Jersey

8

Chris Staggs

HOK Sport

Houston, Texas

26

Chris Staggs

KMJR

Wembley Stadium

London, England

8

Chris Staggs

HOK/Foster

Coventry Stadium

Coventry, England

6

Chris Staggs

KMJR

Boston, Massachusetts

20

Chris Staggs

Cannon Design

Atlanta, Georgia

6

Chris Staggs

HOK Sport

Hewlett-Packard Tower

Houston, Texas

23

Chris Staggs

KMJR

Hudson View East Residential Tower

New York city

12

Randall Leach, PM/PA

California State University Chancellor’s Headquarters Dublin Gateway

BMC Software Tower

Suffolk University Student Residence Phillips Arena

c

ideas Collaborative

Design

Firm

Mitchell Giurgola


在各主要门户,波特兰,对这种混合 使用的城市包括24个塔现场办公空间 层次,零售。轻轻地弯曲的东立面反 映了Wilamette河尽量减少对城市天 际线的视觉冲击。 400个停车位隐藏 在门面。

at the principal gateway to theods tower city of Portland, the site for this mixed-use towerincludes 24 levels of office space, retail. The gently curved east facade reflects the Wilamette river minimizing the visual impact on the city skyline. 400 parking spaces are hidden within the facade. relevance | relationship this urbantower works withing the to the local city fabric at ahuman scale - the first four levels - and speaks to the human relationship. at the same time the tower speaks to the larger city and regional context with its height and massing.

H. Randall Leach, iC Partner (Project Manager w/Zimmer, Gunsul, Frasca

c

ideas Collaborative


c

ideas Collaborative


反映都柏林,她的多价方面,她的多 样性,她的反思;折射和历史....波 光,闪闪发光,精神,半透明,唱 歌,并在城市边缘发光

reflecting Dublin, herdublin gateway polyvalent facets; her multiplicity; her reflections;refractions and history....shimmering, glimmering, spirit; translucent, singing, and glowing at the edge of the city As light harvesters, the beacons symbolize our probing, our longing. Her body and crown shim mer-uncovering and revealing the city’s heart and life. Her base-knowingly grounded while hovering at the edge of Dublin rhythm, The Liffey, offer back to The Docklands spatial niches and throughways; gardens and places for her young and wise...places for the life of a city to flourish and inspire. relevance | relationship Smart building ecology; long life; loose fit; health; happiness; community connection; integrated building systems; lift the spirit.

C h r i s t o p h e r T. S t a g g s , i C P a r t n e r ( P r o j e c t D e s i g n e r )

c

ideas Collaborative


R ENEW RE CL A I M R EGENER AT E

c

RE V EA L R ECR EAT E

ideas Collaborative

RE L AT E

R EVA L UAT E


该网站在历史上被占领的一个三百六十英尺 高的教堂尖顶。我们的挑战是建立一种在笔 架山,波士顿高密度的学生的地方。波士顿 的工作直接与公民设计委员会,波士顿重建 局和社区民众的笔架山。该设计方案的城市 区划的挑战,是一个天灯收割机配置,并能 说一口直接的物质和城市结构比例范围内。 该建筑的设计usign LEED的指导方针,并 执行三成比波士顿更典型的大型建筑物。

suffolk university student residence The site was historically occupied by a three hundred and sixty foot tall church spire. Our challenge was to create a place for students in the high density of Beacon Hill, Boston. Working directly with the Boston Civic Design Commission, Boston Redevelopment Agency, and The Beacon Hill Community citizens. The design solution challenged the urban zoning, is configured as a day light harvester, and speaks directly to the material and proportional context of the urban fabric. The building was designed usign LEED guidelines and performs thirty percent better than typical large buildings in Boston.

relevance | relationship Daylighting strategies as well as sustainability are achievable in large buildings and result in more comfortable living environments.

Christopher T. Staggs, iC Partner (Project Designer w/Cannon Design)

c

ideas Collaborative


33 31 29 27 25 23 21 19 17 15 13 11 9 7 5 3 1

c

ideas Collaborative


是对足球比赛和伦敦金融城,这种运 动的大教堂和附属设施的图标集成了 一个可供租用的办公场地90000座位 碗,五star/200床酒店,和行政俱乐 部设施。高100米的钢拱支持可操作 的屋顶,在每一个方向英里可见。

english national stadium An icon to the game of futbol and the city of London, this cathedral of sport and associated amenities integrates a 90,000 seating bowl with leasable office space, a five star/200 bed hotel, and executive club facilities. The 100 meter tall steel arch supports the operable roof, visible for miles in every direction. relevance | relationship A complex interface of many disciplines; large structures that house, move, and accumulate large quantities of people require steady attention, clear design direction and leadership, and rigorous management.

Christopher T. Staggs, iC Partner (Project “Bowl” Architect w/HOK Sport)

c

ideas Collaborative


c

ideas Collaborative


巩固了世界上最大的大学系统的总部 是这个项目的主要目标。该设施是家 庭对中南大学的受托人和参议院 208个 座位的学术会议中心,以及为 所有经营部门的行政办公室,校长办 公室和支持位

csu chancellor ’s headquarters Consolidating headquarters of the largest university system of the world was the primary goal of this project. The facility is home to a 208 seat conference center for trustees and academic senate of CSU, as well as the administrative offices for all operating departments, The Chancellors office and support spaces relevance | relationship We understand the importance of the “front door” and the impression on the public eye.

Christopher T. Staggs, iC Partner (Project Master Planner/Designer w/LPA)

c

ideas Collaborative


c

ideas Collaborative


签名,铝包“ 亚特兰大“ 入口提供公共 雕塑以及配套项目的屋顶结构。在幕 墙玻璃系统,波光金属板,石包, 15,000座 位的表演场地,已成为在亚 特兰大市的标志性的形式。

phillips arena The signature, aluminum clad “ATLANTA” entrance provides a public sculpture as well as supporting the entry roof structure. Clad in curtainwall glazing system, shimmering metal panels, and stone, the 15,000 seat arena has become an iconic form in the city of Atlanta. relevance | relationship Our perceptions of space, form, and light are dramatically different considering day and night. With this in mind, we consider the skin of a building and its impact on people.

Christopher T. Staggs, iC Partner (Project Skin Designer w/HOK Sport)

c

ideas Collaborative


c

ideas Collaborative


主要設計司機這個項目圍繞城市孔隙 率,保護重要的河景,環境可行性和 社區聯繫。伴隨著強烈的視覺連接到 青年會精神的“ 頭腦,身體和精神, 通過三角象徵,代表的幾何形狀,這 些想法匯集在一個綜合的結構體系, 高性能能源概況,和強烈的視覺清晰 度的材料。

riverfront YMCA The primary design drivers of this project revolve around urban porosity, protection of important river views, environmental viability, and community connections. Along with a strong visual connection to the YMCA ethos of “mind, body, and spirit, symbolized and represented through triangular geometry, these ideas are brought together within an integrated structural system, high performance energy profile, and strong visual clarity of materials. relevance | relationship relating to the river and the natural context of the city-sun, wind, and landscape patterns, the proposed multi-use facility will be an iconic riverfront for living, working, and health; development of the mind, body, and soul

C h r i s t o p h e r T. S t a g g s , i C P a r t n e r ( D e s i g n P r i n c i p a l )

c

ideas Collaborative


PERSPECTIVE VIEW OF NORTHWEST CORNER (VIEW TOWARDS THE RIVERFRONT)

NORTH ELEVATION

c

ideas Collaborative


这110单 位,18级 项目是城市发展的 炮台公园位于曼哈顿的一部分。哈得 逊河的设计优化的意见,提高街道边 缘的细节设计,提供了各种各样的住 宅单位,并最大程度的自然光线。雕 刻的角落,提供了慷慨的挫折和一个 宽敞的感觉,每个居住单元

hudson view condos This 110 unit , 18 level project is part of the Battery Park City Development in Manhattan. The design optimizes Hudson River views, enhances street edge detailing, provides a variety of residential units and maximizes natural light. The corners are carved away to provide generous setbacks and a feeling of spaciousness to each living unit

relevance | relationship the street wall facade is a series of towers articulated by ribs at the lower levels and recesses at the upper levels. The detailing enriches the facade and speaking the human scale at ground level and the city scale as the structure reaches into the sky.

H. Randall Leach, iC Partner (Project Architect w/Mitchell Giurgola)

c

ideas Collaborative


ENTRY LOBBY

ELEVATION PATTERN AND DETAIL

c

ideas Collaborative

STREET VIEW FROM NORTH


基本的規劃和整個網站的設計理念本 項目產生的視覺特徵的漢語。這兩個 中央“ 激進“ 和周邊中風從而彌補了書 面語言被翻譯成視覺,建築語言來生 成的計劃和架構。

guangzhou sports The basic planning of the site and the entire design ethos of this project is generated from the visual character of the Chinese language. Both a central “radical” and perimeter strokes which make up the written language were translated into a visual, architectural language to generate the plan and architecture.

Relating to the relevance | relationship language of a culture perhaps one of the single most significant cultural connections for a place.

Christopher T. Staggs, iC Partner (Project Master Planner/Designer w/ HOK)

c

ideas Collaborative


PERSPECTIVE VIEW OF NORTHWEST CORNER (VIEW TOWARDS THE RIVERFRONT)

ARENA VIEW

c

ideas Collaborative


c

ideas Collaborative


Qualifcations As a founding principal of ideasCollaborative Christopher is the director of design and a primary contributor to the collaborative ethos of the firm. With over 23 years of professional experience he has participated as a design leader on several international projects, including several major, large, complex projects. Christopher teaches and lectures at local design schools and is active

Christopher T. Staggs PARTNER|DIRECTOR OF DESIGN

Select Experience •6-Story Headquarters, CSU Chancellor’s Office, Long Beach, CA •20-Story Dublin Gateway Center, Dublin, Ireland

Education Bachelor of Architecture California State Polytechnic University, Pomona

Affiliations LEED Accredited Professional U.S. Green Building Counsil California Architects Board American Institute of Architects

Academic Appointments|Activities California State Polytechnic University University of Mighigan The Art Institute Woodbury University University of California, Riverside

•10-Story Novotel Hollywood Hotel, Hollywood, CA •8-Story Hoboken Arena, Hoboken, NJ •26-Story BCM Software Tower, Houston, TX •8-Story Wembley Stadium, London, England •6-Story Coventry Stadium, Coventry, England •20-Story Suffolk University Student Residence, Boston, MA •4-Story Phillips Arena, Atlanta, GA •23-Story Hewlett-Packard Tower, Houston, TX •Desert Vineyard Sanctuary and Children’s School, Master Planning and Design, Lancaster, CA •Saddleback Church Primary School and Library, Irvine, CA •Tarbut V Torah School, Newport Beach, CA •Southern California School of Optometry, Fullerton, CA •Anaheim Community Center, Anaheim, CA •Irvine Spectrum Company, Master Planning and Design, Irvine, CA •Nassau County Venue Complex, Convention center, Master Planning &Design, Long Island NY •Northridge Sports “Oasis”, Master Planning and Design, Los Angeles, CA •Museum for Cinematography, Los Angeles, CA

c

ideas Collaborative


Qualifcations

H. Randall Leach

Wiith over 30 years in the industry, Randy is a Principal at ideas Collaborative. Prior to founding ideasCollaborative with Mr. Staggs, he worked for the Portland office of Zimmer Gunsul Frasc Architects while eventually becoming the Managing Partner of the Los Angeles office. Before joining ZGF, he was a Partner with Mitchell/Giurgola Architects in New York, where he served as a VISTA volunteer at the Architect’s Renewal Committee in Harlem. Mr. Leach has managed several publically funded projects for The University of California campus’, private institutions, and corporate clients.

PARTNER|MANAGING PRINCIPAL

The Donald Bren School of Environmental Sciences and Management, University of California,

Education Bachelor of Architecture, University of Virginia 1969

Santa Barbara, CA* Marine Science Institute, University of California, Santa Barbara, CA* Wardman Library Expansion, Whittier College, Whittier, CA*The Greek Theater, Los Angeles, CA* Entomology Building, University of California, Riverside, CA*Physical Sciences Research Building

Affiliations American Institute of Architects NCARB Hathaway Sycamore Advisory Board Member Former Member of South Pasadena Design Review Board

Ohio State University, Columbus, OH* West Dining Center and Residence Hall, Oregon State University, Corvallis, OR* Putnam University Center, Willamette University, Salem, OR* Pacific Hall, Revelle College, University of California, San Diego, CA* Agouron Pharmaceuticals, Inc. Corporate Campus, La Jolla, CA* ODS Tower, Office, Retail, Parking Complex, Portland, OR* KPTV - Channel 12, Portland, OR* Chase Manhattan Bank, Office Renovation, New York, NY* Hudson View East Residence, New York, NY* Ten Stanford Forum, Office Building/Parking Garage, Stamford, CT* Wainwright State Office Complex, St. Louis, MO*Niel Residence, South Pasadena, CA Thiel Residence, South Pasadena, CA Montrose Avenue Residence, South Pasadena, CA Moffy Residence, Pasadena, CA Callahan Vomela Residence Addition, Pasadena, CA Cook Residence, Los Angeles, CA

c

ideas Collaborative


Qualifcations

Nadim R. Itani

Nadim is a Principal at ideas Collaborative and has over 17 years of experience in the design and management of architectural projects. He has a particular focus on the relationship between culture and architecture and brings a strong emphasis on collaboration to our design team. He has been a manager and designer with ideasCollaborative since 2006. Nadim is on the faculty of Cal Poly Pomona and teaches architectural design studio.

PARTNER|DESIGN AND CULTURE

Education

Select Experience

Master of Architecture California State Polytechnic University, Pomona

RSHM Senior Housing, Montebello, CA*

Bachelor of Architecture California State Polytechnic University, Pomona

Scwartzman Residence, Encino, CA*

Mission Viejo Library, Mission Viejo, CA* Novak Residence, Bel Air, CA*

Academic Appointments|Activities California State Polytechnic University Los Angeles conservancy; Modern Committee California Faculty Association

Novak Residence, Silver Lake, CA* Niel Residence, South Pasadena, CA Thiel Residence, South Pasadena, CA Montrose Avenue Residence, South Pasadena, CA Moffy Residence, Pasadena, CA Leach Residence (Interiors), Pasadena, CA Callahan Vomela Residence Addition, Pasadena, CA Cook Residence, Los Angeles, CA Amtrak Southern California Stations ADA Conformance Surveys/Reports, Multiple locations, CA* Bezalel Academy of the Arts, International Competition, Jerusalem Israel. House of Arts and Culture, International Competition, Beirut Lebanon.

c

ideas Collaborative


HUDSON VIEW CONDOMINIUMS, MANHATTAN, NYC

SOMERSET STUDENT HOUSING TOWER, BOSTON

c

ideas Collaborative

NEW ENGLISH NATIONAL STADIUM, LONDON

CSU CHANCELLORS HEADQUARTERS, LONG BEACH, CALIFORNIA


Project Approach Our general scope of professional service shall be to refine and implement an efficient and functional design that is constructible, while maintaining your budget, schedule, and satisfaction. iC will work to develop the

on electronic file. :: “Record Drawing� floor plans, submitted on electronic media. :: iC to prepare furniture and equipment plans for various interior spaces. :: iC to recommend various cost effective,

Design Throughout the design phases, iC applies concerted effort on satisfying the requirements of regulatory agencies. iC staff has in depth knowledge of the International Building Code, Department of Health Services, the

approved scope of work in terms of economic

yet aesthetically appealing interior design

Americans with Disabilities Act, and the

and functional requirements.

materials, including wall covering, floor

submittal and review requirements of local,

covering, and modular furniture.

state, and federal authorities.

In order to satisfy the project goals, our

:: iC to incorporate its understanding

approach begins with the awareness that

of the principles of ergonomic and

Construction documents

the project’s schedule and funding are fixed

sustainable (green) design as appropriate.

The progress of Construction Documents

entities that can only be met or reduced.

Services provided by iC are implemented with a team approach, consisting of owner representatives, building user groups, iC,

:: iC to provide cost effective, aesthetically

is assigned milestones within the Project

appealing design of public areas.

Schedule where the entire set of drawings is

:: iC to perform workspace population

assembled for review by all team members.

density studies and growth forecast. :: iC to coordinate efforts with the

Coordination of the various consulting engineers is the primary focus of each

and consulting engineers. Beginning with the

engineering and construction of the

submittal. The complete set of construction

existing facilities assessment and continuing

projects.

documents also receives the review of other senior architects at iC to ensure that quality

through post-occupancy, the expertise of each team member will be incorporated. Team

iC provides project delivery in phases,

is maintained. The owner and designated

cohesion will be reinforced through regularly

generally standard to the industry, and

site staff will also receive a complete set of

scheduled progress meetings.

recognized by the American Institute of

documents for their review and approval prior

Architects (AIA). The project objectives,

to bidding.

Typical project deliverables may include, but

detailed schedule, and deliverables are

not be limited to:

established at the beginning with the owner,

iC considers budget parameters to be of

:: iC to field verify existing facilities and

and rigorously followed by iC.

paramount importance. iC utilizes the cumulative experience of an in-house cost-

site conditions and prepare CAD drawings

c

ideas Collaborative


estimating department, consulting engineers,

is reviewed and concerns are discussed. iC

contract change orders

and other construction professionals to

also maintains a detailed logging system,

track project costs and current trends in

enabling the movement of information

Post-construction services

construction. iC reviews construction

efficiently throughout construction. iC’s

:: Job walk and creation of final punch list

costs during the initial design phases as well

thorough documentation of construction

:: Review of corrections required by the punch

as during preparation of the Construction

issues serves as a catalyst to the construction

Documents.

process, and becomes a valuable resource in

:: Prepare close-out documents

the event of a construction claim.

:: Post-occupancy survey and analysis

iC is committed to keeping the number

Bidding

Quality Assurance

of revisions (addenda) during the bid period

:: Issue clarifications to bidders and

Effective construction document quality

list

Construction

to a minimum. Issuance of addenda, should

incorporate information for construction

control is an ongoing process, starting in the

they be required, are included on the

documents via addenda.

programming phase and ending with the

project schedule to insure adequate time for evaluation by potential bidders.

:: Assist the owner in preparation of bid advertisements

completion of the construction documents. The end result of these reviews and strategies

:: Coordinate pre-bid meeting

are higher quality and more thoroughly

The iC approach to construction is one of

:: Respond to any requests for clarifications

coordinated documents, which translates

timely, informed response and the resolution

:: Assist the owner with review of bids

into better bids and fewer change orders. The

of disputes prior to escalation. Should

received for responsiveness

following are the systems iC employs:

program design changes arise, iC provides a diligent review of all costs and alternatives

Construction administration services

Project planning group

prior to recommending applications for

:: Review and respond to all requests for

This group is the core of our quality control

payment.

information

effort. It meets in-house regularly to discuss

:: Review contractor’s shop drawing Regularly scheduled construction meetings have been the corner stone of iC Construction Administration success. During these meetings, the progress of construction

submittals

the recent and upcoming management, design, and coordination issues for the

:: Attend project construction progress meetings

project. These issues will be coordinated and communicated back and forth by the group

:: Review and make recommendations for

c

ideas Collaborative

leader with the owner and with the consultant


team. This group provides ongoing review

included in the documents for each phase

with iC plan checking the work of all

of project issues by a group of qualified

and for each drawing type. This ensures

disciplines. These are objective reviews of

individuals and ensures that these issues

minimal review comments and corrections.

the documents evaluating code compliance,

are incorporated into the development

constructability, coordination, and

of the design and documents prior to

Milestone coordination meetings

formal review by any applicable regulatory

The purpose of these regular meetings will

agencies.

be for progress coordination of building and system issues. These meetings are the

Code analysis and code

forums for the majority of the technical

conformance reviews

coordination.

A preliminary code analysis will be prepared at the onset of design by all

Progress reviews

architectural and engineering disciplines.

These reviews, conducted by iC and

This analysis will be submitted to the owner

the engineering consultants occur

for review. The A/E team will review the

several times during each phase, preceding

documents at the completion of each phase

milestone coordination meetings. The

of work to ensure compliance with earlier

point of these reviews is to examine

Code Analysis findings. Any necessary

the practicality, functionality, and cost

Code Analysis revisions will be prepared

implications of the design and building

by the A/E team and forwarded to the

details, as well as to ensure that all review

appropriate agencies.

comments from the owner are being appropriately addressed.

Design and construction document checklists

Plan check reviews

iC customizes our master checklist for

Following each phase submittal, each

this project with respect to each discipline.

member of the A/E team reviews the

This provides our staff and all consultants

drawings and specifications relative to

with an extensive list of specific items to be

the coordination of their scope of work,

c

ideas Collaborative

completeness.


Client References

Victor Elmaleh Chairman - World Wide Holdings Corporation Worldwide Property Development

Mr. Boone Helman Associate Vice Chancellor for Facilities Design and Construction / Campus Architect University of California, San Diego

Projects: ? Hudson View Condominiums, Manhattan, New York City

Projects: Pacific Hall (Chemical and Biochemical Research LaboratoryRevelle College, UCSD

Mr. Wayne Ratkovitch President of The Ratkovitch Company Southern California Property Development

Mr. Bil Wolters Senior Pastor, Calvary Chapel Murrieta

Projects: ? Los Angeles Multi-Family Residential Development

Projects: Calvary Chapel Spiritual Center and School

Mrs. Nancy Johnson City Librarian of The City of Azusa, California Southern California Property Development Projects: ? Woodcrest Library, Riverside, California

c

ideas Collaborative


c

ideas Collaborative

WEMBLEY STADIUM, LONDON (W/HOK SPORT AND FOSTER AND PARTNERS) 1999-2001


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.