The Illustrated EMOC

Page 1

EMOC Community Project Presentation and Charrette Office of Planning and Development Department of General Services Montgomery County, Maryland Baker and Associates

June 29, 2009 June 29, 2009


Project Team  Montgomery County, Office of Planning and Development  David Dise- Director  Hamid Omidvar – Chief  Rassa Davoodpour – Manager  Baker & Design Team  Peter Schmidt, AIA, LEED AP – Project Manager  Greg Shipley, AIA, LEEP AP – Project Architect  Shawn Benjaminson, PE, LEEP AP – Civil Engineer  Michele Monde, PE, Environmental  John F. Parker, RLA Landscape Architect

June 29, 2009

2


Design Team Organization

June 29, 2009

3

MONTGOMERY COUNTY, MARYLAND PROJECT MANAGEMENT QUALITY ASSURANCE/TECHNICAL REVIEW QC Executive – Nelson Cragg, AIA (Baker)

Principal-in-Charge Carl F. Kemp, AIA (Baker) Project Manager Peter Schmidt, AIA (Baker) Project Director Paul Cook AIA (Baker)

ENGINEERING Structural Mechanical/Plumbing Cindy Ponafala, PE (Adtek) Mel Straus, PE (S3E) Mahendra Shah, PE (Adtek) Jeff Engel, PE, John Frankhouser, PE (Adtek) LEED AP (S3E) Civil Elec/Telecom/IT Shawn Benjaminson, PE, Bhupinder Sohi, PE (EPCM) LEED AP (Adtek) Dave Vancott, PE (EPCM) Ken Ellis, PE (Adtek) Geotechnical Sunny Kim, PE President (Kim Eng.)

PLANNING / ARCHITECTURE Project Architect Greg Shipley, AIA, LEED AP (Baker) Architecture Greg Shipley, AIA, LEED AP (Baker) Architecture Brent Camp, AIA (Baker) Interior Design Carin Kinn, NCIDQ (Baker) Landscape Architecture Oliver Boehm, RLA, LEED AP (Baker) John F. Parker, RLA (Baker) Sustainable Design/LEED Leslie Crowder, LEED AP (Baker)

SPECIALTY DISCIPLINES Survey Planning & Equipment James Afful, President Don Leidy, Principal (MDG) (AULtec) Steve Radomski, AIA, Mark Sagaral, Survey Coord. LEED AP (MDG) (AULtec) John Wellington (MDG) Barry Newton (MDG) Cost Fire/Life Safety/Code/Commissioning Charles Kumi, President (Kumi) Lester Stephens, Chief Cost Jawahar Chaudary, PE (NIKA) Est. (Kumi) Environmental/Wetlands Fueling Systems Michele Monde, PE (Baker) Reb Guthrie (FSD) Cultural Resources Tim Zinn (Baker)


Design Team

June 29, 2009

 Baker and Associates / MDG  Combined Experience on More Than 350 Similar

Maintenance Facilities for Transit and Municipal Clients  Have Successfully Delivered Similar Bus Maintenance Facilities in the DC Area

4


Design Team

June 29, 2009

5


Project Scope

June 29, 2009

 EMOC Facility – Casey 7 Proposed Location  200 Bus Capacity

 Heavy Equipment Fleet  Approximately 110,000 SF

 Highway Service Facilities – Casey 6 & R.O.

Proposed Location  Salt Storage  Covered Equipment Sheds

 Materials, Soil & Gravel Storage

6


Project Major Goals

June 29, 2009

 Design a functional, state of the art facility  Design a Green/Sustainable facility

 Design a project that fits best in the fabric of

community  Traffic

 Sound  Pollution  Architecture

 Deliver the project on time and within budget

7


Schedule  Two Projects – Schedule Overview  EMOC – Casey 7  Design Complete – June 9, 2010  Construction Complete – January 18, 2012  Highway Services – Casey 6  Design Complete – March 3, 2010  Construction Complete – June 1, 2011

June 29, 2009

8


Design Considerations

June 29, 2009

 Sustainable Design – LEED Silver or better  Integrated Design Process  Environmental and Energy Quality Improvements

 Site Constraints  Relationship to Surrounding Developments  Terrain, Wetlands, Noise & Odor Control  Access & Traffic (Equipment, Automobile, Pedestrian)

 Aesthetic Considerations  Visibility  Washington Grove

9


Sustainable/ Green Design

June 29, 2009

 Site Planning to Maximize Natural Resources  Minimize Footprint

 Stormwater Management

 Facility and Site Design  Less Dependence on Fossil Fuel Energy

Sources  Conserve Water Resources  Operational Efficiencies

 Minimize Impact to Community  Healthy and High Performance Workspaces

10


Casey 7, Casey 6 and Roberts Oxygen Sites

June 29, 2009

11


Roberts Oxygen – Aerial Photo

June 29, 2009

12


Sector Plan

June 29, 2009

13


Zoning

June 29, 2009

14


Transportation

June 29, 2009

15


Environmental

June 29, 2009

16


Site Area

June 29, 2009

17


Setbacks

June 29, 2009

18


Site Elevation

June 29, 2009

19


Site Slope Analysis

June 29, 2009

20


Site Aspect

June 29, 2009

21


June 29, 2009

Proposed Site Allocation Washington Grove

Highway Services - Laydown Area - Intermittent Use & Movements

Highway Services

Roberts Oxygen

- Salt Storage -Covered Equipment -Materials / Soil / Gravel

CASEY 6

State Hwy

EMOC Facility -200 Buses -Heavy Equipment Fleet -Employee Parking -Fleet, Transit & Hwy. Offices

CASEY 7

22


June 29, 2009

Pedestrian Linkage Washington Grove

Pedestrian Walkway

Roberts Oxygen

Potential Access Road to Roberts Oxygen

Buffer CASEY 6

CASEY 7

23


Potential Elevation

June 29, 2009

24


Discussion

June 29, 2009

25


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.