Carlton Hotel Upgrade

Page 1

CARLTON HOTEL UPGRADE, 1433 COLLINS AVE., MIAMI BEACH FL 33139

TEAM: NTDC2012-14-Prop, USGBC TEAM: Michael Badillo, Shihab Naeem LEED AP BD + C


PERVIOUS PAVING AT PARKING IS USED TO REDUCE HEAT ISLAND EFFECT. A FRENCH DRAIN IS CONNECTED TO PERVIOUS PAVING AS IRRIGATION TO PLANTING. CREATE A REFLECTIVE POOL AREA WITH HIGH SRI TO REDUCE HEAT ISLAND EFFECT.

TEAM: NTDC2012-14-Prop


CREATE INTERESTING DESIGN FEATURES LIKE A BIKE RACK THAT SATISFY LOCATION AND TRANSPORTATION CREDITS.

TEAM: NTDC2012-14-Prop


MAKE BUILDING RESIST HEAT GAIN WITH A REFLECTIVE ROOF AND LOW ALBEDO STICKERS ON WINDOWS. UTILIZE MORE EFFICIENT A/C UNITS WITH CLEANER REFRIGERANTS ALONG WITH THIS.

TEAM: NTDC2012-14-Prop


UPDATE INTERIOR BEDROOMS TO HAVE SUSTAINABLE MATERIALS THAT ARE INVITING AND CLEAN. USE BAMBOO FLOORING (RAPIDLY RENEWABLE), COCINA TILE (REGIONAL) IN BATHROOM AND LOW FLOW FIXTURES IN BATHROOM. CLEANER MATERIALS SATISFY IEQ CREDITS THUS CREATING A PLEASANT SPACE FOR OCCUPANTS.

TEAM: NTDC2012-14-Prop


UPGRADE LOBBY AND BAR TO BE MORE INVITING TO GUESTS AND ATTRACT OUTSIDE VISITORS. USE FSC CERTIFIED WOOD FOR NEW MILLWORK FEATURES.

TEAM: NTDC2012-14-Prop


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.