Public Works Department | 2015 Year in Review

Page 1

WHO WE ARE The Public Works Department designs, manages and inspects capital improvement projects; promotes active transportation; plans and builds sidewalks and urban trails; partners with communities to bring improvements to neighborhoods; and maintains the City of Austin’s network of trails, roadways, sidewalks, bridges, and green infrastructure.

FUNDING A breakdown of where our funding comes from and how it is used:

SOURCES OF FUNDS [ TOTAL REVENUE BY SOURCE ]

USES OF FUNDS [ TOTAL SPENDING BY PROGRAM ]

Transportation Fund

70%

Street Preventative Maintenance

22%

Capital Project Management Fund

27%

Minor Construction and Repair

14%

3%

Child Safety Fund

APWA ACCREDITED AGENCY

Other Operations

9%

Street Repairs

9%

Transfers and Citywide Requirements

In fiscal year 2015, the department became one of the few cities to earn full accreditation from the American Public Works Association (APWA). The APWA Accreditation program recognizes public works agencies that are leaders in the industry through the application of best technical and business practices. In achieving accreditation, the department became the 101st accredited agency in North America.

13%

Support Services

7%

Capital Projects Delivery

23% 3%

Child Safety

BUILD + MAINTAIN Our professional and technically skilled staff keeps Austin’s roadways, bridges and trails in good repair by building and maintaining infrastructure throughout the year and around the clock. Along with ensuring vital infrastructure is well maintained, reliable, and safe, we expand and enhance the City’s pedestrian network, prioritizing our work in accordance with the Sidewalk Master Plan.

1771

217

roadway obstructions removed

3154

alleys repaired

835

potholes repaired

612

ADA curb ramps constructed

lane miles of pavement treatments applied

[ INFRASTRUCTURE CONDITIONS IN AUSTIN ]

STREET + BRIDGE OPERATIONS [ TOTAL SPENDING BY TYPE ]

15% 13%

street preventative maintenance + office of city engineer street repairs utility excavation repairs

10%

concrete repairs + construction

10% 1%

right-of-way maintenance bridge maintenance + repairs

TOTAL SPENDING

$37,309,898

FAIR 7,582

23% 50%

POOR

7%

VERY POOR 2,408

TOTAL MILES

ADA-COMPLIANT SIDEWALKS INSTALLED [ MEASURED IN LINEAR FEET ]

13% 50%

20% 15%

2% VERY POOR

TOTAL LANE MILES

View the report online! www.atxpwdannualreport2015.com

51%

GOOD

10% 10%

POOR

EXCELLENT

9%

FAIR

CITY OF AUSTIN PUBLIC WORKS DEPARTMENT 2015 ANNUAL REPORT CONNECTING YOU ALL AROUND AUSTIN

28% 11%

STATE OF THE BRIDGES

GOOD

20% 32%

STATE OF THE SIDEWALKS

EXCELLENT

STATE OF THE STREETS

TOTAL BRIDGES

450

NEARLY 22 MILES CONSTRUCTED + REPAIRED sidewalks constructed

82,988 LF

sidewalks repaired

31,525 LF

TOTAL SPENDING

2.5

MILLION square feet

downtown sidewalks cleaned

130

miles of trails maintained

65%

water recovered during sidewalk cleaning operations

$12,045,00

218

THOUSAND dollars

Transportation User Fee funds spent on sidewalk repairs

99%

roadway emergencies addressed within 24 hours

99%

potholes filled within 72 hours of reporting


DESIGN + DELIVER Department staff manage and deliver capital improvement projects, overseeing them from design to completion. Projects range from iconic, complex projects such as the New Central Library and Second Street Bridge, to smaller-scale street reconstruction, park improvements and water projects.

259

179

projects inspected

336

1162

requests for surveying services

482

Asbestos and lead-based paint work requests completed

94%

4%

Projects without significant deficiencies after a year

Average inspection cost out of total project costs

87%

3% Average project management cost out of total project costs

project milestones delivered on schedule

Our award-winning Neighborhood Partnering Program assists neighborhood groups in developing, resourcing, and executing small- to medium-sized improvement projects in the City’s right of way or on Cityowned property. Cost sharing can be achieved through cash contributions, in-kind contributions, or donated labor (sweat-equity).

TOTAL SPENDING [ BY SPONSOR DEPARTMENT ]

developed plans reviewed

projects managed by Project Management Division

32% 18% 18% 3%

Austin Water Utility Public Works Department Aviation Parks + Recreation Department

13% 8% 8%

TOTAL SPENDING

Other Austin Transportation, Austin Energy, Austin Convention Center, Austin Resource Recovery, Building Services, Economic Development, Financial Services, Planning + Development Review, Health + Human Services, Austin Police Department

$280.2 MILLION

2.8

BILLION

23.5

Construction value of in-house designed projects

MILLION

16 6 .42

13%

ZIP CODES REPRESENTED 78702 78741 78723 78701 78731 78722 78748 78703 78756 78735 78759

THOUSAND DOLLARS

COUNCIL DISTRICTS REPRESENTED 6

AVERAGE TIME FROM

APPLICATION SUBMITTAL TO PROJECT COMPLETION 19 months

BREAKDOWN OF

CONTRIBUTIONS

Miles of trails in design

$247,982

Value of community contribution

Miles of trails under construction

$467,671

Miles of trails completed

Value of City’s contribution

CHILD SAFETY REVENUE

Our Safe Routes to School program helps Austin’s children travel safely to school by educating students on pedestrian and bicycle safety and providing crossing guards at crucial intersections. We also partner with schools to encourage more active transportation through events, programming and educational initiatives.

230

Schools engaged in Safe Routes to School initial planning

87%

714

Total value of approved projects

[ TOTAL REVENUE ]

Crossing Guards

Safety Education

Volunteer hours pledged

Watershed Protection Department

KIDS + SAFETY [ EXPENDITURES ]

Projects completed

Austin Public Library

Total construction value of capital projects portfolio

Our Urban Trails Program works closely with neighborhoods, fellow departments and elected officials to plan and build the best, most environmentally conscious urban trail system that Austin can offer.

SAFE ROUTES TO SCHOOL

11 8 4936

Projects awarded funding

DEVELOP CONNECTED GREENWAYS

Crossing Guards

EMPOWER NEIGHBORHOODS, BUILD COMMUNITY

25

Trained in safe street crossing, bicycle safety, safe bus riding fundamentals, safe rail + train procedures

Participating Schools Participating School Districts

96 7

51,165 STUDENTS

44%

County Vehicle Registrations Revenues received from vehicle registrations

39%

School Zones Revenues from driving violations in school zones

TOTAL REVENUE

$1.72 MILLION


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.