Ecostrategia | Iconic Awards Panel

Page 1

1/4

e(co)stratègia | strategic landscape infraestructure | Barcelona Proposal location

Project main proposals:

Design company: Sau Taller d’Arquitectura

Define the edge between the city and the mountains as a surface, a space occupied by domesticated fields, a place between nature and city where you can find community vegetable gardens, open air green spaces, ... domesticated nature between the concrete of the city and the wildness of the natural park.

Project type: Landscape / Urban Planning Location: Barcelona / Spain The project area is located in the north of Barcelona. The site is the meeting point of some of the cities of the metropolitan area of Barcelona and the main entrance to the city by car and by train. Furthermore, in this place is were Collserola natural parc, Serra Marina natural Parc and Besos river used to meet. Nowadays the relations between these ecosystems are fragmentated by the road and rail infraestructures. This infrastructures also fragmentated the connections of the neighboorhoods and cities converging on this site.

Recover the flow of the green spaces system of barcelona metropolitan area, connecting the Collserola natural park with Besòs river and Serra marina, the mountain system on the other side of the highway. Recovering the valley section of the place and getting a stronger and continuous ecosystem. We also include the green spaces system of the city of Barcelona to this huge green system. Connect "La Trinitat" neighboorhood to the neighboorhoods of its boundaries in order to solve its isolation situation. In conclusion, weaving biological and urban flows in order to improve society and ecosystem toghether. Ecotone between nature and city. Space of transition between the two ecosystems

Proposal aerial view

Collserola natural park to Marina Mountains range section 1:2000

Biodiversity green bridge

Collserola natural Park

Rec Comtal restoration

Pedestrian bridge over Besòs river

New entrance to Besòs river park

Besòs river

Sau Taller d’Arquitectura

Restoration of the area between Besòs river and Marina Mmountains range

Av. Francesc Macià green covering

Marina mountains range


2/4

e(co)stratègia | strategic landscape infraestructure | Barcelona New green spaces system of the Barcelona metropolitan area.

Vegetal native species proposal chart. Trees

Trees (wetlands)

reeds (wetlands)

Pinus halepensis Mill.

Quercus Ilex L.

Quercus suber L.

Quercus cerrioides

Prunus Dulcis

Corylus avellana

Size: 10-20 m.

Size: 5-20 m.

Size: 5-15 m.

Size: 5-20 m.

Size: 4-12 m.

Size:

Size:

Size:

Size:

Size:

2 - 5 m.

10-30 m.

1-3 m.

1-6 m.

5-12 dm.

Flowering period: April-May

Flowering period: April-May

Flowering period: April-May

Flowering period: April-May

Flowering period: January-March

Flowering period:

Flowering period:

Flowering period:

Flowering period:

Flowering period:

January - March

February - April

March - August

June - December

March - July

Arbutus unedo L.

Pistacia lentiscus L.

Viburnum tinus L.

Erica arborea L.

Ruscus aculeatus L.

Quercus coccifera L.

Size: 1-10 m.

Size: 1-8 m.

Size: 2-4m.

Size: 1-4 m.

Size: 2-8 dm.

Size: 5-20 dm.

Flowering period: SeptemberDecember

Flowering period: March-May

Flowering period: September October

Flowering period: February - March

Flowering period: February -April

Flowering period: April - July

Ilex aquifolium L.

Rhamnus alaternus L.

Bupleurum fruticosum L.

Ruta chalepensis L.

Cistus albidus L.

Cistus monspeliensis L.

Cistus salviifolius L.

Alyssum maritimum L.

Spartium junceum L.

Size: 2-15 m

Size: 20 - 50 dm.

Size: 1-3 m.

Size: 2-7 dm.

Size: 4-10 dm.

Size: 5-15 dm

Size: 2-7 dm.

Size: 1-3 dm.

Size:

Flowering period: March - July

Flowering period: October - July

Flowering period: April - July

Ulmus minor

Bushes

View of the new green covering of the site

Phragmites australis

Typha angustifolia

Iris pseudacorus

Aromatic bushes

Flowering period:

Flowering period:

Flowering period:

Flowering period:

Flowering period:

Flowering period:

May-July

February - May

June - August

February - August

April - June

April - June

Lavandula latifolia

Lavandula stoechas L.

Rosmarinus officinalis L.

Thymus vulgaris L.

Foeniculum vulgare L.

Size: 3-8 dm.

Size: 3-10 dm.

Size: 5-20 dm.

Size: 1-3 dm.

Size: 5-20dm.

Flowering period: June - September

Flowering period: May - August

Flowering period: March - October

Flowering period: February - June

Flowering period: June - November

Meadow

Vines

Thorny bushes

Smilax aspera

Lonicera implexa

Size:

Size:

Size:

Size:

3-15 dm.

1-15 m.

1-4 m.

5-30 m.

Flowering period: December - February

Flowering period: August - November

Flowering period: April - July

Flowering period: September November

Crataegus monogyna L.

Calicotome spinosa L.

Ulex parviflorus

Size:

Size:

1-6 m.

1-3 m.

Flowering period: March - May

Flowering period: March - July

1-3 m.

Clemmatis flammula

Hedera helix

Hyparrhenia hirta L.

Brachypodium retusum L.

Size:

Size:

Size:

5-30 m.

3-12 dm.

Flowering period: September November

Flowering period: April - November

2-6 dm. Flowering period: May - August

Weaving all the layers of the territory

Reconnect, widen, strenghten, revitaize. To achieve these objectives some propdifferent interventions are proposed. Interventions generating sinergies between them and the existing elements of the area. Aproaching different fields like society, enviroment and infraestructures in a holistic masterplan reweaving all the layers of the territory. Interventions: 1. Besòs river park ampliation 2. Vallbona Ford 3. New entrances to the Besòs river park 4. Recovering of the agricultural activity 5. Water and biodiversity research and innovation center of the metropolitan area of Barcelona 6. Rec Comtal restoration ( historical water canal of Barcelona) 7. Restoration of the area between Besòs river and Marina mountain range. 8. “Les aigües” green bridge 9. pedestrian bridge 10. Francesc Macià avenue green cover 11. Biodiversity green bridge

Proposal plan 1:5000

Sau Taller d’Arquitectura


3/4

e(co)stratègia | strategic landscape infraestructure | Barcelona Axometry of the site. Construction phases of the proposal Phase1 . Besòs river park ampliation and Vallbona ford implementation

Proposal interventions and time chart intervencions Any 02. Any 03. Any 04. Any 05. Any 01. g. f. m. a. m. j. jl. a. s. o. n. d. g. f. m. a. m. j. jl. a. s. o. n. d. g. f. m. a. m. j. jl. a. s. o. n. d. g. f. m. a. m. j. jl. a. s. o. n. d. g. f. m. a. m. j. jl. a. s. o. n. d. Soterrament línies d’alta tensió Reestructuració de la xarxa electrica Passera per a vianants Connexió entre les dues bandes del Besòs Pont de les Aigües Connexió entre les dues Cases de l’Aigua Pont de la Biodiversitat Connexió entre Collserola i Serra Marina

Erradicació d’espècies invasives Neteja, prevenció i manteniment Neteja espai transició Natura - Ciutat Recuperació de l’Ecotó Recuperació espai entre el riu Besòs i Serra Marina Reconnexió amb els espais lliures annexos Cobertura Avinguda Francesc Macià Connexió verda entre el Besòs i Serra Marina Naturalització Pont de la Biodiversitat Aportació de topsoil Plantació d’arbres i arbustos autòctons Hidrosembra de gramínies autòctones Tasques de consolidació Recuperació de l’activitat agrària Horts urbans a la banda dreta del Besòs Centre del verd i la biodiversitat AMB Rehabilitació i reprogramació de l’estació elevadora Ampliació Parc Fluvial del Besòs Ampliació del Parc fins l’àmbit de projecte Noves entrades a Parc Dues noves entrades al Parc per al tram ampliat El Rec Comtal Recuperació i posta en valor de l’element històric Gual de Vallbona Nou pas entre les dues lleres del riu Besòs

Infraestructures intervention

Enviroment intervention

Social intervention

Maintenance

Enviroment quality of the area

Socioeconomics quality of the area

Phase 2. New entraces to the river park Constructive phases of the green bridge of Biodiversity.

First approachment to the geometry of the bridge of the Biodiversity

One of the requirements for the construction of the green bridge of Biodiversity is to not interrupt the transport flows. The building process of the bridge has been designed to achieve this aim.

The idea is to build a structure with an optimized geometry that minimizes bending and shearing tensions on itself. To achieve that we made an analyis using inverted catenary archs with the propotional weights that the structure must support in the future.

Model of the distributed loads.

Phase 1. Fundations

Phase 2. First metal bars.

Phase 3. Recovering the area between Besòs river and Marina mountain range, the agricultural activity, restoration of “El Rec Comtal” and refurbishment of the old building into the new water and biodiversity research and innovation center of the metropolitan area of Barcelona

Model of the distributed loads and specific loads. Phase 3. Pilars completed

Phase 4. Complete the metal space frame

Checking compatibility between road and railway gauges and structure geometry. Phase 4. Construction of “Les Aigües” green bridge and a pedestrian bridge over Besòs river. Phase 5. Building the concrete slab.

Phase 6. Cover the structure with soil and vegetation.

Phase 5. Construction of the green bridge of the Biodiversity.

Sau Taller d’Arquitectura

Model of location of the pilars between the road lanes and distributed loads.


4/4

e(co)stratègia | strategic landscape infraestructure | Barcelona Proposal view from Collserola natural park to Marina mountain range. The biodiversity green bridge

Metal structure of the green bridge of biodiversity study model

Green bridge of biodiversity transversal section 1:300

Green bridge of biodiversity structure. UPN 200 Metal bars Interior view of the green bridge of biodiversity

Green bridge of biodiversity structure. Triangular metal formwork

Green bridge of biodiversity form and structure studies Top part structure side maximum stress ( compression)

Water drainaige

Max = 2,5 kN/cm2 Mín = 0,05 kN/cm2 Bottom structure side maximum stress ( traction)

Metalic bars lenght (1,50 / 2,00 / 2,50 / 3,00 / 3,50 / 4,00 m )

Green bridge of biodiversity structure. Concrete covered with a 80 cm average thickness of vegetal soil

Max = 2 kN/cm2 Mín = 0,05 kN/cm2 UPN 200 Metalic bars stress ( from 50 to 70 % )

Topgraphy of the green covering

* Structural consulting and structural images credits:

BBG Estructures, recerca i rehabilitació, CODA and MAP13

Sau Taller d’Arquitectura


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.