Florida Beach Management Feasibility Studies (2000 – 2008) — Provided project management and/or quality management services for regional beach management feasibility studies at Walton County\Destin (2000 – 2003, 32 shoreline miles), south Volusia County (2001 – 2003, 11 miles), and Okaloosa Island (2006 – 2008, three miles). Work included evaluation of present and historic beach conditions, analysis of local littoral processes, characterization of native beach sediments, development of sediment budget, cross-shore erosion modeling, assessment of shorefront storm damage risk, and development of a list of feasible beach management projects for the project areas. Recommended management actions include beach and dune restoration.

Beach Restoration Services, Western Walton County and Eastern Destin, Florida (2003 – 2007) — As principal-in-charge, provided permitting, design, plans and specifications preparation, bid administration, and construction management services to restore 6.5 miles of eroded beach with the placement of 3,000,000 cubic yards of sand dredged from East Pass.

New Smyrna Beach Dune Restoration, Volusia County, Florida (2005 – 2006) — As engineer-of-record, provided quality assurance and control and interagency coordination services and directed the design, permitting, preparation of plans and specifications, bid administration, and construction management for restoring 6 miles of dune with 720,000 cubic yards of sand dredged from an upland dredge material management area.

Caxambas Pass Dredging and Beach Restoration, Marco Island, Florida (2004 – 2006) — Provided quality assurance services in the design, permitting, and bid administration phases of pass dredging and beach nourishment to place 150,000 cubic yards of sand along one mile of beach.

Storm Impact Risk Assessment, Phipps Ocean Park Shore Protection Project, Palm Beach, Florida (2003 – 2004) — Project manager of a study using SBEACH to assess shoreline recessions and shorefront structure impacts from 10-, 20-, 50-, and 100-year return period storms.

Sand Dollar Island Coastal Study, Collier County, Florida (2002 – 2003) — Project manager of a study investigating the migration and potential fate of Sand Dollar Island offshore Marco Island.

Marco Island Beaches and Caxambas Pass Monitoring Study, Collier County, Florida (2002 – 2003) — Project manager of a study to document historical and current beach and inlet changes.

Marco Island Beaches and Caxambas Pass Assessment, Collier County, Florida (2002) — Project manager of a study assessing the existing conditions of Marco Island beaches and Caxambas Pass to determine long-term coastal management needs.

Lido Key Hurricane and Storm Damage Reduction Feasibility Study, Sarasota County, Florida (2001) — Project manager for a USACE study incorporating plan formulation, engineering, environmental, economics, real estate, and costestimating elements to define the recommended shore protection project consistent with National Economic Development principles.

Proposed Seawall Extension for Howard Frankland Causeway, HillsboroughPinellas County, Florida (1998) — Used long-term wind data to hindcast waves. Used storm surge and wave data to determine design wave forces on proposed seawall extension.