Teismann_Grad-school-Portfolio

Page 38

Construction Sequence To save time and money, the floor plate was prefabircated out of wood trusses, which also allowed for the mechanical and electrical piping/wiring to run underneath the substrate. Insulation was added and then the substrate was installed. The SIPS were then constructed to form the perimeter of the house.

Floor Plate

Pipe & Insulate

Substrate & SIPS


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.