Portfolio - Miho T

Page 1

Professional Experiences 24 Drydock in MA 49th Avenue in NY HMC Retail in MA Mass Timber in MA Hato Ray in Puerto Rico Bull Path Poolhouse & Fireplace in NY Cambridge House in MA West End Ave, NY Competition - Renovation of the Castle in Italy

works

Academic Year Memorial Museum of Canal - Graduation work in M. Archi


24 Drydock Project Type: Life-Science Location: Long Island City, NY Size: +/- 237,000 sqft

LAB / OFFICE

Ground-up construction project that is located in the marine industry area. The 8-story lab & office building that includes headquarters for Boston Ship Repair (BSR), training facility and office space for local nonprofit Save The Harbor / Save The Bay and a restaurant on ground level.

Life-Science / Office

Professional Experience

Life-Science / Office

Professional Experience

Responsibility: SD-CD phase (including early phase of CA). Design Study for Balcony, Core configuration, and ground floor plan coordination (DD-CD). BOMA calculation for city local filing. Construction documentation and detailing for core, stairs, ramps, and canopy.


Overall Building

CLIENT CRONIN GROUP 1

Drydock stands in close proximity to the existing

1.2 1.3

2

3

3.5

3.9 4

4.8

4.9

5.85.9

5

6

6.9

7

8

8.6

9

9.1

10

11

250 Northern Ave #400 Boston, MA 02210 617.737.2366

12

358' - 2" 10' - 4"

22' - 0"

33' - 0"

33' - 0"

27' - 0"

3' - 2"

2' - 10"

33' - 0"

29' - 6"

1' - 9"

31' - 3"

18' - 0"

15' - 0"

1 A-314

drydock, seamlessly integrating with the bustling

29' - 4"

3' - 8"

33' - 0"

CLIENT RELATED BEAL

32' - 4"

177 Milk St # 2 Boston, MA 02109 617.451.2100

2 A-318

STRUCTURAL ENGINEER MCNAMARA SALVIA

SCREEN WALL 154' - 0"

industrial community while contributing to the

101 Federal Street, Suite 1100 Boston, MA 02110 617.737.0040

LEVEL M2 MECHANICAL ROOF 140' - 9"

19' - 3"

growth of a vibrant innovation ecosystem. This project encompasses an eight-story structure for a office/lab tenants, serving as the future

MEPFP & LEED COSENTINI ASSOCIATES 101 Federal Street, Suite 600 Boston, MA 02110 617.748.7800

CIVIL ENGINEER NITSCH ENG

M1 MECH. ELEVATOR CONTROL ROOM 126' -M1 2" LEVEL MECHANICAL 121' - 6"

2 Center Plaza, Suite 430 Boston, MA 02108-1928 617.338.0063

ACOUSTICAL CONSULTANT ACENTECH 33 Moulton Street Cambridge, MA 02138 617-499-8000

LANDSCAPE ARCHITECTURE VERDANT

LEVEL 8 107' - 0"

318 Harvard Street, Suite 25 Brookline,MA 02446 617.735.1180

14' - 6"

headquarters for Boston Ship Repair, housing

VERTICAL TRANSPORTATION VDA

LEVEL 7 92' - 6"

100 Summer Steet, Suite 1600 Boston, MA 02110 617.574.5099

14' - 6"

a training facility, and featuring a restaurant.

CODE CONSULTANT CODE RED CONSULTANTS, LLC

Furthermore, it actively encourages the adoption

154 Turnpike Rd, Suite 200 Southborough, MA 01772 617.500.7633

14' - 6"

136' - 9"

LEVEL 6 78' - 0"

of emerging economy endeavors. The Proposed

14' - 6"

SHAFT

HOISTWAY

HOISTWAY

LEVEL 5 63' - 6"

Project outlines the allocation of space for

434 Massachusetts Ave #506 Boston, MA 02118 617.267.950

ENCLOSURE SYSTEM GORDON H. SMITH

DOOR HARDWARE CAMPBELL McCABE

14' - 6"

63 Great Road Maynard, MA 01754 781.899.8822

9 A-605

LEVEL 3 34' - 6"

SEAL / SIGNATURE

14' - 6"

sciences/research and development facilities.

LIGHTING DESIGNER SLADEN FEINSTEIN

200 Madison Ave, Suite 2120 New York, NY 10016 212.696.0600

LEVEL 4 49' - 0"

two key tenants: Boston Ship Repair and life

Elevations & Section

PROJECT TEAM:

14' - 6"

Material & Expression

Building Façade Ariculation

200 HIGH ST, BOSTON, MA 02110 857.300.2610 | SGA-ARCH.COM

Located in Boston’s industrial district, 24

16' - 0"

LEVEL 2 20' - 0"

4' - 0"

8' - 3"

10' - 0"

3HR FIRE RATED ENCLOSURE

LEVEL P EXTENSION -10' - 0" GARAGE -14' - 0" BCB -16' - 6"

6' - 6"

9 1/2"

12' - 3"

© Spagnolo Gisness & Associates, Inc.

LEVEL 1 4' - 0" GRADE LEVEL 0"

ELEVATOR PIT BEYOND SUMP PIT

07/28/2023

PROJECT:

24 DRYDOCK AVENUE

24 Drydock Avenue Boston, MA

REVISIONS: No. Date

Description

BUILDING SOUTH SECTION - PARKING GARAGE 1 LONGITUDINAL 3/32" = 1'-0"

Building Section - Facing South

SUBMISSIONS:

Date Issued For: 02/25/22 Schematic Design 12/09/22 Design Development 07/28/23 Construction Documents

Key Plan - Wall Sections

NEW CONSTRUCTION

SCALE As indicated DATE ISSUED 07/28/2023 PROJECT NO 5097 DRAWN BY Author CHECKED BY Checker

2/ A-315

2/ A-316

1/ A-316

2/ A-317

1/ A-317

1/ A-318 1/ A-315

BUILDING SECTIONS LONGITUDINAL SECTION B

A-302

Life-Science / Office

2/ A-313

1/ A-313

1/ A-312

2/ A-312

1/ A-314

Professional Experience

Life-Science / Office

Professional Experience

7/28/2023 3:31:07 PM

1/ A-311

SHEET TITLE:

2/ A-318


Building Envelope and Facade

Material and Articulation Life-Science / Office

Professional Experience

Design and Articulation

The main entry of the building serves as a focal point, where a canopy is centrally located above the double-bay expression, providing shelter and a sense of arrival. The entry is further accentuated with a double-bay recessed design, artfully framed with a cross frame detail, offering a striking and inviting architectural element.

Life-Science / Office

Building Envelope and Facade Professional Experience

In the design of the building facade/envelope, distinctive features are used to create a unique architectural expression. These features include single columns strategically positioned at the building’s corners, a double-bay glass arrangement that imparts a sense of openness and transparency, and cross bracing discreetly positioned behind the glass, enhanced with frit to optimize visibility.


Building Support

Tenant Support

Building Shafts

Tenant - Classroom

MEP

Tenant - Boston Ship Repair

Major Vertical Circulation

Amenity - Bike room

Building Circulation

Lumch & Counter Floor Service Area

6( 6)

9(67,%8/( 6)

2,/ 3803 6) 3$5.,1* ,17$.( 6+$)7 /2$',1* '2&. 6) 5(675220 6)

3( 6)

3( 6) (/(9 /2%%< 6)

:$7(5 3803 6)

67$,5 6)

),5( 3803 6)

)(&

83 )(&

6:,7&+%2$5' 6)

&255,'25 6)

75$16)250(5

'1

6:,7&+*($5

%

67$,5 6)

%

(0(5* (/(& $'$ 5(675220 6) 6)

6(&85,7< 785167,/(6

&255,'25 6)

/2%%< 6) /2&.(5 5220 6)

0(1 6 5(675220 6)

&

67$,5 83 6)

&

-$1,725 &/26(7 6)

%65 6)

9(67,%8/( 6)

6(&85,7< &/26(7 /2&.(5 5220 6) 6)

'

:20(1 6 5(675220 6)

%,.( 5220 6)

6287+ (175$1&( 6)

%

83

),5( &200$1' &(17(5 6)

75$16)250(5

,') 6)

&/$665220 6725$*( 6)

&/$665220 $ 6)

$

83

3+ 1(875$/,=$7,21 6)

6(&85,7< '(6.

&/$665220 % 6)

$

83

83

0$1$*(0(17 2)),&( 6)

&/ 6)

&255,'25 6)

7(1$17 5(7$,/ /81&+ &2817(5 $5($ 6)

(/(&75,&$/ 9$8/7 6)

83

83

83

3( 6)

3( 6)

)8// 5$1*( '2&. /,)7

/2$',1* '2&. 6)

/2$',1* '2&. 6)

'2&. /(9(/(5

83

&+(0,&$/ 6725$*( 6)

)(&

75$6+ 5(&<&/,1* &203$&725

83

)(&

)(&

83

'

83 83

Lobby Seating Area

Reception Area

Corridor

Alcove at Corridor

South Entry

Life-Science / Office

Elevator Lobby

DRYDOCK AVENUE

Professional Experience

Life-Science / Office

Professional Experience

Ground Floor Plan

(

83


200 HIGH ST, 857.300.2610

12

11

10

9.1

1 A-303

9

8

1 A-403

7

2

A-203

6.9

6

1

A-303

5.9

5.8

5

4.9

4

3

2

1.3

1.2

PROJECT TE

1

CLIENT CRONIN GRO

250 Northern A Boston, MA 022 617.737.2366

358' - 2" 32' - 4"

33' - 0"

3' - 8"

29' - 4"

33' - 0"

31' - 3"

1' - 9"

29' - 6"

2' - 9"

30' - 3"

2' - 10"

30' - 2"

33' - 0"

33' - 0"

22' - 0"

2' - 10" 7' - 6"

CLIENT RELATED BE

CHEM. EXHAUST 3-020

3 A-321

TENANT EXHAUST 3-005

SERVICE CORRIDOR 3-006

13

3-005 EXTERIOR BALCONY 3-019

3-011 3-010

SE-1 3-E1

PE-2 3-E3

WOMENS ROOM 3-009

FIRE ALARM 3-014

3-014

STAIR 2 3-ST02

3-019 EX

STAIR 1A 3-ST01A

PLUMBING SHAFT 3-021

UP

3-001

IDF 3-002

SHAFT 3-007

SHAFT 3-008

02

B 3-018 EX

3-ST01A

01

STAIR PRESSURIZATION 3-003

101 Federal Str Boston, MA 021 617.748.7800

SHAFT 3-016 13

3-006B

3-007

3-017A

EXIT PASSAGEWAY 3-017

3-017B

B.1

97' - 8" 2' - 1"

C.1

2 Center Plaza, Boston, MA 021 617.338.0063

33 Moulton Stre Cambridge, MA 617-499-8000

LANDSCAPE VERDANT

1 A-301

318 Harvard Str Brookline,MA 02 617.735.1180

D

VERTICAL TR VDA

100 Summer St Boston, MA 021 617.574.5099

TENANT SPACE 3-022

24' - 10"

CIVIL ENGINE NITSCH ENG

ACOUSTICAL ACENTECH

C

22' - 0"

7"

MEPFP & LEE COSENTINI A

3-ST02

3-002 FE

1 A-302

EXTERIOR BALCONY 3-018

3-ST01B KITCHEN EXHAUST 3-004

STRUCTURA MCNAMARA

101 Federal Str Boston, MA 021 617.737.0040

3-013

3-009

PE-3 3-E4

PE-1 3-E2

177 Milk St # 2 Boston, MA 021 617.451.2100

A.2

1 A-321

ELECTRICAL & TEL/DATA 3-013

STAIR PRESSURIZATION 3-015

ELEV. LOBBY 3-001

3' - 8"

EMERG. ELEC. 3-012

JAN. 3-011

MENS ROOM 3-010

29' - 4"

FEC

1' - 9"

A-204 2

05

8' - 7"

3-006A

A

1 A-204

CODE CONS CODE RED C

154 Turnpike R Southborough, 617.500.7633

7' - 6"

D.8 E

LIGHTING DE SLADEN FEIN

434 Massachus Boston, MA 021 617.267.950

ENCLOSURE GORDON H.

200 Madison Av New York, NY 1 212.696.0600

1 A-202

DOOR HARD CAMPBELL M

63 Great Road Maynard, MA 01 781.899.8822

SEAL / SIGNA

Life-Science / Office

Professional Experience

Life-Science / Office

Professional Experience

3 - OVERALL PLAN 1 LEVEL 3/32" = 1'-0"

© Spagnolo Gis

07/28/2023

PROJECT:

24 DRYDO

24 Drydock MA


LEGEND Lab Program Office Program

2-hour rated Horizontal Exit Wall Egress Corridor

Building Core

Hold-open Fire Door

Horizontal Exit 6(59,&( &255,'25

6(

7(1$17 2)),&(

3(

(;7(5,25 %$/&21<

0(16 5220

(/(&75,&$/ 7(/ '$7$

3(

(/(9$725 /2%%<

67$,5

3(

-$1

:20(16 5220

),5( $/$50

67$,5 (;7(5,25 %$/&21<

,')

&255,'25

(;,7 $&&(66

&255,'25

7(1$17 /$%

7(1$17 2)),&(

7(1$17 /$%

TENANT 1

TENANT 2

Life-Science / Office

Professional Experience

Life-Science / Office

Professional Experience

Test-fit at Typical Floor Level - Two tenant


South Entry

6,/,&21( 75$16,7,21 6+((7 6(/) $'+($5(' $,5 9$325 %$55,(5 0,1(5$/ :22/ ,168/$7,21

/(9(/

$/80 5$,16&5((1 3$,9(/

75$16,7,21 $/80 )/$6+,1* 675,3 6(7 ,1 $ %(' 2) 6($/$17 7(50,1$7,21 ($5 6(7 ,1 %(' 2) 6($/$17

; :22' %/2&.,1*

732 /,48,' )/$6+,1*

35( ),1,6+(' $/80,180 &/($7 $1' 67,))(1(5

732 522),1* 0(0%5$1(

,1),// &$9,7< : %$77 ,168/$7,21

3529,'( 3,1 02817(' $/80,180 6,*1$*( 3529,'( /(' %$&. /,*+7 :,7+,1

7$3(5(' 0,1(5$/ :22/ ,168/$7,21

0(7$/ '(&.

&2/' )250 )5$0,1*

+66 )5$0,1* 6(( 6758&785$/

35( ),1,6+(' $/80,180 67,))(1(5

6(/) $'+(5(' $,5 $1' 9$325 %$55,(5

/2: &21'8&7,9,7< = *,576

)855,1* &+$1(/

/2: &21'8&7,9,7< = *,57

:22' /22. 0(7$/ 3$1(/ 62)),7

)855,1* &+$1(/

6,/,&21( 6+((7 )/$6+,1*

35( ),1,6+(' $/80,180 )$&,$

&2/' )250 )5$0,1*

$,5 $1' 9$325 %$55,(5

78%( 67((/ )5$0,1*

),%(5*/$66 5(,1)25&(' *<3680 %2$5'

5 %$77 ,168/$7,21

'5$,1 3,3( 6(( 3/80%,1* '5$:,1*6

0(7$/ '(&.

5 %$77 ,168/$7,21 : %($0 6(( 6758&785$/ '5$:,1*6

35( ),1,6+(' $/80 75(1&+ '5$,1

Canopy / Gusset Plan and Details

Entry Rendering, Elevation, and Plan

South Entry

:22' /22. 0(7$/ 3$1(/ 62)),7 $/80,180 62)),7

Canopy Detail - Cross Bracing Soffit Pocket & Trench Frain &$123< 7(50,1$7,21 '(7$,/ :(67 (/(9$7,21 (175$1&( (

7<3,&$/ &$123< 3(5,0(7(5 ('*( '(7$,/ (

CANOPY DETAIL

6,/,&21( 75$16,7,21 6+((7

6,/,&21( 75$16,7,21 6+((7

6(/) $'+($5(' $,5 9$325 %$55,(5

6(/) $'+($5(' $,5 9$325 %$55,(5

0,1(5$/ :22/ ,168/$7,21

0,1(5$/ :22/ ,168/$7,21

75$16,7,21 $/80 )/$6+,1* 675,3 6(7 ,1 $ %(' 2) 6($/$17 ),%(5*/$66 5(,1)25&(' *<3 %'

7(50,1$7,21 ($5 6(7 ,1 %(' 2) 6($/$17

0(7$/ 678'6

,1),// &$9,7< : %$77 ,168/$7,21

GUSSET DETAIL

$/80 5$,16&5((1 3$,9(/

732 /,48,' )/$6+,1*

,1),// &$9,7< : %$77 ,168/$7,21

732 522),1* ),(/' 0(0%5$1(

522) '5$,1 6(( 3/80%,1* '5$:,1*6 7$3(5(' ,168/$7,21

&2/' )250 0(7$/ 678' 62)),7 )5$0,1*

35( ),1,6+(' $/80 75(1&+ '5$,1

+66 )5$0,1* 6(( 6758&785$/

,168/$7(' '5$,1 3,3( 6(( 3/80%,1* '5$:,1*6

D.8

E

8

7

6.9

6

5.9

/2: &21'8&7,9,7< = *,57 35( ),1,6+(' $/80,180 62)),7 6(/) $'+(5(' $,5 $1' 9$325 %$55,(5

200 HIGH ST, BOSTON, MA 02110 857.300.2610 | SGA-ARCH.COM

LEVEL 3 34' - 6"

; $/80 78%( )5$0,1* # 2 &

CLIENT CRONIN GROUP

35( ),1,6+(' (;758'(' $/80,180 )5$0(

250 Northern Ave #400 Boston, MA 02210 617.737.2366 14' - 6"

CLIENT RELATED BEAL

/2: &21'8&7,9,7< = *,576

177 Milk St # 2 Boston, MA 02109 617.451.2100

&5266 %5$&,1* 62)),7 32&.(7 '(7$,/ Canopy Detail - Cross Bracing Soffit Pocket & Trench Frain 6287+ &$123< 6287+ (175$1&( &$123< 75(1&+ '5$,1 '(7$,/

STRUCTURAL ENGINEER MCNAMARA SALVIA

1' - 6"

101 Federal Street, Suite 1100 Boston, MA 02110 617.737.0040

(

MEPFP & LEED COSENTINI ASSOCIATES

CANOPY

2' - 6"

:22' /22. 0(7$/ 3$1(/ 62)),7

$/80,180 3$1(/ 0,1(5$/ :22/ ,168/$7,21

PROJECT TEAM:

LEVEL 2 20' - 0"

)855,1* &+$1(/

&217,18286 6($/$17 $1' %$&.(5 52'

101 Federal Street, Suite 600 Boston, MA 02110 617.748.7800

CIVIL ENGINEER NITSCH ENG

16' - 0"

2 Center Plaza, Suite 430 Boston, MA 02108-1928 617.338.0063

ACOUSTICAL CONSULTANT ACENTECH 33 Moulton Street Cambridge, MA 02138 617-499-8000

LEVEL 1 4' - 0" 4' - 0"

CODE CONSULTANT CODE RED CONSULTANTS, LLC

LIGHTING DESIGNER SLADEN FEINSTEIN

6

2 A-540

ENCLOSURE SYSTEM GORDON H. SMITH

2' - 8"

&2&1&5(7( :$//

200 Madison Ave, Suite 2120 New York, NY 10016 212.696.0600

DOOR HARDWARE CAMPBELL McCABE CANOPY

4' - 8"

SLOPE

SLOPE

DOWNSPOUT ATTACHED TO STEEL COLUMN

2' - 7 1/2"

7' - 4"

SLOPE

1 A-540

$,5 9$325 %$55,(5

434 Massachusetts Ave #506 Boston, MA 02118 617.267.950

63 Great Road Maynard, MA 01754 781.899.8822

$,5 9$325 %$55,(5 *5$1,7( 9(1((5 3/$17,1* 62,/ 0,; 6(( /$1'6&$3( '5$:,1*6

SEAL / SIGNATURE

),/7(5 )$%5,&

3529,'( :((36 )25 '5$,1$*( 72 (;7(5,25 :$//

:,'( :((3 23(1,1* # 2 &

+27 58%%(5,=(' $63+$/7 522),1* 6<67(0 72 87,/,=( :((36 7+528*+ )281'$7,21 :$// 72 '5$,1 72 (;7(5,25

4 A-322 EQ 1' - 6"

STRUCTURAL STEEL FRAMING - C CNANNEL 59' - 6" CANOPY WIDTH

WALL MOUNTED DRAIN

SIDEWALK BEYOND

EQ

*5$'( /(9(/

1' - 6"

62' - 6"

SOUTH - PLAN 2 CANOPY 1/4" = 1'-0"

© Spagnolo Gisness & Associates, Inc.

07/28/2023

PROJECT:

South Entrance Enlarged Plan

24 DRYDOCK AVENUE

24 Drydock Avenue Boston, MA

REVISIONS: No. Date

Description

Gusset Section Detail

South Entry Parspective

Life-Science / Office

3 A-540

/(9(/

Professional Experience

7

E

Life-Science / Office

*$/9$1,=(' &2/' )250(' 0(7$/ )5$0,1*

154 Turnpike Rd, Suite 200 Southborough, MA 01772 617.500.7633

8

/(9(/

37 %/2&.,1* 6+,0 $6 5(48,5('

100 Summer Steet, Suite 1600 Boston, MA 02110 617.574.5099

South Entrance Elevation

Professional Experience

03 $9%

3(5

VERTICAL TRANSPORTATION VDA

SOUTH - ELEVATION 3 CANOPY 1/4" = 1'-0"

DOWNSPOUT ATTACHED TO STEEL COLUMN

; $/80 78%( )5$0,1* # 2 &

67$,1/(66 67((/ )/$6+,1*

318 Harvard Street, Suite 25 Brookline,MA 02446 617.735.1180

GRADE LEVEL 0"

ON

&5266 %5$&,1* 1(<21'

LANDSCAPE ARCHITECTURE VERDANT



49th Avenue Project Type: Life-Science Location: Long Island City, NY Size: +/- 50,000 sqft

LAB / OFFICE

Envelope upgrades and interior upgrades for the lab & office use on 5th and 6th floors and perimeter wall as well as the roof.

Life-Science / Office

Professional Experience Professional Experience

Life-Science / Office

Professional Experience

Responsibility: Completion of DD documentation set that includes envelope package and infrastructure package.


)

(

'

&

%

Design Development

*

$

(;,67,1* :$7(57$1.6

(;,67,1* 6758&785(

Envelope & Infrastructure Package

Envelope & Infrastructure Package

Design Development

+

723 2) 6.</,*+7 6758&785( (

(

(

(

(

723 2) 522)

Overall Building Axon - South East

Rooftop Elevation - East

Overall Building Axon - North West Partition Notes

Partition Notes

1 / A-110

1 / A-109

4. 5. 6.

7.

6

7

8

9

9

10

10

11 26' - 3"

24' - 7"

L5.16

26' - 3"

26' - 3"

L5.15

P1

L5.14

P1

26' - 3"

L5.13

P1

26' - 3"

L5.12

P1

26' - 3"

L5.11

P1

26' - 3"

L5.10

P1

26' - 3"

L5.9

P1

26' - 3"

L5.8

P1

8. 9. 10.

26' - 3"

L5.7

P1

Partition Legend L5.7

P1L5.6 L5.8

P1

P1

SYMBOL

A

A

L5.6

P1

P1

1 Lincoln St Boston, MA 02111 857.998.8800

%

&

'

(

)

*

25' - 10"

$

+

C6F

P2

EXISTING PARTITION AND DOOR TO REMAIN

27' - 0"

L5.18

EX. MEN'S RESTROOM 5-058

EX. WOMEN'S RESTROOM 5-054

4" 27' - 0"

D

2CH4 EX. VEST SHAFT 5-055 5-S06

P2

27' - 0"

EX. VEST 5-056

EX. JC 5-057

1G3A

P1

EX. VEST 5-059

LIGHTING DESIGN SLADEN FEINSTE

NEW GLAZING PARTITION AND DOOR OPENING SHALL BE 6" FROM CORNER UNLESS OTHERWISE NOTED

434 Massachusetts A Boston, MA 02118 617.267.9500

Construction Plan Keynotes - Level 5 - Conbined ID P1 P2 P11

NOTES NEW WINDOW AND FRAME TO BE INSTALLED; REFER TO SPECS PERIMETER WALL TO BE FURRED OUT WITH A C6F ASSEMBLY WALL, REFER TO PARTITION TYPES CONTRACTOR TO VIF EXISTING SHAFT WALL AND CONFIRM IF ASSEMBLY IS 3 HOUR RATED.

1

2

L5.43

3

1 A-300

1

C6F

L5.42 EX. SHAFT 5-S55

P1

C Spagnolo Group A 08/10/22

C Spagnolo Group Architecture, PC 08/10/22

F

PROJECT:

PROJECT:

Nan Fung 49th

L5.41

EX. ELEV 5-E5

Nang Fung 49th Ave LIC

Nang Fung 49th

3CH4

STAIR P 5-ST-P

G Drawing Package: 9) Combined Set

No. Date

3CH4

Description

P2

C6F

C6F

L5.24

L5.25

P1

L5.26

P1

L5.27

P1

L5.28

P1

L5.29

P1

L5.30

P1

L5.31

P1

L5.32

P1

No. Date

L5.40 P2

EX. ELEV 5-E6

L5.33

P1

P1

P1

L5.32 L5.34

P1

L5.33

P1

L5.34

P1

P1

SUBMISSIONS:

2' - 2"

Date Issued For: 04/01/22 Schematic Design L5.36 Design Development 100% 08/10/22

L5.35

P1

L5.37

P1

L5.38

P1

Date Issued For: 04/01/22 Schematic D 08/10/22 Design Deve

L5.39

SCALE As DATE ISSUED 08 PROJECT NO 53 DRAWN BY Au CHECKED BY Ch

SCALE As indicated DATE ISSUED 08/10/22 PROJECT NO 5388 DRAWN BY Author CHECKED BY Checker

SHEET TITLE:

SHEET TITLE:

PLAN - LEVEL 5 - SECTOR 2 1 FLOOR 3/32" = 1'-0" 5 - FLOOR PLAN - SECTOR 1 1 LEVEL 3/32" = 1'-0"

Rooftop Elevation - West

Overall Floor Plan - Level 5th

FLOOR PLAN LEVEL 5 SECTOR 1

FLOOR P LEVEL 5 SECTOR

A-109.00

A-110

(05 1(: (/(9$725 522)

(05 1(: (/(9$725 '811$*(

(

/

/

/

723 2) 522)

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

(

(

(

(

(

(

(

(

(

(

(

(

(

(

(

(

(

(

(

(

(

(

(

(

(

(

(

(

(

(

(

/(9(/ /(9(/

/(9(/

9,)

(

9,)

/

/(9(/

9,)

/(9(/

522) /(9(/ $1(;

(

(

(

% $

9,)

/(9(/ /(9(/

/(9(/

9,)

/(9(/

% %

/(9(/ 833(5

9,)

(

9,)

/(9(/

Life-Science / Office

Professional Experience

/(9(/

%$6(0(17

Building Elevation - South

Building Elevation - North

Life-Science / Office

/

Professional Experience

/

9 , )

/

/

9 , )

/

/

9 , )

/

/

9 , )

/

9 , )

/

9 , )

/

9,)

/

723 2) 522) /

Descript

P1

C6F

SUBMISSIONS:

H

H

REVISIONS:

STAIR O 5-ST-O

EX. SHAFT 5-S57

L5.23

P2

Drawing Package: 9) Com

P11

REVISIONS: 26' - 0"

24-02 49th Ave Island City, NY.

P1

26' - 0"

27' - 0"

24-02 49th Avenue, Long Island City, NY.

L5.22

27' - 0"

EX. SHAFT 5-S56

P1

(/(9$725 /2%%< 723 2) 522)

2

SEAL / SIGNATUR

P2

EX. ELEV 5-E4

EX. SHAFT 5-S53

Nan Fung 49th Ave LIC

(

KEY PLAN

EX. VEST 5-061

1 A-300

P1

(

55 Water Street, 51st New York, NY 10041 212.699.4749

NEW PARTITION AND DOOR OPENING SHALL BE 6" FROM CORNER UNLESS OTHERWISE NOTED

P1

F

(

350 5th Avenue, Suite New York, NY 10118 646.278.8484

UPPER CASEWORK - SEE ELEVATIONS FOR ADDITIONAL INFORMATION, PROVIDE CONTINUOUS 2x FIRE TREATED IN-WALL BLOCKING TO SUPPORT CASEWORK.

EXISTING MECH ROOM 5-063

KEY PLAN

L5.21

G

PROJECT MANAG PMA

PROVIDE FIRE TREATED IN-WALL BLOCKING FOR MOUNTED TELEVISION CENTERED AT 60" AFF UNLESS OTHERWISE NOTED ON ELEVATIONS OR AV DRAWINGS. COORDINATE EXACT AREA OF BLOCKING WITH AV EQUIPMENT / VENDOR.

SEAL / SIGNATURE

27' - 0"

EXISTING PARTITION AND DOOR TO REMAIN

L5.44

EX. MECH RM 5-052

723 2) 6.</,*+7 6758&785(

105 Madison Avenue, New York, NY 10016 212.840.0060

CONSTRUCTION M HUNTER ROBERT

E

P1

MEP ENGINEERIN BR+A

EX. MECH RM 5-051

E

(05 5220

NEW RUBBER MAT WALKWAY

P2

NOTES

NEW WINDOW AND FRAME TO BE INSTALLED; REFER TO SPECS PERIMETER WALL TO BE FURRED OUT WITH A C6F ASSEMBLY WALL, REFER TO PARTITION TYPES CONTRACTOR TO VIF EXISTING SHAFT WALL AND CONFIRM IF ASSEMBLY IS 3 HOUR RATED.

EX. VEST 5-059

1 A-300

L5.20 EX. ELEV 5-E2

EX. JC 5-057

ID P1 P2 P11

D

5-001A

P1

1 Lincoln St Boston, MA 02111 857.998.8800

45 West 45th Street, 1 New York, NY 10036 212.246.9800

C6F

Construction Plan Keynotes - Level 5 - Conbined

EX. ELEV 5-E3

EX. SHAFT 5-S51

CLIENT NAN FUNG

STRUCTURAL EN MCNAMARA SALV

DEFINITION

NEW INSULATION AND WATERPROOFING

P1

54 W 21st Street, NE 857.300.2610 | SGA

PROJECT TEAM:

SHAFT B-025

RODI 5-002

EX. STAIR A 5-ST-A

C6F

7 2 (05 5220 522)

EX. SHAFT 5-S52

EX. ELEV 5-E1

1G3A

L5.45

EXISTING MECH ROOM 5-062

UPPER CASEWORK - SEE ELEVATIONS FOR ADDITIONAL INFORMATION, PROVIDE CONTINUOUS 2x FIRE TREATED IN-WALL BLOCKING TO SUPPORT CASEWORK.

1G3 AIR/VAC 5-003

5-001B

STAIR M 5-ST-M

434 Massachusetts Ave, Suite 506 Boston, MA 02118 617.267.9500

PROVIDE FIRE TREATED IN-WALL BLOCKING FOR MOUNTED TELEVISION CENTERED AT 60" AFF UNLESS OTHERWISE NOTED ON ELEVATIONS OR AV DRAWINGS. COORDINATE EXACT AREA OF BLOCKING WITH AV EQUIPMENT / VENDOR.

C 1G3A

P1

SYMBOL

NOT IN CONTRACT (N.I.C.)

LIGHTING DESIGN SLADEN FEINSTEIN

EX. MEN'S EX. WOMEN'S NEW GLAZING PARTITION AND DOOR OPENING SHALL BE 6" RESTROOM RESTROOM FROM CORNER UNLESS OTHERWISE NOTED 5-058 5-060

SHAFT B-024

L5.19

Partition Legend

L5.1

55 Water Street, 51st Floor New York, NY 10041 212.699.4749

NEW PARTITION AND DOOR OPENING SHALL BE 6" FROM CORNER UNLESS OTHERWISE NOTED

C

P1

REFER TO GENERAL CONDITIONS, SPECIFICATIONS AND SCHEDULES FOR ALL WORK. DRAWINGS LISTED UNDER THE 'DRAWING LIST' MUST BE READ IN CONJUNCTION WITH THIS DRAWING FOR COMPLETE INFORMATION. CONFIRM WITH ARCHITECT THAT THESE DRAWINGS ARE THE MOST CURRENT ISSUE BEFORE BEGINNING LAYOUT AND CONSTRUCTION. CONTRACTOR MUST GIVE ARCHITECT (4) WORKING DAYS NOTICE TO REVIEW PARTITIONS, FLOOR OUTLETS AND FURNITURE PANEL SYSTEM LAYOUT AT 'CHALK LINE' STAGE. TRACK AND STUD WORK SHALL NOT BEGIN BEFORE ARCHITECT HAS REVIEWED ENTIRE LAYOUT. ALL GRID DIMENSIONS ARE SHOWN FOR REFERENCE ONLY AND CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND COORDINATE ANY DISCREPANCIES WITH ARCHITECT / ENGINEER OF RECORD. INTERIOR DETAILS ARE KEYED TO THE PLANS AT TYPICAL LOCATIONS. THE DETAILS APPLY TO ALL LOCATIONS THAT ARE NOT KEYED - IN AN AREA OF THE SAME CONSTRUCTION AND SCOPE OF WORK. THE CONTRACTOR AND SUBCONTRACTORS ARE RESPONSIBLE TO COORDINATE THE LOCATION OF ALL TYPICAL DETAILS AND INSTALL THE WORK INDICATED. IF DISCREPANCIES EXIST OR QUALIFICATION IS REQUIRED THE CONTRACTOR IS TO NOTIFY THE ARCHITECT TO OBTAIN CLARIFICATION. ALL VERTICAL AND HORIZONTAL DUCTS, PIPE, CONDUIT, ETC. (WHETHER SHOWN OR NOT) IN FINISHED ROOMS SHALL BE FURRED IN AND FINISHED TO MATCH ADJACENT FINISHED SURFACES AND ANY REQUIRED WALL OR CEILING RATINGS. THROUGHOUT AREA OF WORK, PATCH/REPAIR AND PREPARE WALLS TO RECEIVE NEW FINISHES PARTITION DIMENSIONS ARE TO THE FINISH FACE OF WALL, UNLESS NOTED OTHERWISE ALL SPOT ELEVATIONS AT EXISTING SLABS MUST BE VERIFIED IN FIELD AND NEW SLAB HEIGHTS MUST BE COORDINATED WITH EXISTING HEIGHTS AND BE ADJUSTED ACCORDINGLY.

CONSTRUCTION MANAGEMENT HUNTER ROBERTS

EX. SHAFT 5-S50

1G3A

L5.2

P1

350 5th Avenue, Suite 3020 New York, NY 10118 646.278.8484

B

3' - 2 7/8"

L5.3

8. 9. 10.

24' - 7"

PROJECT MANAGEMENT PMA

NEW RUBBER MAT WALKWAY

P1

1 A-300

C6F

NEW INSULATION AND WATERPROOFING

EX. MEN'S RESTROOM 5-053

17

26' - 3"

45 West 45th Street, 10th Floor New York, NY 10036 212.246.9800 P2

B

16

26' - 3"

STRUCTURAL ENGINEERING P1 P1 L5.4 MCNAMARA SALVIA

L5.5

C6F

STAIR L 5-ST-L

15

- 3" 105 26' Madison Avenue, 10th Floor New York, NY 10016 212.840.0060

DEFINITION

L5.17

7.

MEP ENGINEERING14 BR+A

NOT IN CONTRACT (N.I.C.) P2 P1

6.

27' - 0"

5

CLIENT NAN FUNG

6' - 6"

4

5.

PROJECT TEAM:

5' - 7"

3

4.

27' - 0"

2

3.

27' - 0"

1

1. 2.

54 W 21st Street, NEW YORK NY, 10010 857.300.2610 | SGA-ARCH.COM

2' - 2"

3.

REFER TO GENERAL CONDITIONS, SPECIFICATIONS AND SCHEDULES FOR ALL WORK. DRAWINGS LISTED UNDER THE 'DRAWING LIST' MUST BE READ IN CONJUNCTION WITH THIS DRAWING FOR COMPLETE INFORMATION. CONFIRM WITH ARCHITECT THAT THESE DRAWINGS ARE THE MOST CURRENT ISSUE BEFORE BEGINNING LAYOUT AND CONSTRUCTION. CONTRACTOR MUST GIVE ARCHITECT (4) WORKING DAYS NOTICE TO REVIEW PARTITIONS, FLOOR OUTLETS AND FURNITURE PANEL SYSTEM LAYOUT AT 'CHALK LINE' STAGE. TRACK AND STUD WORK SHALL NOT BEGIN BEFORE ARCHITECT HAS REVIEWED ENTIRE LAYOUT. ALL GRID DIMENSIONS ARE SHOWN FOR REFERENCE ONLY AND CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND COORDINATE ANY DISCREPANCIES WITH ARCHITECT / ENGINEER OF RECORD. INTERIOR DETAILS ARE KEYED TO THE PLANS AT TYPICAL LOCATIONS. THE DETAILS APPLY TO ALL LOCATIONS THAT ARE NOT KEYED - IN AN AREA OF THE SAME CONSTRUCTION AND SCOPE OF WORK. THE CONTRACTOR AND SUBCONTRACTORS ARE RESPONSIBLE TO COORDINATE THE LOCATION OF ALL TYPICAL DETAILS AND INSTALL THE WORK INDICATED. IF DISCREPANCIES EXIST OR QUALIFICATION IS REQUIRED THE CONTRACTOR IS TO NOTIFY THE ARCHITECT TO OBTAIN CLARIFICATION. ALL VERTICAL AND HORIZONTAL DUCTS, PIPE, CONDUIT, ETC. (WHETHER SHOWN OR NOT) IN FINISHED ROOMS SHALL BE FURRED IN AND FINISHED TO MATCH ADJACENT FINISHED SURFACES 11WALL OR CEILING RATINGS. 12 13 AND ANY REQUIRED THROUGHOUT AREA OF WORK, PATCH/REPAIR AND PREPARE WALLS TO RECEIVE NEW FINISHES PARTITION DIMENSIONS ARE TO THE FINISH FACE OF WALL, UNLESS NOTED OTHERWISE ALL SLABS 26' - 3"SPOT ELEVATIONS AT EXISTING 26' - 3" MUST BE VERIFIED IN FIELD AND 26' NEW - 3" SLAB HEIGHTS MUST BE COORDINATED WITH EXISTING HEIGHTS AND BE ADJUSTED ACCORDINGLY.

25' - 10"

1. 2.


HMC Retail Project Type: Location: Size: +/- 8,600 sqft

RETAIL

Retail project next to the existing powerhouse. Design intention is to design a building that responds to the existing electrical tower and to have a connection between the two buildings.

Retail

Professional Experience

Retail

Professional Experience

Responsibility: Presented the conceptual idea and designed the store


Retail

Professional Experience

Retail

Professional Experience


Mass Timber Project Type: Life-Science Location: Long Island City, NY Size: +/- 510,000 sqft

LAB / OFFICE

Two buildings next to each other at the waterfront to create a highly sustainable architecture in-class lab & life science using mass timber.

Life-Science / Office

Professional Experience Professional Experience

Life-Science / Office

Professional Experience

Responsibility: Conceptual design phase. Provide ideas for the ground-level program study.


Life-Science / Office

Professional Experience

+0.5’

ELEVATION & GROUND FLOOR PROGRAM +0’ = 9’ NAVD88, 15

Life-Science / Office

+7’

Professional Experience

Overall Buildings

Mass Timber

Ground Floor Program Diagram

Mass Timber

+0.5’

+7’

+3’

+0’

PAPPAS WAY


Heto Ray Project Type: Life-Science Location: Puerto Rico Size: +/- 345,700 sqft

HOSPITALITY / RESIDENTIAL

Existing office building conversion to hotel and condominiums that include a restaurant, conference center, spa, fitness center, rooftop pool, and sundeck.

Hotel / Residential

Professional Experience

Hotel / Residential

Professional Experience

Responsibility: Core and interior floor plan coordination and model updates to existing conditions


Life-Science Hotel / Residential / Office

Professional Experience Professional Experience

Hotel / Residential

Professional Experience

Hotel entry

Heto Ray

Oerall Building

Heto Ray


Pool Pavilion & Interior renovation project in East Hampton, NY. The pavilion is a ground-up project for a summer pool house, next to the main house, connected by deck. Interior renovation in the main house has been completed. The placement of the plants was planned in collaboration with a landscape designer to connect the deck, pavilion, and main house.

Pavilion & Fireplace, NY

Site Plan

Professional Experience

Pavilion & Fireplace, NY

Professional Experience

POOL HOUSE PAVILION


Pavilion & Fireplace, NY

Professional Experience

Pavilion & Fireplace, NY

Professional Experience

Floor Plan


Carmen Lenzi Architect 35 Bond Street New York, NY 10012 t. 212 254.1310 f. 212 254.1311

DRAIN SHOWER DRAIN TO EXIST PIPING AC COMPRESSOR; PROVIDE ADEQUATE VENTILATION

BBQ BUILT-IN BBQ W/ CAST CONCRETE COUNTER & STORAGE BELOW

DECK 105

DN

2'-0"

POOL PAVILLION

WOOD GATE

21 BULL PATH EAST HAMPTON, NY 11937

DN

10 1/4"

11'-0"

9'-5"

PORCELAIN TILE DECKING

5 1/2" 7"

L1

Project

STRAIN RESIDENCE

IPE DECKING & STEPS

L1

2'-0"

CLA

RAILING

UP TO HOUSE

ER

Proposed 3D Rendering of

L6

NEW H/C WATER PIPING, CONNECT TOI EXIST EXTERIOR SHOWER. SEE SITE PLAN

5 A300

A200

the Fireplace Surround & Bench & Details

3D Rendering Image of Interior

Construction Plan & E

3

4 A300

6'-10"

Consultant STOR

3/4"TH NEW BACK PANEL

SLOPE TO DRAIN MIN. 1/4"/FT

2'-10"

EXIST GWB W/ JBEAD

Revisions

3/4"TH NEW BACK PANEL

CAULK JOINT, BLACK

STEEL SURROUND SEE DETAIL 6

NEW STONE BENCH

L6 L7

6

WALL MOUNTED EXTERIOR LED LIGHT FIXTURE

Ful Size Detail of Stone Edge

Drawing

Scale: Half Actual Size

POST MOUNTED EXTERIOR LED LIGHT FIXTURE EXIST BENCH FRAMING. PATCH AND PREP AS REQ'D FOR NEW SLATE SLAB ATTACHMENT

EXISTING FLOOR TO REMAIN

FLOOR MOUNTED EXTERIOR LED UP-LIGHT FIXTURE

DETAIL #6

ABOVE FINISH FLOOR

EXIST WALL FRAMING & GWB, VIF

NEW PINE FLOOR TO MATCH EXIST STAIN AND FINISH

BLACK, PAINTED REVEAL BETWEEN FLOOR & BENCH

5

NEW GWB INFILL & J-BEAD AT PERIMETER OF SLATE SURROUND.

of

3

+/- 9'-9 1/2" VIF

1" 2'-1"

2"

1"TH. FRAME

REMOVE EXIST STONE FIREPLACE SURROUND TRIM

3/4" REVEAL (VIF WITH FLOOR LEVEL)

Revisions ART FBO

EXIST FIREBOX

3/4" STEEL SURROUND SEE DTLS #4,5,6

ALIGN

1/2"TH CEMENT BOARD SUBSTRATE

NEW PINE FLOOR TO MATCH EXIST STAIN AND FINISH EXIST BENCH FRAMING. REINFORCE, PATCH AND PREP AS REQ'D FOR NEW SLATE SLAB ATTACHMENT

Pavilion Exterior Image

STONE BENCH. SEE DTL #4 & 5

5 3

Section Through Bench Scale: 1 1/2" = 1'-0"

REPAINT WALL SURROUNDING FIREPLACE TO MATCH EXIST WALL

Section Through Fireplace & Bench INSTALL NEW PINE FLOOR @ AREA OF EXIST. FLOOR. FINISH TO MATCH EXIST.

Scale: 1 1/2" = 1'-0"

4 TIGHT SEAM CUT SLAB REMOVE EXIST STONE FLOOR TILES

2

ConstructionEXISTING - Key PlanWINDOW & Elevation Scale: 1/2" = 1'-0"

MOUNT TV & BRACKET ALIGN

VIF. (+/- 20")

EXIST WALL FRAMING & GWB, VIF

1

Demo - Key Plan & Elevation Scale: 1/4" = 1'-0"

NEW PTD WOOD CABINET W/ MORTISED EDGE PULL

Section Through Shelf & Bench Scale: 1 1/2" = 1'-0"

Drawing

A-304.00

Plan & FIREPLACE Section Detail ELEVATION & DETAILS +/- 9'-9 1/2" VIF FOR 11/4/20 CONSTRUCTION

+/- 6'-9" VIF

5

ART FBO

Key Plan

STONE BENCH. SEE DTL #4 & 5

TIGHT SEAM CUT SLAB

REVEAL BETWEEN FLOOR & BENCH

3

TOP 1/4" STEEL SURROUND SEE DTLS #4,5,6

SCRAPE & REPAINT FIREBRICK W/ HEAT RESISTANT PAINT

BLACK, PAINTED REVEAL BETWEEN FLOOR & BENCH

INFILL AFTER REMOVAL OF LEDGE REINFORCE EXIST BENCH MOUNT TV & BRACKET AS REQUIRED

REPAINT WALL SURROUNDING FIREPLACE TO MATCH EXIST WALL REMOVE EXIST STONE

NEW BLACK STONE BENCHBRICK. W/ MITERED EXIST FIRE EDGE AT CORNER SCRAPE, SAND AND REAPAINT WITH MATTE BLACK HEAT RESISTANT FIREBRICK PAINT

EXIST BENCH FRAMING. PATCH AND PREP AS REQ'D FOR NEW SLATE SLAB ATTACHMENT

5'-10 1/4" +/-

VIF

TO MATCH EXIST. COLORBM 'SIMPLY WHITE' FLAT

REMOVE EXIST WOOD BASE & GWB BENCH FINISH

EXIST. FLOOR TO REMAIN

EXISTING FLOOR TO REMAIN

WOOD STORAGE

EXIST BENCH FRAMING. PATCH AND PREP AS REQ'D FOR NEW SLATE SLAB ATTACHMENT

VIF (16'-7" +/-)

Consultant

STONE BENCH. SEE DTL #4 & 5

Scale: 1 1/2" = 1'-0" +/- 6'-9" VIF

REMOVABLE 3/4"TH. TV MOUNTING PANEL

MORTISED EDGE PULL Scale: 1 1/2" =W/ 1'-0"

EXIST WALL FRAMING & GWB, VIF

Pavilion Interior Image

Scale: 1 1/2" = 1'-0"

3/4"TH. DOOR REPAINT WALL & SHELVING

Enlarged Firelace Plan NEW PTD WOOD CABINET

TIGHT SEAM CUT SLAB

VIF. (+/- 20")

NEW BLACK STONE BENCH W/ MITERED EDGE AT CORNER

1"

1" 5"

REAPAINT WITH MATTE BLACK HEAT RESISTANT FIREBRICK PAINT

NEW BLACK STONE BENCH W/ MITERED EDGE AT CORNER

EXISTING FLOOR TO REMAIN

STEEL SURROUND SEE DETAIL 6

1'-4"

VIF

5'-10 1/4" +/-

ALIGN

VIF

1" 2'-1"

1/4" STONE BENCH. SEE DTL #4 & 5

Section Through Fireplace & Bench

EXIST FIRE BRICK.EXIST WOOD FLOOR MOUNT TV & BRACKET SCRAPE, SAND AND

1/4" STEEL SURROUND SEE DTLS #4,5,6

Sheet4

Section Through Shelf & Bench

3/4"TH. TOP ART

FBO SEE STEEL SURROUND DETAIL 6

EXISTING WINDOW

VIF (+/- 14")

AFF

3/4"

VERIFY IN FIELD

Pavilion & Fireplace, NY

VIF

NEW STONE BENCH

REPAINT WALL SURROUNDING FIREPLACE TO MATCH EXIST WALL

FILING SET 4/30/2021

ABBREVIATIONS

Scale: 1 1/2" = 1'-0"

Key Plan

A101.00

PROP. PLANS ROOF, CONST., ELEC.

Enlarged Firelace Plan

1/2"TH CEMENT BOARD SUBSTRATE

4

1'-2"

L5

3

4 EXIST BENCH REINFORCE AS REQUIRED

NEW GWB INFILL & J-BEAD AT PERIMETER OF SLATE SURROUND.

NEW BLACK STONE BENCH W/ MITERED EDGE AT CORNER

CEILNG MOUNTED LED PENDANT LIGHT

L4

INFILL AFTER REMOVAL OF LEDGE

CABINET FRAME ABOVE

EXIST FIRE BRICK. SCRAPE, SAND AND REAPAINT WITH MATTE BLACK HEAT RESISTANT FIREBRICK PAINT

INTERIOR RENOVATION

5'-10 1/4"

+/- 4" - VIF

RECESSED ABOVE CAB LED LIGHT STRIP

L3

EXIST WALL FRAMING & GWB, VIF

ALIGHN

21 BULL PATH EXIST WOOD FLOOR EAST HAMPTON, NY 11937

1"TH. FRAME

2"

CEILING MOUNTED LED LIGHT

1/4"

FIREBRICK

1/4" TH STEEL SURROUND BLACKENED FINISH W/ SQUARE EDGE

RECESSED LED WET LOCATION STEP LIGHT

DETAIL #6

AT PERIMETER OF SLATE SURROUND.

ROOF PLAN EXIST

1 Scale: 1/4" = 1'-0" Pavilion Construction Plan

Scale: 1/4" = 1'-0"

Scale: 1 1/2" = 1'-0"

5'-10 1/4"

L2

CONSTRUCTION PLAN

EXIST EXTENSION WALL, VIF

3/4"TH. DOOR

Enlarged Firelace Plan

3

4

7'-0 1/4"

L1

2

SHELF CLOSING DOOR HINGES

VIF

LIGHT FIXTURE SCHEDULE (ALL FIXTURES FURNISHED BY OWNER)

DETAIL #6

MIN. CLEARANCE FROM STRUCTURE & EDGE OF CLEARING & J-BEAD NEW GWB INFILL GWB, VIF

NEW STONE BENCH STRAIN RESIDENCE

WOOD STORAGE RE-MOUNT EXIST TV & BRACKET

1"

RECESSED FLUSH MOUNTED FLOOR OUTLET DIMMER SWITCH. COORDINATE MODEL# W/ EACH FIXTURE. LUTRON- DIVA SCREWLESS PLATE- WHITE

1/4" NEW BLACK STEEL SURROUND FIREPLACE FLUE & CAP @ TOP & SIDES, SEE DETAIL #62'-0" ABOVE ROOF, 10' MIN. EXIST WALL FRAMING &

SURROUND. TAPE, SKIM & PAINT TO MATCH ADJOINGING GWB WALL

3/4"TH. TV MOUNTING PANEL Consultant

5"

5 NEW GWB PATCH & J-BEAD A300 AT PERIMETER OF STEEL

EXIST WOOD FLOOR

Scale: Half Actual Size

VIF

4

6

REMOVABLE 3/4"TH. TV MOUNTING PANEL

2'-3 1/4"

A200

1/4"

4 A300

EXTERIOR GRADE COVERED OUTLET

Project REMOVABLE

3/4"TH. TOP

Ful Size Detail of Stone Edge

5'-10 1/4" +/-

BLOCKING AS REQ'D

NEW DUPLEX OUTLET E

NEW STONE BENCH

VENEER OAK CABINET INTERIOR

5'-10 1/4"

EXIST GWB WALL 3'-1"

Seal

1'-2"

18'-2 1/4"

CABINET FRAME ABOVE

NEW STONE BENCH

Scale: Half Actual Size

VIF

6'-0"

Ful Size Detail of Stone Edge

ALIGHN

CABINET FRAME ABOVE

CAULK JOINT, BLACK

+/- 4" - VIF

21 BULL PATH EAST HAMPTON, NY 11937

7'-0 1/4"

1/4"

10 1/4"

CAULK JOINT, BLACK

+/- 4" - VIF

ALIGHN

INTERIOR RENOVATION

EXIST EXTENSION WALL, VIF

2'-3 1/4"

EQ EQ EQ

1/4" TH STEEL SURROUND BLACKENED NEW STONEFINISH BENCH W/ SQUARE EDGE

1'-8"

ELECTRICAL LEGEND

Professional Experience

NOXIDE ED BY

5'-8"

EXIST FIREBRICK

EXIST FIREBRICK

STRAIN RESIDENCE

OPEN SPACE FOR WIRING SHELF CLOSING DOOR HINGES

RE-MOUNT EXIST TV & BRACKET

SHELF CLOSING DOOR HINGES

ADJOINGING GWB WALL

1/4" TH STEEL SURROUND BLACKENED FINISH W/ SQUARE EDGE

6

WITH

UTRON' SH,

EQ

1/4" NEW BLACK STEEL SURROUNDSURROUND. TAPE, SKIM & PAINT TO MATCH @ TOP & SIDES, SEE DETAIL #6

1'-2"

10 1/4"

NEW GWB PATCH & J-BEAD AT PERIMETER OF STEEL

BLOCKING AS REQ'D

FLASHING AT PERIMETER OF CHIMEY SEE ROOF NEWDETAILS. GWB PATCH & J-BEAD AT PERIMETER OF STEEL SURROUND. TAPE, SKIM & PAINT TO MATCH ADJOINGING GWB WALL

1'-3 1/2"

1'-3 1/2"

PREFAB FIREPLACE UNIT

ED

NLESS

EXIST GWB WALL

carmen lenzi, architect 35 Bond Street New York, NY 10012 t. 212 254.1300 f. 212 254.1311

Project REMOVABLE 3/4"TH. TV MOUNTING PANEL

"

EW GHT

1 A300

PORCELAIN TILE FLOOR PAVERS

EXIST FIREBRICK & ASH GRILLE, REPAINTED 1/4" NEW BLACK STEEL SURROUND 3/4"TH NEW BACK PANEL @ TOP & SIDES, SEE DETAIL #6

BLOCKING AS REQ'D VENEER OAK CABINET INTERIOR

'-0

AND D BEFORE

EXIST GWB WALL 1/4"

cla

EXIST GWB W/ JBEAD VENEER OAK CABINET INTERIOR

1/4"

10

ECTRICIAN CODES. ANGE FOR S TO

1 A300

OPEN SPACE FOR WIRING

carmen lenzi, architect 35 Bond Street New York, NY 10012 t. 212 254.1300 f. 212 254.1311

WALLS BELOW

1/4"

FLEETWOOD CASEMENT WINDOWS BY TWIN FORKS

C L WINDOW

9'-8"

1"

EXIST FIREBRICK & ASH GRILLE, REPAINTED

LOUNGE 100

REPLACE

Mainchouse Fireplace Image la

1/4"

BUILT-UP ROOF MEMBRANE ON TAPERED INSULATION

1'-4"

EQ

2

STOR

A200

28'-10"

DN TO LAWN

EXIST FIREBRICK & ASH GRILLE, REPAINTED INTERNAL ROOF DRAIN

VIF

FLEETWOOD MULTI-SLIDE DOOR SYSTEM WITH CENTOR SCREEN BY TWIN FORKS

2 A300

32'-0"

L2

CHANGING ROOM 102

5'-9"

INSULATED ROOF DRAIN PIPING

STONE BENCH. SEE DTL #4 & 5

3/4" REVEAL (VIF WITH FLOOR LEVEL)

VIF (16'-7" +/-)

Sheet 1

Pavilion & Fireplace, NY

2 A300

C L ROOM

Professional Experience

3'-2"

7'-0 1/4"

2'-10"

A200

DINING 101

ALUM CAP & FLASHING AT PERIMETER. TYP SEE ROOF DETAILS.

1'-2"

STORAGE 103

VIF

L2

3

6 1/2"

1'-3 1/2" C L ROOM

L3

10'-9"

L7

E

OPEN SHOWER BELOW

PORCELAIN TILE FLOOR PAVERS

7'-0"

L7

3 A300

16'-6"

L5

NG

OUTDOOR SHOWER 104

3'-1 1/2"

L7

7'-5"

3 A300

3'-2"

L7

L7

7'-0"

L7

of 1


Pavilion & Fireplace, NY

Professional Experience

Pavilion & Fireplace, NY

Professional Experience


- Exterior/Landscape design - Bathroom design - Facade design

HOUSE IN CAMBRIDGE

Residential project; New construction house in MA,

House in Cambridge, MA

Professional Experience

House in Cambridge, MA

Professional Experience

completed in 2020.


Corner Windows

at Interior & Exterior

Professional Experience

House in Cambridge, MA

Overall House

Completion Photography of

Location: Cambridge, MA Design in charge : Facade & interior design Design for two adjacent single family speculative homes on a single site. Many of the significant windows are placed in the corners of each room to maximize light and views while maintaining privacy, especially from the adjacent home getting built at the same time. For the back house, the floor plans of the front design was simply rotated and mirrored resulting in an efficient design and construction process, while allowing the house to respond to the subtle differences in site

House in Cambridge, MA

Professional Experience

conditions.


House in Cambridge, MA

Professional Experience

House in Cambridge, MA

Professional Experience


Completion Photography of tMaster Bathroom

of the Master Bathroom

Proposed Presentation

Master Bathroom Opt. 1

Master Bathroom-Oprion. 1

92 Howard- Bathroom and Kitchen Interior

Location: Cambridge, MA Design in charge: Material/finish design in bathrooms in the house

Interior Elevation 2

Interior Elevation 3

Interior Elevation 4

Interior Elevation 5

Bathroom design for a house in MA. Studied design for materials and finishes. I proposed the designs and created the presentation for several bathrooms in a house. This is the master bathroom of one of them. It was made with a sense of luxury while

1/4”=1’-0” 3FL Floor Plan Master Bathroom-Option. 1

92 Howard- Bathroom and Kitchen Interior

House in Cambridge, MA

the entire house.

Professional Experience

House in Cambridge, MA

Professional Experience

matching the materials and colors of


- Alcove Detail Design & Kitchen

INTERIOR RENOVATION

Design in New York - Loft in New York


EXIST. CONCRETE & BRICK

Alcove Details

Carmen Lenzi Architect 35 Bond Street New York, NY 10012 t. 212 254.1310 carmen@clarchitect.net

CABINET ABOVE

FLASHING & SEALANT AS REQ'D

EXIST SOFFITS TO REMAIN CEMENT BOARD W/ ALUMINUM FASCIA TO MATCH SKYCOVE STACKABLE SHIMS THREAD ROD

3"

KITCHEN COUNTER TOP

2 7/8"

ALIGN

WOOD VENEER MILLWORK EXIST. WINDOW VIF

7'-8"

BOOK SHELF

NEW SKYCOVE WINDOW IN EXIST OPENING

8'-4"

BOOK SHELF

EXIST. DOOR

INTERIOR OPENING

SOFFIT ABOVE

+/- 7'-10" VIF

7'-11"

9'-10"

in the Constructuin Documentation Set

& Exterior Elevation in the Construction Document Set

Proposed Modeling Image of the Kitchen Mateial

CLA STONE BACKSPLASH

CUSHION, FBO

NEW KITCHEN CABINETRY

CUSHION, FBO

PLYWD BENCH TOP

2 7/8"

MACHINE BOLT

EXIST. STEP.

WOOD VENEER BENCH AND MILLWORK AROUND EXIST. WINDOW

FLASHING & SEALANT AS REQ'D

WOOD PANEL & BENCH W/ CUSHION

4

STACKABLE SHIMS

CEMENT BOARD W/ ALUMINUM FASCIA TO MATCH SKYCOVE

NTERIOR EAST ELEVATION

Project

LAG BOLT

2 7/8"

GINOR RESIDENC EXIST. DOOR FRAME & HANDLE

3"

1'-7 3/4"

732-734 WEST END AVE, NEW YORK, NY 10025

Scale: 1/2" = 1'-0"

SKYCOVE PLAN DETAIL

2

Scale: 1 1/2" = 1'-0"

STONE BACKSPLASH EXIST. CONCRETE & BRICK EXTERIOR WALL

EXIST. CABINET ABOVE

CONCRETE & AT BRICK EXIST. STEEL LINTEL BRICK OPENING FLASHING & SEALANT AS FLASHING & SEALANT REQ'D AS REQ'D

EXIST GWB SOFFIT

Consultant

BLOCKING TO SCREW THE BOLT CEMENT BOARD W/

ALUMINUM FASCIA TO MATCH SKYCOVE EXIST. WINDOW

EXIST. WINDOW

EXIST SOFFITS TO REMAIN

ALIGN

STACKABLE SHIMS

GWB TO ENCLOSE BRACKET & BLOCKING

THREAD ROD

3"

KITCHEN COUNTER TOP

ALIGN 2 7/8"

WALL BEYOND

FLASHING & SEALANT AS EXIST. REQ'D

EXIST ALUM GRILLE TO REMAIN

WOOD PANEL & BENCH CUSHION OPEN W/ TO BASEMENT

NTERIOR EAST ELEVATION

EXTERIOR WEST ELEVATION 4 3 Alcoves Interior Elevation Facing Scale: 1/2" =1/2" 1'-0" Scale: = 1'-0"

SOFFIT

7'-10" +/- FINISH FLOOR TO SOFF

STACKABLE

NEW PORCELAIN SHIMS PAVERS ON EXIST. CONC.

2 7/8"

1'-7 3/4"

EXIST. DOOR FRAME & HANDLE

3"

1

Drawing

A302

INTERIOR DETAILS SKYCOVE

SKYCOVE SECTIONSKYCOVE DETAIL PLAN DETAIL

Scale: 1 1/2" = 1'-0" 2 Alcove Window Section Details Scale: 1 1/2" = 1'-0"

Interior Renovation

MACHINE BOLT BOLT PTD, FURN LAG GRADE PLYWOOD BENCH TOP

EXIST. BLUESTONE PAVER

CONCRETE & BRICK

EXIST. STEP.

INTERIOR OPENING

6'-5 1/2" FLASHING & SEALANT AS REQ'D

BENCH

BLOCKING AS NECESSARY

CEMENT BOARD W/ ALUMINUM FASCIA TO MATCH SKYCOVE

WOOD VENEER BENCH AND MILLWORK AROUND EXIST. WINDOW

Revisions

Professional Experience

EXIST. DECK

EXIST. STONE LEDGE

SOFFIT ABOVE

PLYWD BENCH TOP

MATCH SKYCOVE VIF

1'-4 1/2"

EXIST. WD PARTITION

2 7/8"

CUSHION, FBO

EXIST. WD PLANTER BOX

PTD, FURN GRADE PLYWOOD BENCH TOP

NEW ALUM. KITCHEN CABINETRY FINISHING, TO

EXIST. RAILING EXIST. DOOR

EXIST. STONE LEDGE

Interior Renovation

Professional Experience

7'-8"

EXIST. WINDOW

SKYCOVE

CUSHION, FBO

NEW SKYCOVE WINDOW IN EXIST OPENING

6 1/8" +/-

BOOK SHELF

EXIST. DOOR

8'-4"

BOOK SHELF

EXIST. WD PERGOLA

+/- 7'-11" VIF

7'-11"

9'-10"

EXIST. WINDOW VIF

INTERIOR OPENING

7'-2 1/2"

EXIST. BRICK WALL

FRAME SIZE

EXIST. WD PARTITION

WOOD VENEER MILLWORK

SKYCOVE UNIT

FOR CONSTRUCTION 5/14/21 Sheet

EXIST. CONCRETE & BRICK EXTERIOR WALL


Re-use the castle Ripafratta Pisa, Italy

Concept and Design Inspiration

2019 International competition

Concept; Kintsugi Celebrate the history of the Castle using the concept of Kintsugi (Cravatta d’oro), a traditional

It is to transform a ruined castle in

Japanese technique which not only repairs but

Italy in a place for to the climbing

highlights the cracks and imperfections, as an

activity, for events and conferences,

event in the life of that object. Instead of hiding

a public park connected with the

or disguising the flawed or the imperfect from the

hiking system of the surrounding

past, Kintsugi embraces it to enrich the present and

mountains. It requres the

carries it into the future.

preservation of the historial elements of the fortress through the history of two cities, Pisa and Lucca, as well as its material use, and considering to bring hikers and tourists to revive the castle through the famous hiking trail and

The three main historic structures in need of repair, the fortress, Niccolai tower, and the Centino tower will be linked conceptually and visually using translucent “glue”, a material combination of locally sourced glass bricks and translucent concrete, to fill in and preserve the cracks and gaps that have developed over time.

landscape. Same material and technique are applied to cap the tops of three towers, providing necessary

RENOVATION OF THE CASTLE

reinforcing, protection from the weather, and transforming the entire tower into a climbing surface. In both the fortress and the towers, the Kintsugi “glue” reflects the sunlight during the day and at night transmits the light from within. The beacon of light becomes the symbol and marker for the CAI trails while honoring the rich history of the city and the region.

Landscape; Node-path-district Connect the significant nodes within the site and the region using glass brick as signage and wayfinding

Pisa

Lucca city

landscape. New furniture elements such as outdoor using glass brick as the primary material. Experienced together with the fortress and the towers, material continuity unifies the isolated nodes into a mesh like network, celebrating the Castle and its territory.

Professional Experience

benches and information displays will also be built

Competition of the Renovation of the Castle

reinforce the pedestrian trails and the terraced

CAVINA

Competition of the Renovation of the Castle

concept, glass bricks will be used to repair and

DI

Professional Experience

device. On the ground, in keeping with the Kintsugi


Master Plan and Elevation

of the Fortress and Towers

Professional Experience

Competition of the Renovation of the Castle

Material Details and Landscape Plan

Niccolai Tower Plan Recepion Relaxing area Exhibition room Dressing room Restaurant Bar Multi-purpose hall Shop

Lucca Gate 0.00

Climbing activity Garden

+2.95

Restroom -4.00

Parking -3.20

0.00

-2.40

Pisa Gate +2.95

Catwalk Inside Hall

Roof +8.15

Butress between fortress wall & new glass wall

Kintsugi restoration

Glass bench

Glass block

0 6 12

Competition of the Renovation of the Castle

Professional Experience

Programmatically and structurally reinforce the fortress wall by inserting a glass brick curvilinear wall inside the fortress.

24

48(ft)

The wavy wall runs approximately parallel to the historic masonry wall but undulates for structural stability, connecting to the historic wall along the way like a buttress. The interstitial space between the old and the new wall fluctuate in width and

Centino Tower North Elevation

Niccolai Tower West Elevation

Niccolai Tower Plan

Fortress Plan

0 2.5 5

10

20(m)

height, housing the programmatic elements at various elevations around the fortress. Respecting the material history of the fortress, the glass block adds a new layer on top of its deep legacy (limestone, brick, stone), aimed not to complete the project but serve as a new foundation for the future.

Kintsugi restoration

Glass bench

Glass block

Centino Tower Fortress Lucca

Niccolai Tower Pisa


Graduation work in M. Archi,

MEMORIAL MUSEUM

Kyoto Instutute of Technology Honorable mentioned as a presenter

OF CANAL In architecture space is time. In architecture light is defines form.

in public exhibition by juries, Adam Caruso (Caruso St John Architects) and Ling Hao (Linghao Architects)

Can space be a counterpoint that connects what we see and what it exists? This is a spatial experiment to integrate imagery and entity. Shadow/light that changes as time passes or as you walk introduces time-scale into the sequence space.

In architecture the route surprises. In architecture rough materials convey elegance. In architecture the function is being there. In architecture the shadow reveals the beauty.

Memorial Museum of Canal

Academic Year

Memorial Museum of Canal

Academic Year

-Carlos Castanheira


Site Description

Keage-Incline is the longest funicular railway track in the world with a total length of 582m. This ruins was built to extract water underneath and transpport ships from Lake Biwa to Kyoto city, which was about 36

Keage-Incline History

Keage Incline, The History and Site Description

meters in elevation.

Lake Biwa

Water flow

Incline at the time of construction

As the capital moved from Kyoto to Tokyo in 1882, the industry in Kyoto suddenly declined and the population rapidly decreased. In order to revitalize Kyoto, the inundation project was planned to promote

Canal

industries. Governor of Kyoto paid attention to Lake Biwa, which is close to Kyoto city. By excavating the canal, it opens a boat connection between Lake Biwa and the river in the city, which is used for power (turbine), irrigation, and fire prevention for restoration of Kyoto. Today the railway is mainly a tourist attraction but it is used for water source and hydroelectric power

Kyoto City

Keage Pier

generator for approximately 1.47 million citizens.

Canal measured map

Site

Kage-Incline was an important part of industrializing Kyoto. I designed a memorial museum that conveys significance of Keage Incline and how

Keage Pier

Keage-Incline

Site Section

Memorial Museum of Canal

Nanzenji Pier

Nejiri-manpo Tunnel

Academic Year

Memorial Museum of Canal

Academic Year

it changed Kyoto.


Memorial Museum of Canal

Academic Year

Memorial Museum of Canal

Academic Year

forming the image of the environment

Elements at the site,

collaged elements

Conceptural image of


position of the water that flew from Biwa lake

Current states diagram, showing hte landscape and the

1. Foyer

6. Dressing room

2. Exhibition passage

7. Storage

3. Reference room

8. Office

4. AV room

9. Hall

5. Restroom

10. Machine room 11. Service entrance

3FL Plan Incline level

10 11

9

2FL Plan

6 7 8 3

A

5

A'

4

1

8

B'

5

0 6 12

24

1FL Plan

48(ft) Incline

0 2.5 5

10

20(m)

Memorial Museum of Canal

2

Academic Year

Memorial Museum of Canal

Academic Year

B


Memorial Museum of Canal

Academic Year

Memorial Museum of Canal

Academic Year

Lighting View at Night Composition Diagram


Memorial Museum of Canal

Academic Year

Memorial Museum of Canal

Academic Year


School project on bachelor 2nd year. The dormitory for the students at

FLOATING LANDSCAPE

the college in Hyogo, Japan.

DORMITORY

100 selection of 2013 Rookies of

AWARD Architecture in Japan (Jury: Ryue Nishizawa, Jun Igarashi, Sei Takeyama, Kaoru

Floating Landscape Dormitory

Academic Year

Floating Landscape Dormitory

Academic Year

Suehiro and Hirokazu Toki)


A-A' Section

Floating Landscape Dormitory

Academic Year

Floating Landscape Dormitory

Academic Year

Roof parspective image and Section


Floating Landscape Dormitory

Academic Year

Floating Landscape Dormitory

Academic Year

Private room interior image


At Daytime and Night

Common Room Perspective

1. Foyer 2. Commaon space 3. Room 4. Bath room 5. Machine room

A

GL-5800

2

GL-5600

3

1 GL-5300

5

A' 0 6 12 24 0 2.5 5

Plan

48(ft) 10

20(m)

Floating Landscape Dormitory

GL-6200 GL-5600

Academic Year

Floating Landscape Dormitory

Academic Year

4


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.