Temporary Bridges Filling the Gaps in Your Layout – by Jerry Boudreaux Number 9822 rolls onto the temporary bridge across Fossil Creek on the Pasquinel Division of the AT&SF. Jerry was spending most of his time building benchwork and laying track – there wasn’t enough time left over for building detailed bridges. These temporary bridges are his answer, until later . . .
Reader Feedback (click here)
Figure 1 Page 80 • Issue 11-12• Dec 2011
Temporary Bridges, page 1
Tell a friend ...
Contents
Index