MIAW 2014 - WS·A - Lost & Found presentation

Page 1

LOST & FOUND An urban block

on Corso XXII Marzo

WS 路 A

miaw2014


1903-1995 corso XXII Marzo - via Fiamma


1981-1995 corso XXII Marzo - via Calvi


A brief History of Urban (RE)generation: what can we learn from XXII Marzo area? 1884-2014

2014 - RI-Formare Milano: strong 1884 - Piano Beruto 1903 - Developer Campanini builds the XXII Marzo block

1975 - Piano di edilizia economica e popolare:

emphasis on regeneration of

special concern on urban regeneration of

abandoned and neglected

abandoned and neglected areas

urban areas


via Fiamma

corso XXII Marzo

via Calvi


A brief History of Urban (RE)generation: what can we learn from XXII Marzo area? ‘60-’90


If you walk through this entrance the facades at via Calvi and via Fiamma will never look the same to you.


Time-machine: Italy? England? ‘70? ‘80? Periphery? City centre? Hard to say.



Complexities and contradictions: a traditional milanese typology is re-adopted via the english brutalistic examples



Here you’ll find the schizophrenic complexities and challenging potentials of the modern city.


You will find pots with flowers in left-over corners, washing racks, benches and chairs, but also little statues of the Holy Virgin placed in the niches for the gas-meter next to the front door: the sacred meets the profane.



Double or nothing


FIVE In the Air, At the Gate, Underground, On the Skin, On the Stage

PROJECTS


Something in the air, that radically changes the atmosphere of the courtyard

IN THE AIR

Light, temporary elements fill up the space with electric energy enabling a festive atmosphere to happen, at least until the dawn.



A clear cut that redefines the transition between public space and community courtyard

AT THE GATE

Public space merges into the courtyard through a new portico



Sliding panels made of different materials define the workshops rooms

Cafeteria Workshopdelightful Workshop Erasure Sauna as a tool to create Gym conditions topoolinhabit abandoned spaces Changing rooms Swimming Parking

UNDERGROUND Single 2.5 x 5m

Double 5 x 5m

Parking

n

Triple 7.5 x 5m

Su

un

n

Su

un

Sliding panels made of different materials define the workshops rooms

Single 2.5 x 5m

Double 5 x 5m

mm

Modular elements allow simple and effective variations of the space

m

rooms g

Su

rkshop

er

mm

Su

er Su n

Sliding panels made of different materials define the workshops rooms

Triple 7.5 x 5m

S ter Win

Ground floor: community spaces

How to transform a PARKING LOT into a HABITABLE SPACE? How to illuminate and ventilate the different floors in order them useful. As a response to these questions is that it had been decided to cut the floors so the light can penetra the last plane generating a new landscape that goes deep and bring light and greenery to the program allocated in th ground building. The programme consists in a Cafeteria in the ground level connected with the public square inside the housing buildi the floors below some renting workshops spaces, sports facilities with a swimming pool, gym, sauna, and parking. And top floor a private playground for the habitants of the social housing.

Single 2.5 x 5m

How to transform a PARKING LOT into a HABITABLE SPACE? How to illuminate and ventilate the different floors in order to make them useful. As a response to these questions is that it had been decided to cut the floors so the light can penetrate until the last plane generating a new landscape that goes deep and bring light and greenery to the program allocated in the underground building. The programme consists in a Cafeteria in the ground level connected with the public square inside the housing building. In the floors below some renting workshops spaces, sports facilities with a swimming pool, gym, sauna, and parking. And in the top floor a private playground for the habitants of the social housing.

S ter Win

un

Single 2.5 x 5m

Double 5 x 5m

Triple 7.5 x 5m

Sliding panels made of different materials define the workshops rooms

Su

mm

er

S ter Win

-1 floor: workshops


erent materials rkshops rooms

Triple 7.5 x 5m

different floors in order to make so the light can penetrate until e program allocated in the under-

inside the housing building. In , sauna, and parking. And in the


History repeats: after ‘80 project a new layer is now trying to resonate with both façades

ON THE SKIN


Repetition and variations: a simple catalog of elements tunes up the actual and previous faรงades


Emphasizing lights and shadows to enable the conditions for an unexpected theatre

ON THE STAGE


continuity

red ribbon

attractiveness public space

theatre

oor

atmosphere

contact

light/shadow

scenography

oor

installation

temporary curtain

02.ON THE STAGE


WS 路 A

miaw2014

Nina Biemmi

Mattia Marin

Eugenia Bolla

Gaia Masera

Maria Bottani

Meltem Ozbek

Irene Curatolo

Teresa Pontini

Laura Giannini

Yuri Rocco

Cristina Gratton

Bilyana Savova

Giovanni Gualdrini

Cecilia Stoppani

Binnaz Kalcioglu

Ilgin Ezgi Tunc

Sandy Jiyoon Kim

Gerardo Vidal Poma

Antonio Laruffa

Yang Yuting

Marco Mannacio Soderini

Zhao Qichao

Jurjen Zeinstra, Gennaro Postiglione with Enrico Forestieri


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.