HONGYI JIN WORK SAMPLES B. ARCH, RICE UNIVERSITY, 2010-2015
HONGYI JIN WORK SAMPLES B. ARCH, RICE UNIVERSITY, 2010-2015 TEL: 832.312.7991 EMAIL: hj.hongyi@hotmail.com ADDRESS: 1702 Bolsover St., Houston, TX 77005 WEB: www.linkedin.com/in/hongyijin +100.50 Level 23
+100.50 Level 7
+100.50 Level 7
+100.50 Level 7
+100.50 Level 7
+100.50 Level 7
+100.50 Level 7
+100.50 Level 1
3.67
+100.50 Level 7
ACADEMIC WORK
PROFESSIONAL WORK
1
1
MULTI-CITY 2010/ARCHITECTURE
2
CARVED BOX 2011/ARCHITECTURE
3
ECO-CITY 2012/MASTERPLAN
4
ROSE ROCK FINANCE CENTER 2012/BJARKE INGELS GROUP/MIXED USE
2
HUNTER’S POINT SOUTH 2014/WEISS MANFREDI ARCHITECTS/URBAN PARK
MODELS AND OTHERS
PUBLIC NETWORK 2013/MASTERPLAN
5
SUSPENDED STRUCTURE 2015/ARCHITECTURE
For the complete portfolio, please visit: https://issuu.com/hongyijin/docs/portfolio.
Work 1:
CARVED BOX
The Valles Caldera Visitor Center
A box that is carved in both horizontal orientation and vertical orientation.
HONGYI JIN/ 2016/ WORK SAMPLES/ ACADEMIC/ WORK 2
The project wants to create the experience of going into the earth and coming back into the nature to address the sublime of the Valles Caldera. The excavation of earth main strategy of the from the landscape is the project. Instead of having building as a solid object placed into the landscape, we imagine the building as coming from the ground as a metaphor of the magma. The action of reshaping the landscape with the strategy of carving allows tools of reforming the space while retaining a subtle impact on the landscape. Thus, the building is created with a series of carving action to create entrance, exit, program, lighting and view.
Work 2:
MULTI-CITY
The New Inter-disciplinary Art Center Sectional Diagram
BRIDGE BRIDGE
3 storey height
2 storey height
1 storey height
TOWER TOWER
Sectional Diagram
HYBRID Programmic section
studio classroom exterio
lobby
r audi
torium
library
exhibition reception
interior auditorium 3 storey height
2 storey height
store
staff cafe
info
gallery
BRIDGE
lobby
1 storey height
HONGYI JIN/ 2016/ WORK SAMPLES/ ACADEMIC/ WORKTOWER 1
Multi-city explores multiple possibilities in connection to the city by creating multiple branches within one united structure. The building aims to engage surrounding urban environment by allowing multiple accesses at different levels. The multipi-city attempts to engage surrounding urban environments by allowing multiple access at different ground levels.The project in a sense multiplies the city by initiating both connections and disconnections within various urban environments. By doing all of this, the project is able to achieve a sense of multiplicity while still maintains its wholeness.
UP
UNDERGROUND FLOOR
FIRST FLOOR
URBAN BRIDGE AND BUILDING BRIDGE
Work 3:
ECO-CITY
KBR Regeneration Masterplan
HONGYI JIN/ 2016/ WORK SAMPLES/ ACADEMIC/ WORK 3
Situated on the previous KBR industrial headquarter, the project envisions an eco-city that employs various conditions of natural scape and urban scape, creating an interactive field of flows along the Buffalo Bayou. I explore the concept of flow with the use of curve lines in plan and the degree of sloping in section. The water pond system on the site provide solution to the flooding issue, soil contamination and probably for the larger area around.
2015
2020
2025
2030
LAYERED NETWORK
BUILDING
PARCEL LAND
URBAN FLOW
flood level -1 mostly filled
GREEN LAND
flood level -2 mostly filled
flood level -3 partially filled
flood level -4 hardly filled
2
3
1
GENTLE SLOPE
CONSTRUCTED SLOPE
NATURAL SLOPE
Different slopes create different urban scape and natural scape. Gentle slope- natural scape Hard slope- urban scape.
WETLAND
The sections represent different conditions of urban/natural environment. The change shows a gradient from natural to urban. Different slopings have different tolerance of level change of water. Gentle slope respond more sensitively to water level change while the steep angle isn’t influenced as much.
Work 4:
PUBLIC NETWORK
Houston Fifth-ward Masterplan The project aims to connect the entire 5th ward through a figural “Public Network”. This network allows for flexibility over time yet creates a clear prescription for program and form. The main factors we addressed were program arrangement, ground coverage, density, and phasing.
HONGYI JIN/ 2016/ WORK SAMPLES/ ACADEMIC/ WORK 4
average ground coverage: 38.17 FAR range: 0.54 - 1.04
BAR
COURT
average ground coverage: 67.37% FAR range: 0.49 - 0.8
FIGURE
FAR: 0.76 | GC: 28.90%
FAR: 0.50 | GC: 31.19%
FAR: 0.98 | GC: 33.91%
FAR: 1.77 | GC: 45.19%
SLAB
BAR
TOWER
COMMERCIAL
average ground coverage: 26.53% FAR range: 0.58 - 3.65
CIVIC
INDUSTRIAL
SHED
average ground coverage: 15.43% FAR range: 0.14 - 0.75
RESIDENTIAL
UNIT
BUILDING
BUILDING TYPOLOGY
BLOCK TYPOLOGY BLOCK
Basic building typologies have four program categories: residential, industrial, commercial, and civic. Those typologies are the basic forms used to study block typology.
Building typologies occupy the block differently according to the ground coverage and FAR range. Building typology occupying one modular block creates a block typology for each program.
GROUND COVERAGE FAR
FLOOR AREA RATIO
GROUND COVERAGE
FLOOR AREA RATIO
GROUND COVERAGE
0.77
29%
0.76
43%
UNITS PER ACRE
CONTINUITY:
UNITS PER ACRE
CONTINUITY:
45.1
0.43
43.8
0.38
Work 5:
SUSPENDED STRUCTURE
Temporary Housing on the Eiffel Tower
HONGYI JIN/ 2016/ WORK SAMPLES/ ACADEMIC/ WORK 5
Eiffel Tower has long been a landmark icon for France. While the experiences from far away and under are different, we see the potential of employing the tower as a structural frame to build within. With the notion of temporary structure, the project inhabits the void space of the Eiffel tower by scaling through the space inscribed by its four-leg structural framework. Residential program is arranged on the external ring, and public program is arranged towards the center, thus creating an inversed exterior urban landscape inside.
0.03
handrail glass
0.15
floor finish
0.97
alumnium sheet
0.01
fascia
floor finish, vaires
ceiling
wood deck 0.25
gusset plate glass
2.70
glass
interior floor finish, carpet 60mmx150mm, metal support
interior floor finish, carpet
metal cap
150mm, wood deck
porous wood flooring raised floor support 20mm, plaster 150mm, wood deck steel cantilever steel truss box
45°
brace varies
metal cap
steel truss box steel tube beam
porous wood flooring 150mm, insulation
ceiling hanger supplementary ceiling support ceiling finish
20mm, silicon sill
steel tube beam 150mm, insulation 20mm, silicon sill
SCALE 1:20
SCALE 1:50
+26.69
3.67
Level 3
+23.03
3.67
Level 2
+19.36
3.85
Level 1
+15.51 Ground floor
+100.50
4.07
Level 23 +96.43
4.07
Level 22
Level 21
3.67
+92.36
Level 20
3.67
+88.69
Level 19
3.67
+85.03
Level 18
3.67
+81.36
Level 17
3.67
+77.69
Level 16
3.67
+74.03
Level 15
3.80
+70.36
Level 14
3.80
+66.56
Level 13
3.80
+62.76
Level 10
3.25
Level 11
3.70
Level 12 +55.71
+52.46
3.25
+58.96
Level 9
3.70
+48.76
Level 8
3.70
+45.06
Level 7
3.67
+41.36
Level 6
3.67
+37.69
Level 5
3.67
+34.03
Level 4
3.67
+30.36
Level 3
3.67
+26.69
Level 2
3.67
+23.03
3.85
+19.36
Level 1 +15.51
15.51
Ground Floor
+0.00 Ground
Solution: Bamboo
Construction: Assemble
Bamboos are light, strong in tensile strength and easily treatable. When being used in structure, bamboo frames are good in disaster area because they are light and perform well in earthquakes. SHAPES
CONSTRUCTION MANUAL
The Philippines area was severely demaged by the typhoon Haiyan. Post-disaster construction is in great need to accomodate homeless people. Thus, solutions for emergency post-disaster housing are needed to help solve the problem
How to build a bamboo concrete house
Cutting bamboo could be operated by unskilled/semiskilled local people. Using the knives, cutting could be done by one single labor and it is rela-
Bamboos are abundant local materials. The project takes advantage of this local source and create a design that is lightweight, aesthetic and respectful of local culture and tradition.
MATERIALS
COMPONENTS
CONNECTIONS 90 degree
bamboo
iron wire
cement
rebar
WALL PANEL A concrete filled with bamboo
[A]
TOOLS whole culm
half culm
[2] half culm
connect with string WALL PANEL B bamboo weave
sharp knife
dulled blade
drill
TRANSPORTATION
loading truck
BAMBOO HOUSE
Post-Disaster Temporary Housing The Bamboo House
Post-disaster emergency housing in the Philippines
The Philippines area was severely demaged by the typhoon Haiyan. The Philippines area was severely demaged The project provies a solution to the Post-disaster emergency by the typhoon Haiyan. The project provies housing construction by utilizing abundant local materials-bamboo combined with concrete. The scheme provides a low-tech, easily housing construction by utilizingand abundant operable scheme for local people to construct fast, affordable sustainable housing in the Visayas islands. concrete. The solution provides a low-tech, The solution to fast and sustainable design is utilizing the bamboo, which is abundant locally and used a lot by local people. The design uses bamboo as not only structure members, but also aesthetic elements that draw respect from the vernacular architecture.
HONGYI JIN/ 2016/ WORK SAMPLES/ ACADEMIC/ WORK 6
FOUNDATION concrete
[B]
connect with the trimmed bamboo
[3] split culm
FLOOR PANEL bamboo plank
Work 6:
[C]
connect with string/stick
split culm
whole culms are used for structural columns, shade screens, roof members
angled
COLUMN/BEAM
TYPICAL UNIT PLAN 1
DECOMPOSED UNITS
2
3
4
5
6
50’-0” 10’-0”
10’-0”
10’-0”
10’-0”
10’-0”
5’-0”
A
[4]
[1]
[3]
B
5’-0”
[2]
core
individual sleeping unit
living
C
5’-0”
service area
D
5’-0”
20’-0”
[5]
storage prefabricated and be installed in the house
sleeping unit contains double bed room and single beds room relatively open
communal area open could be shared be aggregated and shared by multiple units
[6] closeness E
SCALE 1’
2’
3’
5’
10’
openness
Work 1:
ROSE ROCK FINANCE CENTER
Bjarke Ingels Group/ Tianjin, China 本图纸版权属设计院及业主,未经许可第三方不得复制或使用。 图中所注尺寸应在施工前进行现场核实,如有问题应立即提交 工程师协调解决。
建设单位
铁 YJP RAIL STATION
01 30-630
Type: Mixed-use towers CLIENT
首席顾问
LEAD AND DESIGN CONSULTANT
01 30-620
奥雅纳工程咨询(上海) 有限公司北京分公司
公 PARK
02 30-640
Height: 588m ARUP INTERNATIONAL CONSULTANTS
(SHANGHAI) COMPANY LIMITED
BEIJING BRANCH
道 YU REN ROAD
北京市朝阳区京广中心 邮编: 100020
路 KERB 红线 REDLINE
30楼3008 室
Room 3008 30/F Jing Guang Centre Hu Jia Lou, Chaoyang District Beijing, China Code: 100020
红线 SETBACK
设计负责人 图号
版次
首席建筑师 LEAD ARCHITECT
BIG New York, NY 10001 601 W. 26th St. Suite 1255 USA
P-32-01
P-32-02
Area: 360,000 sq. m.
建筑和规划顾问
ARCHITECTURAL CONSULTANT
HKS | FuMorton Urban Design Studio 107 Grand Street . 6th Fl. New York . NY . 10013
中央大道 CENTRAL AVE.
路 PU JING ROAD
新华路 ROAD XIN HUA
04 30-640
P-32-03
商业顾问 01 30-640
BUSINESS CONSULTANT
01 30-610
北京市 朝阳区光华路1号北京嘉里中心南楼19楼 邮编:100020
19th Floor, South Tower Beijing Kerry Centre No. 1 Guanghua Road Chaoyang District Beijing, China Code: 100020
品牌顾问
P-32-04
ROSE ROCK INTERNATIONAL FINANCE CENTER
BRANDING CONSULTANT
CO-OP 115 Fifth Avenue 5th Floor New York, NY 10003
SUPERTALL STUDY 2012.07.17 BIG
Contribution: Supertall building precedent research. Large-scale and concept model making. Assisted with drawings and editing for design report booklets. CO-OP 北京市西城区金城坊街7号英蓝国际金融中心633 邮编:100033
SUPERTALL STUDY
ROSE ROCK INTERNATIONAL FINANCE2012.07.17 CENTER BIG
经济顾问
01-33 地 P-32 地
P.A. 48,835 sm F.P.A. 31,100 sm G.F.A 542,644 sm
ECONOMIC CONSULTANT
CBRE (CBRE TJ) 天津市和平区南京路 189号津汇广场写字楼 1号楼 9
层903单元 邮编: 300051
P.A. 22,092 sm F.P.A 14,941sm G.F.A 361,216sm
CB Richard Ellis CBRE Consulting | Beijing 11th Floor | Tower 2, Prosper Centre No. 5 Guanghua Road | Chaoyang District Beijing, PRC 100020
路 YONG TAI ROAD 项目名称 03 30-640
PROJECT TITLE
Rose Rock International Finance Centre CONVENTION CENTER
Tianjin, Yujiapu
罗斯洛克国际 金融中心 天津,于家堡
图纸名称
DRAWING TITLE
本图纸版权属设计院及业主,未经许可第三方不得复制或使用。 平面图
SITE PLAN
图中所注尺寸应在施工前进行现场核实,如有问题应立即提交 工程师协调解决。
P-0-91-070
1
SITE PLAN
比例
0
1/1000
ROSE ROCK INTERNATIONAL FINANCE CENTER 28 M
32 M
SUPERTALL STUDY 60 M 28 M
SHANGHAI WFC
30 m
10
20
50
100
200
图
1:1000
65 M 32 M
版次
P-0-91-070
+588.00
首席顾问
LEAD AND DESIGN CONSULTANT
奥雅纳工程咨询(上海) 有限公司北京分公司
83m
ARUP INTERNATIONAL CONSULTANTS
SHANGHAI 29 m TOWER
LOTTE JAMSIL SUPER TOWER
65 M
ICC HONG KONG
LOTTE JAMSIL SUPER TOWER
(SHANGHAI) COMPANY LIMITED
公共用途
66m 83m
SHANGHAI WFC
概念
T.O.ROOF
66m 30 m
ICC HONG KONG
A1
阶段
图号
29 m
2012.07.17 BIG
60 M
幅
日期 CLIENT 建设单位 12.06.06
PUBLIC PROGRAM
BEIJING BRANCH
避难层 HOTEL +492.80 REFUGE FLOOR
北京市朝阳区京广中心 邮编: 100020
SHANGHAI TOWER
4.00M FTF
设计负责人
避难层 HOTEL +440.80 REFUGE FLOOR
首席建筑师 LEAD ARCHITECT
4.00M FTF
REFUGE FLOOR
版次
图号
酒店 HOTEL
避难层 HOTEL
30楼3008 室
Room 3008 30/F Jing Guang Centre Hu Jia Lou, Chaoyang District Beijing, China Code: 100020
酒店 HOTEL
+388.80
BIG New York, NY 10001 601 W. 26th St. Suite 1255 USA
酒店 HOTEL
4.00M FTF 避难层 HOTEL +332.80 REFUGE FLOOR T.O.ROOF
建筑和规划顾问
+334.500
ARCHITECTURAL CONSULTANT
居住 RESIDENTIAL 3.60M FTF 避难层 HOTEL +278.40 REFUGE FLOOR
HKS | FuMorton Urban Design Studio 107 Grand Street . 6th Fl. New York . NY . 10013
居住 RESIDENTIAL 3.60M FTF 避难层 HOTEL +224.40 REFUGE FLOOR
办公 OFFICE
4.40M FTF 避难层
15 M
北京市 朝阳区光华路1号北京嘉里中心南楼19楼 邮编:100020
4.40M FTF
15 M 110 M
66m
65 M
83m
ICC HONG KONG
LOTTE JAMSIL SUPER TOWER
SHANGHAI TOWER
60 M
PING AN ICC
110 M
BURJ KHALIFA
办公 OFFICE
避难层
32m
BURJ KHALIFA
品牌顾问
避难层 HOTEL +101.60 REFUGE FLOOR
办公 OFFICE
4.40M FTF
4.40M FTF
62m
CO-OP 115 Fifth Avenue 5th Floor New York, NY 10003
避难层 HOTEL
+40.00 REFUGE FLOOR 交易大厅 TRADING 5.00M FTF
商业 / 特别项目 RETAIL / SPECIAL PROGRAM 5.00M FTF
ONE WORLD TRADE CENTER
经济顾问
B2
ONE WORLD TRADE CENTER
ECONOMIC CONSULTANT CBRE (CBRE TJ) 天津市和平区南京路 189号津汇广场写字楼 1号楼 9 层903单元 邮编: 300051
-5.400
B2 METRO LINE B2地铁线
XIN HUA ROAD CAR TUNNEL
Z4 地铁线路(位置待定) Z4 METRO LINE (LOCATION TO BE CONFIRMED)
CB Richard Ellis CBRE Consulting | Beijing 11th Floor | Tower 2, Prosper Centre No. 5 Guanghua Road | Chaoyang District Beijing, PRC 100020
中央车道(位置待定)
CENTRAL AVE. CAR TUNNEL (LOCATION TO BE CONFIRMED)
红线 用地边界
Page 63 ALL DIMENSIONS ARE APPROXIMATE 1 SECTION 1
RED LINE SITE BOUNDARY
项目名称
ALL DIMENSIONS ARE APPROXIMATE
HONGYI JIN/ 2016/ WORK SAMPLES/ PROFESSIONAL/ WORK 6
BRANDING CONSULTANT
CO-OP 北京市西城区金城坊街7号英蓝国际金融中心633 邮编:100033
办公 OFFICE 避难层
REFUGE FLOOR +50.000
新华路地下车行隧道
PING AN ICC
4.40M FTF
REFUGE FLOOR +120.400
62m 32m
29 m
19th Floor, South Tower Beijing Kerry Centre No. 1 Guanghua Road Chaoyang District Beijing, China Code: 100020
避难层 HOTEL +163.20 REFUGE FLOOR
办公 OFFICE
30 M
3060MM
30 m
BUSINESS CONSULTANT
办公 OFFICE 4.40M FTF
REFUGE FLOOR +190.800
32 M
商业顾问
PROJECT TITLE
Rose Rock International Finance Centre Tianjin, Yujiapu
罗斯洛克国际 金融中心
1/2000
Page 63
天津,于家堡 图纸名称
DRAWING TITLE
剖面图1 东西向剖面
SECTION 1 EAST-WEST
P-0-30-610 15 M
1:2000
日期
12.06.06
图号
32m 110 M
比例
62m
图 幅
P-0-30-610
A1 阶段 版次
概念
Work 2:
HUNTER’S POINT SOUTH WATREFRONT PARK
Weiss/Manfredi Architects/ Queens, NY
Type: Urban park Area: 11 acre Contribution: - Created 3D model for the site and master plan. - Generated schemes for the overlook bench options. - Assisted with Construction drawings, renderings
Work 3:
RICE UNIVERSITY STUDENT CENTER
Weiss/Manfredi Architects/ Houston, Texas
Type: Education, Programming
Graduate Students
Graduate Students Residential Colleges
Residential Colleges
Valhalla
Contribution: -Conceptual diagrams, site plan, plans and sections. -Presentations for client meetings. -Renderings -Final design report as the project deliverable
Architecture and Engineering Park Fondren Library Gibbs Plaza
Rayzor Hall
Student Center Central Quad Baker Plaza
Southeast Herring Hall
CENTRAL QUAD:
Central Quad could be the focus of campus-wide social activity and events. OBSERVATIONS
• Centrally located quadrangle with key adjacencies and trees • Quadrangle does not promote cross-circulation • North and south edges are not engaged by existing buildings • Not designed to support flexible student use/events
STUDENT ORG OFF.
PROPOSED KEY FEATURES
CENTRAL QUAD
HONGYI JIN/ 2016/ WORK SAMPLES/ PROFESSIONAL/ WORK 3
• Site furnishings that contribute to place identity • Well-drained lawn for active use • Reconceived quadrangle circulation • Enhanced teledata/ power and lighting for flexible performance/ events • Plaza/stage for performances • Permanent tent pole footings for event
LOOP ROAD
RADIO/TV CAFE PUB
ATRIUM
CONFERENCE CENTER
BOOKSTORE
QUAD
Work 4:
MODEL MAKING AND OTHERS
Concept Models, Detail Models, Book Production
HONGYI JIN/ 2016/ WORK SAMPLES/ PROFESSIONAL/ MODELS AND OTHERS
HONGYI JIN B.ARCH RICE UNIVERSITY
For the complete portfolio, please visit: https://issuu.com/hongyijin/docs/portfolio_d93847166d3d5f/1. TEL: 832.312.7991 EMAIL: hj.hongyi@hotmail.com ADDRESS: 1702 Bolsover St., Houston, TX 77005 WEB: www.linkedin.com/in/hongyijin www.hongyi-jin.com