PRIVATE SECTOR INITIATED POWER PROJECTS (MINDANAO) As of 5 November 2012

Committed / Indicative

Name of the Project

Project Proponent

Rated Capacity (MW)

Location

COAL

1

Target Commissioning

200

Various permits obtained; BDO, DBP, RCBC and UCPB have obtained their respective pre-clearances to enter into the transaction; Power Sales Agreement for 70MW between Sarangani Energy Corporation and South Cotabato II Electric Cooperative, Inc (SOCOTECO II) was executed on June 3, 2011; Issuance of Notice to Proceed to the EPC Contractor is scheduled on March 2012; Project cost $450M; Testing and commissioning will commence 29 months after Notice to Proceed; Commercial operation will commence 35 months after issuance of Limited Notice to Proceed.

2014

Q2 2014

920.00

2 X 100 MW Southern Mindanao Coal Fired Power Station

Committed

Project Status

Sarangani Energy Corporation (formerly Conal Holdings Corp.)

Maasim, Sarangani

300

Project cost Php24B; Secured right to land; Secured permits for site development works; Self-funded with on-going negotiation with financial institutions; various permits obtained; EPC contract awarded to Black and Veatch on June 2012; Secured SEC, BIR, BOC, BOI, ECC permits; LGU/Sangguniang Panlalawigan Davao City Reclassification already granted and issued on 12 Dec. 2011; On-going site preparation works; Site development works by 3rd Qtr. of 2012; Target commercial operation is Q1 2015

2

Committed

2 X 150 MW CoalFired Therma South Energy Project

Therma South Inc.
(Aboitiz Power Corporation)

Brgy. Binugao, Toril, Davao City and Brgy. Inawayan, Sta. Cruz, Davao Del Sur

3

Indicative

Steag Expansion Project

Steag State Power Corp.

Phividec, Misamis Oriental

200

On-going feasibility study; on-going discussions with NPC/PSALM regarding the common facilities

December 2014

4

Indicative

ZAM 100 MW Circulating Fluidized Bed (CFB) CoalFired Power Station

San Ramon Power Inc.

San Ramon, Zamboanga City

100

On-going securing permits; DENR had issued ECC in April 2012; ongoing marketing. Project cost is $280M

Q3 2015

5

Indicative

Davao del Norte 20 MW Circulating Fluidized Bed Biomass-Coal Fired Thermal Power Plant

FDC Utilities, Inc.
(FDCUI)

Maco, Davao del Norte

20

Awaiting approval of sale from ERC on proposed plant connection at DANECO 69/13.2kV Canocotan Substation; On-going of securing of permits; Project cost is Php4.8B

Q1 2015

6

Indicative

Sibuguey Power Plant Project

Philippine National Oil Company (PNOC-EC)

Sibugay, Zamboanga

100

Technical and economic feasibility study was completed in July 2011; Eligible bidder for Transaction Advisor on 8 August 2012; On-going bid precessing for the EIS consultancy leading to ECC application and other permits

2016

PRIVATE SECTOR INITIATED POWER PROJECTS As of 25 October 2012 Name of the Project

Project Proponent

Location

Rated Capacity (MW)

COAL

1,190.00

1

140MW Petron Coal

Petron Corporation

Limay, Bataan

140

2

600 MW Coal SMC Global Power Holdings Corp.

SMC Global Power Holdings Corporation

Leyte

600

3

150MW Coal SMC Global Power

SMC Global Power Holdings Corporation

Panay

150

4

300MW SMC Global

SMC Global Power Holdings Corporation

Malita, Davao del Sur

300

Electric Industry Power Structure Generation

Transmission

Distribution

IPPs

National Transmission Corporation (NTC)

Private Utilities Government-owned Utilities and Electric Cooperatives

NPC Spin-off Generation Companies Co-Generators Self-Generators

LEGEND 66

Supply

Transmission Control Spot Market Energy Flow Energy Transaction

Green is Gold: How Renewable Energy can save us money and generate jobs

Consumers Industrial

Commercial Retail of Electricity Supply

Residential


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.