German Village Guidelines

Page 169

A P P L I C AT I O N

151 147

German Village Commission Page 3. German Village Commission Requires recommendation for a variance, re-zoning: Page 2. ___ Council use variance ___ Council density variance ___ Board of Zoning Adjustment variance APPLICATION CHECKLIST (to be completed by Commission Secretary) ___ Development Commission re-zoning __ Application, completed __ Site plan __ Photos of building, overall views

__ Building elevations, floor plans-3

ZONING STAFF CHECKLIST be completed by zoning administrator for projects zoning variancesliterature may be required) __ Detail(tophotos __where Manufacturers ___ No variances appear to be required __ Streetscape photos __ Paint color chips If variance is requested, also#S____________________________________ Include: If lot split is requested, also include: ___ Possible required variances include: Section __ Name & address of property __ Sketch of lots, including dimensions Description_____________________________________________________________________ owners within 125’ __ Engineers maps showing surrounding lot ______________________________________________________________________________ __ Statement of hardship NOTE: -If variance is required, a zoning application must accompany this application. _____ Zoning administrator’s initials

Note: Applications and supporting data must be on file by 5:00 PM two Tuesdays prior to the Commission

APPENDIX C

at check which application heard. The Commission meets at 4:00 PM on the first Tuesday of WORK SUMMARYmeeting - Please the areaswill of be proposed work and explain below as needed. of workareproposed Explain necessary) each month.Type No meetings held on Election Day, (continue holidays,onorseparate the daysheet afterif a holiday. The specific date (check all that apply) and location of the meeting may be obtained by contacting this office. DEMOLITION _____ _____________________________________ The applicant’s plans that are intended to be submitted to the Superintendent of Building Regulations, City REHABILITATION OF EXISTING STRUCTURE (House/outbuilding) of Columbus, are first to be presented to the Commission at this meeting for purpose of review. Building Foundation _____ requires that plans be_____________________________________ permit application stamped and signed by the Commission. Masonry _____ _____________________________________ Consultation with the German Village Commission Assistant prior to application submission is encouraged. Siding _____ _____________________________________ Also, the German Village Design Guidelines is available for reference at the German Village Society Roof, gutters, downspouts _____ _____________________________________ Office, 588 South Third Street, or the Commission Office, City of Columbus, 50 West Gay Street. Plan to Chimney _____ _____________________________________ attend the Commission meeting prepared to answer questions about the proposal. Doors and entrances _____ _____________________________________ Storm/security doors _____ _____________________________________ Basic Information Windows _____ _____________________________________ Desires a lot split _____ Yes _____No Storm/security windows _____ _____________________________________ If_____ yes: Existing lot size _________ x _________ Porch or stoop _____________________________________ New lot A size _________ x _________ Cornice or frieze _____ _____________________________________ New lot B size _________ x _________ Ornamentation _____ _____________________________________ Desires change in use: (i.e. change from residential single to multifamily, to office, to retail, to Awning or canopy _____ _____________________________________ home occupation) Explain: ____________________________________________________ Storefront _____ _____________________________________ _________________________________________________________________________ Painting (specify color) _____ _____________________________________ _________________________________________________________________________ Other (explain below) _____ _____________________________________ _________________________________________________________________________

_________________________________________________________________________ ADDITIONS TO BUILDING Dormer _____ _____________________________________ Skylight _____ _____________________________________ Penthouse _____ _____________________________________ 146 Chimney _____ _____________________________________


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.