EXCELLENCE IN CRAFTSMANSHIP: $50+ MILLION
Photo Credit: Greg Benson Photography
Island Waterpark at Showboat Resort WINNER
E.P. Guidi, Inc. PROJECT DESCRIPTION Island Waterpark at Showboat Resort — the largest beachfront indoor waterpark and one of the largest openair greenhouse structures in the country — was a complex project from inception through completion. Five separate design firms were involved and specialty contractors came from across the world, including Canada and Australia, to help ensure the massive fast-track project was a success. The workmanship required from sitework, survey/layout, excavation, water control, concrete foundations, underground utilities, specialized piping, and inserts, up through slab-ongrade was exacting. The craftsmanship and quality of work necessitated top-tier finishes, requiring materials to be sourced globally and skilled manpower of the highest level.
54 CONSTRUCTION TODAY
OW N E R Tower Investments ARCHITECT SOSH Architects ENGINEER Concord Engineering Groundswell Design Group Innovations Design Group Martin Aquatic Design & Construction G B C A M E M B E R C O L L A B O R AT O R S Shore Building Contractors, Inc.