Laporan tahunan 2011 dan rencana 2012 drt

Page 1

GBC Indonesia KEGIATAN – HAMBATAN – USULAN/SOLUSI


STRUKTUR ORGANISASI DIREKTORAT RATING &TEKNOLOGI * Dept. Rating Development * Dept. Certification * Dept. Training & Education

* Rencana Divisi Project Communication Officer

Direktur Rating dan Teknologi Administration

Manager Rating Development

Manager Certification

Manager Training

1 org + 5 staf

1 org + 3 staf

1 org + 2 staf

Project Communication Officer (Rencana)


Scope of Responsibility Dept Rating :

Dept Sertifikasi :

 Susun Konsep Perangkat Penilaian Dan Formulir

Melakukan Sertifikasi

 Analisa Dan Studi

Penyesuaian / Workshop

 Diskusi Kelompok

Kualitas & Kelengkapan

 Konsensus National  Pengenalan (Launching)  Mendampingi Tim Sertifikasi / Tim Lainnya

Data Dasar Dari Proyek Registrasi Proyek

Melakukan Verifikasi Evaluasi & Penyesuaian Proses dan Prosedur

Dept. Training :  Data Dasar Keanggotaan GA, GP, dll.  Mengadakan Training : 1.Greenship Associates, 2.GP untuk NB,  3.GP untuk EB  4.Training SeriesDLL.


Dept. Rating 2010 -2012  Rating Tools New Building

: 17 Juni 2010  Rating Tools Existing Building : 13 January 2011  Rating Tools Interior Space : Oktober 2011


RATING DEPARTMENT JOB DESK

 We have to do the job, otherwise we loose the

momentum  Limited manpower and not cover the whole area of GB

INSIDE RATING DIVISION

(MAIN JOB DESK) OUTSIDE RATING DIVISION, INSIDE GBC INDONESIA OUTSIDE RATING DIVISION, OUTSIDE GBC INDONESIA


Inside Rating Department Develop Rating Tools Framework

Draft Rating Tools

Final Draft National Consensus

Manual/Technical Book


OUTSIDE RATING DEPARTMENT, INSIDE GBC INDONESIA Certification Agenda  Involve in workshop for project team  Involve in verification of project documents  Develop and update evaluation form for each GREENSHIP rating tool

Training Agenda  Develop and update GA training material  Develop and update GP training material Membership Agenda  Support membership team in giving explanation about GREENSHIP to prospective members


OUTSIDE RATING DEPARTMENT, OUTSIDE GBC INDONESIA Government Project  Eco hotel  Eco office  Eco industry  Eco airport  Eco drainage  Eco hospital Agenda

 Involve in meeting and discussion  Involve in developing draft for each project Academic or Assosiation Agenda  Being resource speaker in seminar  Being resource speaker in lecture session  Develop paper research Media Agenda  Develop article, at least twice a month


New Building Existing Building Interior Home Neigborhood Industry

INSIDE RATING DEPARTMENT (MAIN JOB DESK) - 2011 Week

September

1

2

3

October

4

2

3

4

1

2

3 4

December

5

1

2

3

RTC Launch 1.1.

RTC Frameworks

1

November

Rapat komisi: nama

30 sept sharing

Draft 1 Discussion w/ Expert Draft 2

14 oct, 1st Look Persiapan I II TAG 1 Nov 8 Nov 11 Nov

Discussion w/ TAG

Draft 3

Persiapan, IT

National Consensus Developing Book

Web simulation Manual Jadi 1 dengan web simulation

Project Excercise Final dari Rating Hak Cipta & Cover Cetak Final Launching

Mid Oct

Target dari IAI

4


New Building Existing Building Interior Home Neigborhood Industry

INSIDE RATING DEPARTMENT (MAIN JOB DESK) - 2012 January 1 2 3 4 RTC

February March 12 3 4 1 2 3 4

April 1 2 34 1

Meeting RTC EB Komisi 1.1

Frameworks Draft 1

First Look

Discussion w/ Expert Draft 2 Discussion w/ TAG Draft 3 National Consensus Developing Book Project Excercise Final dari Rating Hak Cipta & Cover Cetak Final Launching

Persiapan

TAG 1 TAG 2

Mei 2 3

4

1

June 2 3

4


Dept. Sertifikasi 2011-2012 ď‚— In total 68 Building Projects have come in contact at

various status. ď‚— Profiling in Type, Location & Status has raised some issues need to be care.


GREENSHIP TYPE 1%

2% 3% 3%

12%

54%

25%

New Building Eksisting Building Interior Space Neighborhood Manufacturing Natural Ventilation Power Plant GREENSHIP type anticipated by

market


LOCATIONS 14%

1% 4% Jabotabek Bali

8%

Jateng & Jogja

Jatim Lain-lain 73%


In Status 80

•Data Contact person •Certification Type 70 •Paket perkenalan

Banyaknya Proyek

60 •Intense Communication •Pertemuan perkenalan & diskusi

50 40 30 20

•Donasi Pendaftaran •Isi Formulir •Kontrak

10

•Pembayaran •Assessment

0 Pernah Menghubungi

Pernah Progresif

S = 68 Total Proyek yang menghubungi

Minimum Donation

Registered


GREENSHIP PROJECTS No. Building Name 1 The Breeze Office, BSD City 2 Sopodel Tower 3 Rasuna Tower 4 PUSDEP, Pertamina 5 Energetic Material Center PT Dahana Tbk 6 RS. Dr. Kariadi Semarang 7 Perpustakaan UGM 8 DPRD & Pengembangan Balaikota 9 Gereja Kristus Raja 10 Ciputra World Jakarta 11 German Centre Indonesia 12 Alamanda Tower 13 Austrian Embassy Jakarta 14 Sampoerna Strategic Square 15 Menara BCA, Grand Indonesia Office Tower 16 Gedung Menteri PU 17 Teknogas

Stage Registration Registration Registration Registration Registration Registration Registration Registration W1 & W2 W1 & W2 W1 & W2 W1 & W2 W3 W3 Certification Assessment Design Recognition Certification Assessment


PROBLEMS IDENTIFIED  Certification Process & SOP still under pilot process &

completing.  Manpower is still under training & out of numbered.  The system is still new & need further dissemination to Indonesia’s Building Industry.  A more strategic approach in dissemination & education on GREENSHIP


Dept. Training 2011-2012 ď‚— Complex job to hold a training

(material, instructor, event, venues) ď‚— Develop training material for GP on EB, IS and training series ď‚— GP is not legally accredited


GREENSHIP Associate Participant 140 120 100 80 60 40 20 0

121 66

79

61

GREENSHIP Associate…

I (2 phases, Feb 2010)

II (Nov 2010)

III (Feb 2011)

IV (Jun 2011)

GREENSHIP Professional Participant 60 50 40

55 47

44 37

32 26

30 20

GP Participant

25

Graduated GP

79%

10

81%

57%

II (Nov 2010)

III (Mar 2011)

xx% Success Rate

0

I (Jul 2010)

IV (Jul 2011)

Total GP s/d Batch-3 = 88 orang


standar kompetensi


RENCANA TRAINING PROGRAM 2012 GREEN BUILDING INDONESIA No 1 2 3 4

5 6 7

1

2

3 4 5

Kegiatan

JAN

Main Training 12-14 GREENSHIP Associate (GA) Batch VI GREENSHIP Professional (GP) Batch VI GREENSHIP Associate (GA) Batch VII GREENSHIP Professional (GP) Batch VII GREENSHIP Professional (GP) EB Batch II GREENSHIP Associate (GA) Batch VIII GREENSHIP Professional (GP) Batch VIII Series Training EEC - OTTV ( Overall Thermal Transfer Value) EEC - Natural Lighting EEC - On Site Renewable Energy Material Resource and Cycle : Building and Material Reuse Certified Wood Modular Design Regional Material ASD - Storm Water Management ) IHC - Outdoor Air Introduction BEM - West Management BEM - Pollution of Conctruction Activity BEM - Proper Commisioning

FEB

MAR

APRIL

MEI

JUNI

JULI

AUGUST

SEPT

NOV

3,4,9-11 5-7 4,5,10-12

12-14 16-18 28,2 4-6 9

25

24

19 30

25

DEc


KE I S MP L U N A  GBCI mempunyai komitment untuk mentransformasi market sehingga mempunyai paradigma baru 

green  Stake holder banyak berharap dari GBCI  Tanggung jawab, misi dan beban kerja GBCI mempunyai skala nasional, kompleks dan meliputi semua sendi kehidupan berbangsa  Kita harus merubah paradigma kita bahwa :  We have a big mission and responsibility  We need a big vehicle