Cai Chengzhi_ Worksample

Page 1

Chengzhi CAI


150-44 78 rd. Flushing, NY-11367

314-484-5627

chengzhic@wustl.edu

Chengzhi Cai

@

(Evan)

Master of Architecture B.E. Civil Engineering

Experience

Education

2012.6-2012.8

2009.8 - 2012.12

Space Cube Design Lab (S3-Lab), Shanghai , China http://s3-lab.com/

Master of Architecture

Intern Architect (10 weeks 50h/week)

Content Auto Exp. Center

-WUSTL Degree Project, 12Fall, individual -Rhino, Grasshopper, Panelling tools, Keyshot -Critic: Ben Fehrmann

School of Architecture Washington University in St. Louis

Lakefront Office

2005.9 – 2009.5

Project: 1.

Redesign of the exsisting cereal stock into a Museum of Underwater Antiques, Piraeus, Greece

2. 3.

Mountain Creek Retreat Design, Fujian, China Personal Office Building Design

Role: Schematic Design, Digital Modelling, Parametric Design, Computer Rendering, Client Meeting, Environmental Design

2011.9-2012.5

School of Civil Engineering Southeast University, China

Skills BIM 3D

Digital Fabrication Monitor (1Year 6h/week)

School of Architecture, Washington Univ. in St. Louis, USA 2008.8-2008.9

Interior Construction Engineer (5 weeks 15h/week) Taihezijing Hotel, Nanjing, China

Participated in MEP Constructions & Installations

2006.7-2006.8

Construction Engineer (8 weeks 70h/week)

Participated in Structural construction process including long-span post-tension concrete beam, traditional conc. casting.

Freelance Business 2009.9-Now

Founder, Senior Architecture Instructor & Marketing

ECO 2D

Revit Arch.

Vasari

Rhinoceros TSpline Keyshot

Grasshopper Panelling tools Vray

Ecotect

Climate Consultant

Illustrator AutoCAD

Photoshop InDesign

Pleat come in!

-WUSTL 318 Studio, 10 Spring, individual -Rhino, Grasshopper, paper pleating -Critic: Igor Majanovic

Parking in a Park

-WUSTL 612 Studio, 12 Spring, individual -Rhino, AutoCAD -Critic: David Ruy

Awards & Publications 2009, 2010, 2012 Studio work selected in “Approach” Magzine Washington University in St. Louis

FORMCORE MOLD

WITH INFILL PORT AND WIRE-HOLDER

Urban Theatre

-WUSTL 317 Studio, 09 Fall, individual -AutoCAD, All handmade modelling -Critic: Sungho Kim

2011 Selected in Graduate Open House Exhibition Washington University in St. Louis 2009 Outstanding graduate (Top 2%) Southeast University, China

FABRIC IN CENTER

Non-Architectural

Dengfuxiang Residence Project, Guangsha Co.,Nanjing, China

-S3-Lab Real project, 12 Fall, Teamwork -Revit Architecture, SketchUp -Private office for Mr. Liang Wengen, Chair of Sany Heavy Industry, Changsha, CN

B.S. Civil Engineering (Structural Engineering)

PUT THE PIANO WIRE INTO THE HOLES ON THE WIRE-HOLDER

Glue sucks

WIRES ARE ARRANGED IN THE WAY THAT LOOKS LIKE A SPIRAL

AFTER WE POUR PLASTER INTO THE MOLD, THE FABRIC AND WIRE CREATE A BULGED SURFACE

-Digital Fabrication, 11 Spring, individual Project Techtonics -Rhino -Critic: Kenneth Tracy Develop a techtonic that use only one material to create structure, pattern and detail connections. Highly digitalized fabrication process.

Studio ALPHA Group, Shanghai, China Academic organization that provide advsing & professional training service for Chinese architecture students. Designer Forum that publish selective design works including architecture. Website Under construction

2008 1st prize Structure Design Competition Southeast university, China 2007 1st prize Structure Innovation Competition Academy of Civil Engineering, Jiangsu, China

Material

Mylar (0.05mm)

Casting Vortex

-Digital Fabrication, 11 Spring, team leader -Rhino -Critic: Christine Yogiaman


In Less than 4 Seconds!

Viaduct renovation into a Auto Museum & Experience Center that experience & be experienced by speed. The design take full advantage of existing viaduct hub to enhance architectural experience & fulfill its urban impact.

Automobile & Transportation Exp. Center

I5

5

312 M

24 6 M

287 Mete rs s

wing do lo

et er ss pe e

di ng

n w

up

LVD

er B

Tuck

I55

eter s sl o wing

0

43

51 8M et e

309 M et e

I44

rs

sp e

ed i

M

ng

et er s

up

slo w

up

i n g d wn o

dow n

te

t ye

fa

La

ng di ee sp rs

e

Av

To

Do

wn

tow

nC

om

me

rci

al

Ar

ea


Upper roof cladding

Low-e framed glass panels

Steel Structures

Lower Roof Membrane Low-e framed glass panels

glass supported glazing

floor exhibition space Spiral stairs framed glass panels Floor structure

Floor lower cladding framed glass panels

Building Joint 2

Building Joint

1

Building Joint

3

Bu

ild

ing

Jo

int

4

Structure diagram

Technical Section



Lakefront Office

Private office for Mr. Liang Wengen, Chair of Sany Heavy Industry, Changsha, CN Under construction

-S3-Lab Real project, 12 Fall, Teamwork -Revit Architecture, SketchUp -Role: Schematic Design, production of rendering, technical drawings and diagrams


0 1

2.5

5

10

0 1

2.5

5

10

0 1

2.5

5

10

0 1

2.5

5

10

+7.500 +6.000 +5.000

+0.000 -0.800 -1.700

0 1

2.5

5

10

+7.500 +7.500

+6.000 +5.000 +7.500

+6.000 +5.000

+6.000 +5.000 0 1

+0.000 -0.800

2.5

5

+0.000 -0.800

10

-1.700

-1.700

+0.000 -0.800 -1.700

+7.500 +6.000 +5.000

0 1

2.5

5

10

+7.500 +7.500 +0.000 -0.800 +6.000 -1.700 +5.000

+0.000 -0.800

72

0 1

2.5

5

+6.000 +5.000

+0.000 -0.800

10

-1.700

-1.700

+7.500 01

+6.000 +5.000

72

+0.000 -0.800

2.55

10

72

73

-1.700

01

72

2.55

10

73


Pleat come in!

-WUSTL 318 Studio, 10 Spring, individual -Rhino, Grasshopper, paper pleating -Critic: Igor Majanovic

Building from folding one piece of paper

Full envelope

11

4

6 1

A A

Glass panels

11 12 8

2 Paper-Pleating Modelling

7 Interior walls

B

Fold backward Fold forward

B

Exterior envelope

2 nd floor plates

12

2

9

8 10 13

C

C 1 st Floor Plates

5 2

Interior envelope

13

D Approaches and ramps

D

5 3

E

E

Wire Frame


612 Studio, 12 Spring Parking in a Park -WUSTL -Rhino, AutoCAD

Parking Lot Design on a lake

-Critic: David Ruy

The design focus on resolving conficts between artificial infrastructure and natural environment. It enriches the defination of parking and really make it a place.

100

250


Urban Theatre

Mini Semi-underground urban theatre

-WUSTL 317 Studio, 09 Fall, individual -AutoCAD, All handmade modelling -Critic: Sungho Kim


Glue Sucks

3-Dimensional structural weaving without glue

-Digital Fabrication, 11 Spring, individual -Rhino -Critic: Kenneth Tracy

Hinge connection as structure

Project Fold forward Fold backward

Techtonics Continuous pleating to expand

Develop a techtonic that use only create structure, pattern and deta

Highly digitalized fabrication proce d

d

d

d

Detailing

Material

Mylar (0.05mm)


Casting Vortex

Casting plaster out of textile

-Digital Fabrication, 11 Spring, team leader, 3 PPL -Rhino -Critic: Christine Yogiaman

FORMCORE MOLD

PUT THE PIANO WIRE INTO THE HOLES ON THE WIRE-HOLDER

FABRIC IN CENTER

WIRES ARE ARRANGED IN THE WAY THAT LOOKS LIKE A SPIRAL

WITH INFILL PORT AND WIRE-HOLDER

AFTER WE POUR PLASTER INTO THE MOLD, THE FABRIC AND WIRE CREATE A BULGED SURFACE


Chengzhi CAI ADDRESS 150-44 78 rd. Flushing, NY-11367 PHONE +1-314-484-5627 EMAIL chengzhic@wustl.edu


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.