Skylar Compliance and Performance Overview


THE SKYLAR PROJECT: FÁBRICA NETWORK 300 NEW TORONTO STREET, SUITE 3600, M8V 2E8 TORONTO, ONTARIO, CANADA TEL: +1 647 977 9176 or TEL: +1 888 788 8034, FAX: +1 888 588 1945 EMAIL: INFO@THESKYLARPROJECT.COM

© The Skylar Project 2011. All rights Reserved

NOTICE OF CONFIDENTIALITY This document including any information transmitted with it is intended only for the use of the addressees and is confidential. If you are not an intended recipient or responsible for delivering the message to an intended recipient, any review, disclosure, conversion to hard copy, dissemination, reproduction or other use of any part of this communication is strictly prohibited, as is the taking or omitting of any action in reliance upon this document. If you receive this document in error or without authorization please notify us immediately or otherwise and permanently delete the entire document from any computer, disk drive, or other storage medium.

1


THE SKYLAR PROJECT: FÁBRICA NETWORK 300 NEW TORONTO STREET, SUITE 3600, M8V 2E8 TORONTO, ONTARIO, CANADA TEL: +1 647 977 9176 or TEL: +1 888 788 8034, FAX: +1 888 588 1945 EMAIL: INFO@THESKYLARPROJECT.COM

International Building Code Compliance Fact Sheet Overview Provide modular building structures for residential and commercial applications that meet and exceed International Building Code compliance.

Description Wall and roof systems designed from light gage steel, EPS and EFIS materials. All raw materials are accepted in regular building practices internationally. The unique fabrication process utilizes these products in a modular construction form. All fasteners meet or exceed building regulation internationally.

Exterior Material •

Exterior EFIS (cement like material) to meet and exceed international Building Code 2004 Exterior EPS (Expanded Poly Styrene) to meet thermal performance values of R15 on average. Exterior IBS Roof System engineered and tested to meet any dead load requirements for the International Building Code 2004. Exterior Roof tile or shingle to meet International Building Code 2004. Exterior windows and doors to meet or exceed energy compliance as well as air, water and structural requirements. Low E coatings available to achieve higher U-­‐ Values.

• • • •

Internal Material •

Internal EFIS and EPS material help achieve even higher thermal performance. Exceeds R15 with this option (performance up to R60 is also possible) Internal Drywall allows a minimum of 45 min fire rating where required. Interior light gauge studs within EPS walls are a minimum of 18 gauge which exceed International Building Regulations for exterior walls being 24 or even 26 gauge. All Steel members to be a minimum of galvanized or galvalume 90. This exceeds general building code which is generally galvalume 40 or less. All interior plumbing and electrical to be International Code Complaint.

• • • •

Conclusion All raw materials and fastening methods are derived from current accepted building code compliance products. Skylar building can be adapted to meet code in virtually any country.

2


THE SKYLAR PROJECT: FÁBRICA NETWORK 300 NEW TORONTO STREET, SUITE 3600, M8V 2E8 TORONTO, ONTARIO, CANADA TEL: +1 647 977 9176 or TEL: +1 888 788 8034, FAX: +1 888 588 1945 EMAIL: INFO@THESKYLARPROJECT.COM

Skylar Wall Panel Product Performance Test

Test Method

Criteria

Results

Air Leakage

ASTM E 283

No Criteria

Water Penetration ICC ES (AC 212)

ASTM E 331

Drainage Efficiency ICC ES (AC 235) Accelerated Weathering

ASTM E 2273

No water penetration beyond the inner-most plane for the wall after 15 minutes at 137 Pa (2.86 Psf for drainage systems and after 2 hours at 300 Pa (6.24 Psf) for barrier systems Minimum Drainage Efficiency of 90% No deleterious effects after 2000 hours

0.6l/min/m2 (0.002 cfm/ft2) Passed

Freeze Thaw (formerly EIMA 101.01) Impact Resistance (formerly EIMA Std. 101.86) Transverse Wind Load

Fire Resistance Intermediate Multistory Fire Test

Full Scale Multi-Story (corner test)

ASTM G 155 Cycle 1 ASTM G 154 Cycle 1 (QUV) ASTM E 2485

Passed No deleterious

No deleterious effects after 60 cycles

Passed – No deleterious effects after 90 cycles

ASTM E 2486

No fracture of reinforcing mesh

Meets all requirements in each mesh category

ASTM E 330

Withstand positive and negative loads as specified by the building code

ASTM E 119 NFPA 268 NFPA 285 (UBC 26-9)

No effect of a rated wall assembly 1. Resist flame propagation over the exterior surface 2. Resist vertical spread of flame within combustible core/component of panel from one story to the next 3. Resist vertical spread of flame over the interior surface from one story to the next 4. Resist lateral spread of flame from the compartment of the fire of origin to the adjacent spaces Resist flame propagation over the exterior surface

Minumum 4.3 kPa (90 Psf)* 16 inch o.c. framing, .5 in. sheathing screw attached at 203 mm (8 inch) o.c. Passed 1 hour

ANSI FM 4880

Passed

Passed; No height restrictions for Outsulation of Outsulation Plus MD

Additional product performance information is available on request. Product performance may vary according to specific implementation, as building code and engineering specifications may call for additional criteria to be considered.

3


For more information, contact:

ENGLISH EATON DONALD THE SKYLAR PROJECT: Fテ。RICA NETWORK

300 New Toronto Street, Suite 3600 Toronto, Ontario, M8V 2E8 TEL: +1 647 977 933 9090, FAX: +1 888 588 1945 EMAIL: Eaton.Donald@TheSkylarProject.com

PORTUGUESE MANUEL LIMA THE SKYLAR PROJECT: Fテ。RICA NETWORK

300 New Toronto Street, Suite 3600 Toronto, Ontario, M8V 2E8 TEL: +1 416 8915818 FAX: +1 888 588 1945 EMAIL: Manuel.Lima@TheSkylarProject.com


Š The Skylar Project 2011. All Rights Reserved


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.