Ottagono, July/August 2013

Page 9

BACKSTAGE / 145

Ottagono 262 07-08/2013

IL GALLIA DURANTE IL CANTIERE E

(SOT TO)

PRIMA DELL’INTERVENTO. AL NUCLEO STORICO SI E R A N O A G G I U N T I Q U AT T R O EDIFICI DISOMOGENEI. THE

HOTEL GALLIA

BUILDING SITE AND

(BELOW)

T H E S TAT E P R I O R

TO THE REFURBISHMENT.

THE

HISTORIC NUCLEUS

H A D B E E N E X PA N D E D WITH FOUR DISSIMILAR BUILDINGS.

IL NUOVO INTERVENTO RECUPERA L ’ E D I F I C I O A N N I T R E N TA E S O S T I T U I S C E LE ANNESSIONI SUCCESSIVE CON U N R E G O L A R E V O L U M E D A L L E F A C C I AT E IN VETRO E PIETRA. THE REFURBISHMENT RETRIEVES THE

1930S

BUILDING AND REPLACES THE

ADDED BLOCKS WITH A HARMONIOUS U N I T W I T H G L A S S A N D STO N E FAÇA D E S .


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.