CPC-2009-598-SP August 6, 2012 DRAFT
B. Street Wall & Massing. 1.
Street Wall. A minimum percentage of the Street Wall shall built to the property line or anywhere within the allowable setback area (pursuant to the Setback Table on the previous page. See Street Wall Table below.
STREET W ALL TABLE Minimum Percent of Building Street Wall at Setback
Greenways
Urban Village
Urban Innovation
Urban Center
Facing River or Arroyo Seco
NA
0%
0%
0%
Secondary Modified
NA
85%
80%
90%
Collector Modified
NA
75%
70%
80%
Local Modified
NA
65%
60%
70%
2.
Massing. Break the facade of large projects into a series of appropriately scaled buildings so that no building shall be more than 300 feet in length at the base.
C. Maximum Lot Coverage. Projects shall limit the percentage of building footprint relative to the overall site area as defined in the Maximum Lot.
MAXIMUM LOT COVERAGE TABLE Max Lot Coverage
Greenways
Urban Village
Urban Innovation
Urban Center
Maximum Buildable Lot Coverage*
25%
85%
85%
85%
Maximum Buildable Lot Coverage for projects within 300 linear feet of the bottom of adjacent edge of the River or Arroyo (River Buffer Area)*
25%
50%
50%
50%
MAXIMUM LOT COVERAGE TABLE FOOTNOTES *Existing buildings are exempt from this limitation