CASP-FEIR Volume III of III

Page 291

CPC-2009-598-SP August 6, 2012 DRAFT

B. Street Wall & Massing. 1.

Street Wall. A minimum percentage of the Street Wall shall built to the property line or anywhere within the allowable setback area (pursuant to the Setback Table on the previous page. See Street Wall Table below.

STREET W ALL TABLE Minimum Percent of Building Street Wall at Setback

Greenways

Urban Village

Urban Innovation

Urban Center

Facing River or Arroyo Seco

NA

0%

0%

0%

Secondary Modified

NA

85%

80%

90%

Collector Modified

NA

75%

70%

80%

Local Modified

NA

65%

60%

70%

2.

Massing. Break the facade of large projects into a series of appropriately scaled buildings so that no building shall be more than 300 feet in length at the base.

C. Maximum Lot Coverage. Projects shall limit the percentage of building footprint relative to the overall site area as defined in the Maximum Lot.

MAXIMUM LOT COVERAGE TABLE Max Lot Coverage

Greenways

Urban Village

Urban Innovation

Urban Center

Maximum Buildable Lot Coverage*

25%

85%

85%

85%

Maximum Buildable Lot Coverage for projects within 300 linear feet of the bottom of adjacent edge of the River or Arroyo (River Buffer Area)*

25%

50%

50%

50%

MAXIMUM LOT COVERAGE TABLE FOOTNOTES *Existing buildings are exempt from this limitation

47


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.