Tip

Page 1

City of Sumner Six Year Transportation Program 2014-2019

July 17, 2013 Public Hearing held at Council Meeting -July 15, 2013 Adopted by City Council on a vote of 6 to 1 passing on July 15, 2913, Resolution No: 1388

Public Works Department

Prepared by: Mike Dahlem, P.E.

By: Mike Dahlem

City Engineer TOTAL

PRIORITY

PROJECT

LOCATION

DESCRIPTION

COSTS

YEAR FUNDED PLANNING ROW/PERMIT

DESIGN

REMARKS CONSTRUCTION

SIX-YEAR ARTERIAL TRANSPORTATION PLAN

A-1

136th Ave. E. (Valentine)

A-2

Bridge Street Bridge Replacement

A-3

142nd Avenue East Overlay

24th St. to 16th St.

Bridge Street at White River

Improve road to minor urban arterial (truck route) standards with three lanes plus bike lanes for a total of 50 ft. width within a 72 ft. ROW. Project to be a joint project with the City of Pacific to County line.

Replace existing 220 foot span steel truss bridge.

From Tacoma Street Bridge to 24th Street Resurface roadway with a 4"overlay or rebuild with concrete.

Stewart Rd (8th St.) White River Bridge

Stewart Road at White River

This bridge would replace the existing 2-lane bridge. It will be two unequal length spans. The width will be 74 feet to accommodate 4 lanes, a sidewalk on one side and trail crossing on the other.

A-6

SR 410 ramp signals and channelization at Wahl Road. Main St. and 160th Ave. E.

At the interchange of SR 410 at 166th Ave. E. (Wahl Road) Main from 158th to 160th Ave. E.; 160th Ave. E from Main to 64th St. E.

Reconstruct West bound on and off ramps to tie into 64th Street East. Improve intersection at Main St. and 160th and improve and widen streets to minor arterial standards with bike paths and sidewalks

A-7

62nd St. from 166th Ave to 160th Ave E. From 166th Ave to 160th Ave E.

A-4

A-5

A-8 A-9

A-10

A-11

6-Yr. TIP 2014-2019

Construct 62nd St. from 166th Ave. E. to 160th Ave E. to arterial standards. Project to include signal at 166th Ave. E. and 62nd St. E. Closure and removal of E. Main St. at the Sumner-Tapps Highway East Main St. / 166th Intersection of E. Main St. and 166th Ave. intersection. The work includes removal of street section, embankment, Ave. Intersection Closure East. and culvert across Salmon Creek. 24th St. Bridge and 24th St. to 16th St.between west side of Complete corridor study. Construct bridge, connection to Golf Course corridor to E. Valley White River to East Valley Hwy. property and connection to East Valley Highway per results of study,

Traffic Avenue

Hwy. 162 / Valley Ave.

Thompson St/WB SR 410 Ramps to the Puyallup River Bridge

From City limits to North side of SR 410

Widen roadway and existing WSDOT overpass to 5-lanes. Restripe lanes and revise signal timing.

Construct additional lanes on SR 162 and reconstructing the SR 410/SR 162 interchange to a single point interchange.

Page 1

$6,800,000

Yes

2006

2009/2013

2009/2013

2014/2015

30% CERB Grant funded. STP Grant and LID for the remainder.

$12,000,000

Yes

2012

2014

2013/2014

2015/2016

Bridge is 80% funded by a Federal BRAC grant.

$1,900,000

No

2013

2014

2014

2015

Eligible for a Federal STP Preservation Grant

$14,000,000

Partial

2002

2015

2013/2014

2016/2017

$4,000,000

No

2013

2015

2014/2015

2016

$3,200,000

No

2013

2014

2014

2015

$3,500,000

Partial

2010

2015

2013/2015

2014/2016

$450,000

No

2013

2015

2014/2015

2016

$20,000,000

No

2013

2014/2016

2014/2015

2015/2017

$11,000,000

unknown

No

No

2015

2014

2017

2017

2016/2017

2016

County will contribute 71% of local share. Received $1.2 million Federal STP Grant for design portion of project. This is a WSDOT project on State hwy. There may be contribution from Sumner and other agencies. Candidate for STP Grant and developer contribution. Funding through LID and stormwater funds. Partially funded with stormwater funds or grants for stream rehabilitation. Portions may be funded by development.

2018

WSDOT lead. There may be contributions from Sumner and Puyallup.

2019

This is a WSDOT project on State hwy. There may be contribution from Sumner and other agencies.

7/17/2013


City of Sumner Six Year Transportation Program 2014-2019

July 17, 2013 Public Hearing held at Council Meeting -July 15, 2013 Adopted by City Council on a vote of 6 to 1 passing on July 15, 2913, Resolution No: 1388

Public Works Department

Prepared by: Mike Dahlem, P.E.

By: Mike Dahlem

City Engineer TOTAL

PRIORITY

PROJECT

LOCATION

DESCRIPTION

COSTS

Improve Elm St. to Collector St. standards with curb, gutter and sidewalks on each side. Work will include storm drainage facilities and utility replacement

YEAR

REMARKS

FUNDED PLANNING ROW/PERMIT

DESIGN

CONSTRUCTION

$2,359,400

partial by developers

2005

2008/2011

2007/2008

2009/2015

$185,000

Partial

2011

2012

2012

2013/2015

$2,700,000

partial by developers

2014

2016

2015

2017

COLLECTOR STREET PROGRAM

C-1

Elm St.

C-2

Parker Rd Improvements 62nd St. to Meade McCumber

C-3

Van Tassel (160th Ave. E.)

Elm St. to Main St.

Parker Road

From Main St. to 50th St. This will consist Reconstruction of existing road to Collector St. standards with curbs, of 3 to 5 projects. Developers will be gutters, sidewalks, and drainage utilities. Portions of this St. have been building 2 or 3 of these sections. completed by developer projects and sidewalk grants.

C-4

E. Valley Highway to 160th Ave. E.

The west half of this street needs to be rebuilt. Improve 160th Ave. E. to Collector St. standards with curb, gutter and sidewalks on each side. Portions may be completed as parts of development prior to this time.

$1,300,000

Partial

2008

2009/2013

Developers improve about 40% and remainder is unfunded. Portions built under sidewalk grant. A combination of developerbuilt, Street and Storm funds. A combination of developerbuilt, Street and storm funds and sidewalk grants.

2008/2013

2009/2015

ongoing

ongoing

2014/2019

ongoing

ongoing

2014/2019

Multi-year program @ $50,000/yr. to $100,000/yr Budgeted with Street Maintenance annually.

ongoing

ongoing

2014/2019

City Street Funds

2014/2019

$40,000 from city Funds

RECURRING ANNUAL PROGRAMS

N/A N/A N/A

Sidewalks

S-1

St. Overlay Program Sidewalk Replacement Program Neighborhood Traffic Control Program

City Wide City Wide Traffic calming area to be determined.

PEDESTRIAN PROJECTS Residential fill-ins and replacements Volunteer Program around town

Built by city crew and 50% grant from city Fill in gaps in sidewalks, provide repairs to existing ADA ramps, and replace ramps that do not meet current code. Continue on the educational components and install speed feed back signs at the elementary schools.

$25,000

Annual Budget Annual Budget Annual Budget

$80,000

Annual Budget

$100,000 $50,000

ongoing

$489,600 Not Funded

2010

2012

2012

2014/2019

Construct sidewalks and road improvements on Parker Road between Meade McCumber and 50th Street.

$1,400,000 Half Funded

2008

2012

20012/2013

2014

From the end of the 24th Street Bridge Trail to Sumner's south property line.

Extend from the existing 24th Street Bridge (pedestrian bridge) Trail, across the #9 Ditch to the south end of the City of Sumner's property.

$425,000

Partial

2008

2013

2013

2014/2016

Main St. to Puyallup St.

Completes trail through town.

$800,000

Not funded

2008

2015

2015

2016

Sidewalks

S-2

Safe Routes to School

Sidewalks

S-3

Parker Road from 50th Street to Meade Urban Sidewalk Program McCumber

Trails

T-4

Trails

T-5

24th Street Trail Connection Bridge Street to Fryar Ave.

6-Yr. TIP 2014-2019

Annual program to overlay and rebuild existing streets throughout the City with priorities to be set on an annual basis. Recommended annual funding level minimum of $50,000 The City will replace existing sidewalks as needed on City owned property. Modify residential streets to enhance pedestrian safety, slow traffic, and minimize cut-through.

Various locations within the City

Page 2

Continue to apply for Safe Routes to School Grants. Received a 50% Grant From TIB. Remaining funds from TIB, Safe-Routes or Non-Moterized Federal grants. Partialy funded through State RCO and Federal CMAQ funds Eligible for State RCO and Federal CMAQ grant funds

7/17/2013


MON

163RD AV E

WOOD AV

VALLEY AV BOCK AV

SUMNER AV

PARKER RD E

168TH AV E

170TH AV E 169TH AVCT E

175TH AV E

166TH AV E

166TH AV E

162ND AV E

PERRY AV SE

168TH AV E

YE

CT E

DR E

75TH ST E

76TH ST E

78TH ST E

ION EER

81S T

ST

E

171 S

SIDE

AV E

A11

RIVE R

166TH AV E

HW

170T H

DI

D

SR162 E ORTING HWY E

SO NR

147TH AV E 148TH AV E

72ND ST E

410 SR

T AV

RYAN AV

ALDER AV

LEWIS AV

BONNEY AV

ST AD IL RO 140TH AVCT E 141ST AV E

134TH AV E

GAULT ST RO BIN

E

33RD ST SE

160TH AV E

WRIGHT AV

PEASE AV

FRYAR AV

RA

TR AF FI C NA AV RR O W CHERRY AV ST KINCAID AV

AV N DE LI N

AI N M

170TH AV E

164TH AV E

162ND AVCT E

160TH AV E

E VALLEY HW YE

SR167 HWY S

127TH AV E

PERRY AV SE QUINCY AV SE

SE TA D R TEVI S

140TH AVCT E 140TH AV E

137TH AV E

136TH AV E

138TH AV E

142ND AV E

125TH A VCT

OLIVE AV SE

EAST VALLEY HWY E

BUTTE AV SE

VALENTINE AV SE

AV E 126TH 126TH AVCT E

E

C2

WILLOW ST

1

AV

AUTO LN

N RP

ER

A6

RAINIER ST

0 41

IN T

E

125TH AVCT E

DR

64TH ST E

SR

EP

25TH ST SE

E PS

AV E

A5

62ND STCT E

MEADE MCCUMBER RD E

W

80TH ST E

DR PPS AP ST

H 170T

A7

SILVER ST

VE TH A 146

E

A8

GARY ST

78TH ST E

51ST STCT E

63RD STCT E

DR

RD WY

PARK ST

VE RO RG VE RI

SHAW EER

Y

E

A10

NE

W

MAIN ST E

64TH ST E

ST

CT SR E 41 0H

C3

50TH ST E

MP

LINDEN LN

AV

H

ACADEMY ST

C1

RA

67 T

MAPLE ST

DR

RA STATE ST MP SR 410 RP N1 W

4T H

PION

MAIN ST

T

E

E

S AIN WM

T

W RIDGE DR E

48TH ST E

54TH STCT E 55TH ST E 56TH ST E

C4 S3

ST C

R

E

N

TD ES

N RD HOUSTO

R

16 SR P AM

N1

W

SR

S

IOF 1 67 C

P 7R

WASHINGTON ST

47TH STCT E

52ND ST E

EVERETT ST

MASON ST

E

A2

S PP TA

56TH ST E 56TH STCT E

EY A VE

16TH ST

ZEHNDER ST

DG RI

TE

T

55TH ST E

CT E

E

D

42ND STCT E 43RD STCT E

46TH ST E

ELM ST E

ST

PS

H UT

53RD STCT E

STCT E

46TH STCT E

HUBBARD ST 18TH ST ELM

NE M U S

P TA R-

Y HW

33 R

W TA

36TH ST E

4 4T H

C1

PUYALLUP ST

34TH ST E

SO

AV

45TH ST E

31ST ST E

163RD AVCT E

A

159TH AV E

M

E

S

C AV

VAL L

TA C O

T AV

27TH STCT E

E

E AV

P N1

32ND ST E

RO W to b e Va c a te d = 34 ,5 3 9 SF

S 171

E

RD

H 6T 15

7R

E

25TH STCT E

H AV

R1 6 PS

30TH STCT

3,000 T EFeet

TC 23RD S T 169

CA NY ON

29TH ST E

A3

1,500

E

RE ST

ยน

22ND ST E Scale: 23RD ST750 E 0 24TH ST E

DE

24TH ST E FO

5 T4 T 4

Plot Date: 6-27-13

SR

24TH ST E

D AGE R COTT

A9

E

RAM

E

SE

Note: Sidewalk Program #1, #2 and all Annual Programs are City Wide

20TH ST E

AVCT

N HWY

H 136T

67 SR1

H

S 55TH

AVCT E 131ST

6T 12

51ST S T

Trail Projects DR Truck Routes

E E

TAPP S

MA HO

SE

NT

LAKE

ST

MA

1N

W VALLEY HWY E

E 125TH AVCT E

D OL

E

RPN

Y HW

RD R

Collector Projects

QUINCY AV SE

EY

LL WE LD CA

50TH STCT E

D

E TS

SE

E S

40TH ST E

O O D

E

Arterial Projects

38TH ST E

EW

SE

WY S

E

L VAL

167 P SR RAM

ST WE

72 ND

T44 T

G

66TH ST S

Sidewalk Projects 16TH ST E

32ND ST E

ED

PL LEY WES

EEN

Y

S

W PK

1 RPN

S PP TA

SE 67TH ST

THOMAS AV

RGR

Legend

H 69T

A1

27TH STCT E

E AV S HAN NAT E WY S LLS

D HI LAN

EV E

8TH ST E

KE LA

9TH ST E

STEWART RD

AV SE ELIZABETH SE E TH L P ELIZAB

167 P SR RAM

STEWART RD SW

LAKE

E

A4

2ND ST E

Sumner 62ND LP S E 6-Year Transportation E S T S T 61S 62ND ST SE ImprovementPlan 63RD ST SE 2012 - 2017 AV SE ISAAC

BL VD

7 RPF1 S

VI TA

16 RAMP SR

JO

ROY RD SW ROY RD SE


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.